Objectives ‒Overview the ILC cryogenics design and further optimize it, to provide reliable inputs for CFS work during the ILC preparation phase. ‒Focusing.

Slides:



Advertisements
Similar presentations
Nick Walker KEK-DESY meeting 7 th March 2005.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
ILC Status Report Mike Harrison AWLC14 1 AWLC14 Fermilab May 2014 Mike Harrison.
LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Workshop Goals Marc Ross LC May, 2013 Accelerator Plenary.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
More than an idea not yet a project 1 Meeting Issues & Goals CFS-ADI Tokyo 2014 Mike Harrison.
Status of ILC Project Nick Walker – DESY ILD Meeting – Cracow –
Report from ILC CFS and Cryogenics Workshop
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Brief Introduction of KEK Linear Collider Project Office Akira Yamamoto KEK Report provided for ILC-TB Meeting,
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
The ILC Accelerator – Recent News and Goals for LCWS 2015 Akira Yamamoto (KEK/CERN) 1 1.Technical Advances in The ILC Progress Report 2015 – Post-TDR.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
ILC Accelerator Activities in Japan
Introduction and Meeting Objectives
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Summary of WG2 :CFS for staging
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Objectives ‒Overview the ILC cryogenics design and further optimize it, to provide reliable inputs for CFS work during the ILC preparation phase. ‒Focusing on optimization of locations for major components such as main-compressors and He inventory ‒Establishing the safety guideline and design Agenda (18, June) 9:00 Opening remark: Mike Harrison 9:10ILC preparation in Japan:Akira Yamamoto 9:30ILC Cryogenics design including updates: Hirotaka Nakai - focusing on the main-compressor location and He-inventory, and - necessary space on surface / underground, 10:10ILC Geological Conditions and Constraints: Tomoyuki Sanuki - focusing on vertical shaft/access location for cost-effective design 10:30Coffee break 10:50 CERN's experience for He inventory and advice: Dimitri Delikaris - focusing on He main-compressor location, and He inventory - please show us a safety training video for information, - please report the recent study. 11:20 Discussion for the ILC He inventory safety and actions required 12:00Closing remark: Laurent Tavian A mini-workshop on the ILC Cryogenics and He Inventory 1

Akira Yamamoto KEK / CERN to be presented at A mini-workshop on ILC Cryogenics and He Inventory held at CERN, 18 June, ILC Preparation in Japan

ILC TDR Layout 3 Damping Rings Polarised electron source E+ source Ring to Main Linac (RTML) (including bunch compressors) e- Main Linac e+ Main Linac ParametersValue C.M. Energy500 GeV Peak luminosity1.8 x10 34 cm -2 s -1 Beam Rep. rate5 Hz Pulse duration0.73 ms Average current 5.8 mA (in pulse) E gradient in SCRF acc. cavity 31.5 MV/m +/-20% Q 0 = 1E10

ILC Time Line: Progress and Prospect Expecting ~ (3+2) year since (middle) Preparation Phase We are here, 2014

LCC-ILC Director: M. Harrison, Deputies: N. Walker and H. Hayano *KEK LC Project Office Head: A. Yamamoto Sub-Group Global Leader Deputy/Contact p. KEK-Leader* Deputy Sub-Group Global Leader Deputy/Contact P. KEK-Leader* Deputy Acc. Design Integr. N. Walker (DESY) K. Yokoya(KEK) K. Yokoya SRF H. Hayano (KEK) C. Ginsburg (Fermi), E. Montesinos (CERN) H. Hayano Y. Yamamoto Sources (e-, e+) W. Gai (ANL) M. Kuriki (Hiroshima U.) J. Urakawa T. Omori RF Power & Cntl S. Michizono (KEK) TBD (AMs, EU) Michizono T. Matsumoto Damping Ring D. Rubin (Cornell) N. Terunuma(KEK) N. Terunuma Cryogenics (incl. HP gas issues) H. Nakai: KEK T. Peterson (Fermi), D. Delikaris (CERN) H. Nakai Cryog. Center RTML S. Kuroda (KEK) A. Latina (CERN) S. Kuroda CFS A. Enomoto (KEK) V. Kuchler (Fermi), J. Osborne (CERN), A. Enomoto M. Miyahara Main Linac ( incl. B. Compr. & B. Dynamics) N. Solyak (Fermi) K. Kubo (KEK) K. Kubo Radiation Safety T. Sanami (KEK) TBD (AMs, EU) T. Sanami T. Sanuki BDS G. White (SLAC), R. Tomas (Cern) T. Okugi(KEK) T. Okugi Electrical Support (Power Supply etc.) TBD MDI K. Buesser (DESY) T. Tauchi (KEK) T. Tauchi Mechanical S. (Vac. & others) TBD Domestic Program, Hub Lab. Facilities TBDH. Hayano T. Saeki LCC-ILC Accelerator Organization Major Task: Fix technical design parameters to be optimized, and reflect them to CFS design optimization, within a few years. 5

LCC-ILC Director: M. Harrison, Deputies: N. Walker and H. Hayano *KEK LC Project Office Head: A. Yamamoto Sub-Group Global Leader Deputy/Contact p. KEK-Leader* Deputy Sub-Group Global Leader Deputy/Contact P. KEK-Leader* Deputy Acc. Design Integr. N. Walker (DESY) K. Yokoya(KEK) K. Yokoya SRF H. Hayano (KEK) C. Ginsburg (Fermi), E. Montesinos (CERN) H. Hayano Y. Yamamoto Sources (e-, e+) W. Gai (ANL) M. Kuriki (Hiroshima U.) J. Urakawa T. Omori RF Power & Cntl S. Michizono (KEK) TBD (AMs, EU) Michizono T. Matsumoto Damping Ring D. Rubin (Cornell) N. Terunuma(KEK) N. Terunuma Cryogenics (incl. HP gas issues) H. Nakai: KEK T. Peterson (Fermi), D. Delikaris (CERN) H. Nakai Cryog. Center RTML S. Kuroda (KEK) A. Latina (CERN) S. Kuroda CFS A. Enomoto (KEK) V. Kuchler (Fermi), J. Osborne (CERN), A. Enomoto M. Miyahara Main Linac ( incl. B. Compr. & B. Dynamics) N. Solyak (Fermi) K. Kubo (KEK) K. Kubo Radiation Safety T. Sanami (KEK) TBD (AMs, EU) T. Sanami T. Sanuki BDS G. White (SLAC), R. Tomas (Cern) T. Okugi(KEK) T. Okugi Electrical Support (Power Supply etc.) TBD MDI K. Buesser (DESY) T. Tauchi (KEK) T. Tauchi Mechanical S. (Vac. & others) TBD Domestic Program, Hub Lab. Facilities TBDH. Hayano T. Saeki LCC-ILC Accelerator Organization Major Task: Fix technical design parameters to be optimized, and reflect them to CFS design optimization, within a few years. 6

CategoryWork-baseSpecific subjectGlobal Collaboration w/ Positron SourcePositron sourcePosiPol Collaboration Nano BeamATF37 nm beam 2 nm stability ATF collaboration SCRF Cavity Integration STFPower Input Coupler Tuner He-Vessel CERN-DESY-KEK CEA-Fermi/SLAC-KEK DESY-KEK (WS at CERN? Autumn. 2014) CM integrationSTF, ILCConduction-cooled SC Quadrupole Fermilab-KEK CryogenicsILCCryog. Underground He inventry High p. Gas Safety CERN-Fermilab-KEK (WS at CERN, 18 June) CFSILCCFS design prep.CERN-Fermilab-KEK Radiation SafetyILCML radiation shieldSLAC-DESY-CERN-KEK (Session during this week) Further Global Cooperation Expected 7

8 8 ILC Accelerator Technology SRF Technology Nano-beam Technology

 Quick recovery of beam size down to < 60 nm (in less than 1 day)  Good reproducibility (after machine is off for an extended period of time)  April 2014: routinely reach < 60 nm vertical beam size (low intensity)  Future Goals:  achieve beam size of 37 nm (beam-size monitor improvement required; optics for final focusing needs to be established)  achieve beam stability of a few nm and ILC-like intra-train feedback (instrumentation improvement to reach IPBPM resolution of 2 nm in the 2 ~ 3 years) April 2014: History of ATF2 minimum beam size: Beam trajectory stabilization with nm precision: Major improvements in beam-size tuning: Further improvement will be reported by the ATF2 collaboration at the IPAC14 N. Terunuma 9

SST EBOCAM KS-110 – G150KM Chamber (Stainless Steel chamber) Effort to lead industrialization technology at KEK EBWPressTrim AMADA digital-survo-press SDE t, 50stroke/min, 225mmstroke MORI VKL-253 Vertical CNC lathe Chemical process 10 More discuss w/ Y. Yamamoto, T. Saeki, H. Hayano

11 KEK (in-house) 9-Cell Cavity (KEK-01) completed, and tested, April, 2014

Required ADI Information Expected Input (for facility arrangement) Determination of DH (Detector Hall) Location ‒ IR point (including elevation) ‒ Layout of the Beam Line route and elevation Access way to DH (Vertical or Horizontal or,) Expected Input (for Cross section) Decision of the Cross-section for the main part ‒ BDS Beam Line Layout & Cross-section ‒ Shield Wall thickness in ML-tunnel (Sanami-san reported) Cryogenics Equipment layout ‒ Arrangement of He-Tank & Cold box ‒ Anti-vibration measure of the Compressor Install Method to MLT (include AH Cross-section) ‒ Cryomodules & RF, Cold box 12

ILC Candidate Location: Kitakami Area Oshu Ichinoseki Ofunato Kesen-numa 13 Sendai Express- Rail High-way IP Region

Objectives: Study relation of underground structures and surface buildings to landscape Adjust caverns and tunnels to accelerator lattice and vice versa Allocate space in tunnel for transport, installation, survey, safety, infrastructure Reserve sufficient space for beamline components Share a common vision of the project between involved people: scientists, engineers, politicians, local population, general public ILC Design Integration and 3D Modeling implemented into the ILC-EDMS: in cooperation with DESY-EDMS Team 14 B. List and H. Lars

Collaborative engineering: - Design integration, visualisation, traceability, configuration management Design integration: - Geology, Civil engineering, accelerator design, experimental groups Different user groups in remote: - ILC Community, Planning team, local team, sub-contractors Standardization: - Names, procedures, formats, conventions, design rules Engineering Data Management (EDMS) 15 Tunnel Lattice RF Distribution Cryomodules B. List and H. Lars

Topographical Survey Environmental Impact Assessment Geological Survey Basic Planning 1 annual 2 annual 3 annual 4 annual 5 annual Estimation Basic Design Detailed Design Contract Construction Phase Predesign Phase P Design Phase Contract Phase LCC Review Basic Plan Report Basic Design Document Detailed Design Document Contract Document LCC Review Investigation in the Design Phase 16 Pre Construction Schedule Long term & Medium term LCC Review

17

IP Access Design under Re-investigation 18 TDR IP point

Hybrid - A One Vertical Shaft One Access Tunnel Main Shaft Utility Shaft DR Access Tunnel DH Access Tunnel Main Shaft D18m 19

Hybrid – A´ One Vertical Shaft One Access Tunnel (for DH/DR) Main Shaft Utility Shaft DR/DH Access Tunnel Main Shaft D18m 20

Establish a cite-specific Civil Engineering Design (CFS), assuming “Kitakami” as a primary candidate site in Japan, Optimum cryogenics design to be established ‒Location of Major components, access, and He Inventory / Safety ‒Can we consider variation/combination of vertical and horizontal access? Demonstrate: Nano-beam handling at ATF, hosted in Japan SRF beam acceleration at STF, hosted in Japan Establish, in Japan, the technology with the best cost- effective approaches and industrialization, ILC Preparation in Japan focusing on to 21

Optimum Cryogenics Layout Locations of Main compressors and He Inventory, and possible variations from view points of ‒ Cost effective construction, operation, and maintenance ‒ Environment ‒ Vibration ‒ Safety for liquid-gas handling (LHe and LN2 (if necessary)) Input to CFS design ‒ Within a period of ~ one year, ‒ A goal to establish a basic consensus on the cryogenics layout, by LCWS-14, October, this year Main Subjects to be discussed 22