CLIC RF structure development meeting Structure cost study (introduction) G. Riddone, 18.08.2010.

Slides:



Advertisements
Similar presentations
ENGINEERING DESIGN OF RF STRUCTURES
Advertisements

COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
CLIC RF structure master schedule and CERN production
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
1 TD26_CC_SiC 06-September-2011 Assembly procedure of TD26_CC_SiC F. Rossi.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
Investigation threads on fabrication technologies for the CLIC X-band Accelerating Structures C. Rossi on behalf of the CLIC X-band Activity Thanks for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
HEPTech and ESS Innovation Procurement Workshop Lund Procurement at CERN and innovative procurement: Practical use cases 7 May 2013 Dante Gregorio & Myriam.
10/2007 M.Taborelli, TS-MME Structure Manufacturing, Achievements and Challenges M.Taborelli -Technology -Shape accuracy -Surface quality -Assembly accuracy.
Overview of the CLIC RF Structure Development Program W. Wuensch Second Collaboration Meeting on X-band Structures KEK,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Structures design R&D program Alessandro D’Elia-UMAN/CI and CERN On behalf of Roger M. Jones 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
CLIC-ILC meeting on costs Cost learning curves: from theory to practice Ph. Lebrun Webex meeting 17 July 2009.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Bellerophon on Pegasus S. Atieh RF structure development meeting.
TBTS Test Program & Schedule G. Riddone
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
CLIC-WS2014 M. Aicheler CLIC related Activities and Projects at Helsinki University M. Aicheler
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
Status of CIEMAT work on PETS
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
Coupled thermal-structural FEA of AS tooling for brazing of manifolds to disk stack R. Raatikainen, F. Rossi
CLIC module working group
Testing Infrastructure, Program and Milestones
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
Superconducting RF Crab Cavities
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
Presentation transcript:

CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,

Content G. Riddone, 18/08/20102  Introduction and method  Learning curves  Manufacturing flow  Parameters affecting the cost  Some comparative numbers  Cost study in industries

Introduction G. Riddone, 18/08/20103 Accelerating structures  Two cases are considered:  Accelerating superstructures in quadrants  Accelerating superstructures in disks  For both cases:  Sealed structures  Diffusion bonding at ~1000 ˚C under hydrogen  3 production lines PETS  Octants and mini tank concept  3 production lines

Method G. Riddone, 18/08/ Definition of the manufacturing flow Prototype cost based on current design Application of learning curves Calculation of cumulative cost Calculation of average unit cost Identification of the main steps Usually cost of the first third/fourfh unit

Learning curve - Theory T.P. Wright, Factors affecting the cost of airplanes, Journ. Aero. Sci. (1936) Unit cost c(n) of nth unit produced with a = « learning percentage », i.e. remaining cost fraction when production is doubled Cumulative cost of first nth units with C(n)/n = average unit cost of first nth units produced n = number per production line ≠ total number in project We have to define c(1) and a 5G. Riddone, 18/08/2010

Learning percentage G. Riddone, 18/08/20106 Typical learning percentage values (NASA Learning Curve Calculator)

Learning percentage 7 G. Riddone, 18/08/2010

Accelerating structures DISKS (142812) G. Riddone, 18/08/ Assembly and brazing couplers 6. Baking ss 6. Baking ss 5. Final bonding and assembly (HOM, manifolds), incl. RF check ss Sequence 2. Machining disks (including HOM, manifolds), QC and cleaning 2. Machining disks (including HOM, manifolds), QC and cleaning 4.Alignment and bonding disk stacks 4.Alignment and bonding disk stacks 8 couplers /cycle [35703 cycles] 4 ss/cycle [17852 cycles] 4 ss/cycle [17852 cycles] Assumptions: 1 as = 30 disks Bonding of superstructures (2 as) 4 ss/cycle [17852 cycles] a: 0.93 a: 0.85 a: Raw material a:1 a: 0.85

Accelerating structures QUADRANTS (142812) G. Riddone, 18/08/ Baking ss 6. Baking ss 5. Final bonding and assembly (HOM, manifolds), incl. RF check ss Sequence 2. Machining quadrants (including HOM, manifolds), QC and cleaning 2. Machining quadrants (including HOM, manifolds), QC and cleaning 4. Alignment and bonding structures 4 ss/cycle [17852 cycles] 4 ss/cycle [17852 cycles] Assumptions: 1 as = 4 quadrants Bonding of superstructures (2 as) 4 ss/cycle [17852 cycles] a: 0.93 a: Raw material a:1 a: 0.85

PETS (71406) G. Riddone, 18/08/ Baking Baking Final bonding and assembly (HOM, minitanks), incl. RF check Final bonding and assembly (HOM, minitanks), incl. RF check Sequence 2. Machining bars (including HOM), QC and cleaning 2. Machining bars (including HOM), QC and cleaning 5. Brazing couplers 8 couplers/cycle [8926 cycles] 8 ss/cycle [8926 cycles] a: 0.92 a: Raw material a:1 a: Machining couplers, QC and cleaning 4. Machining couplers, QC and cleaning 3. Machining minitanks, QC and cleaning 3. Machining minitanks, QC and cleaning a: 0.92 Assumptions: 1 PETS: 8 bars, 1 coupler Mini-tank concept

Some parameters affecting the total cost G. Riddone, 18/08/  Choice of learning factor (+++)  Saturation value: value above which learning stops, no average cost reduction (negligible)  Number of production lines (+)

Learning factor G. Riddone, 18/08/ CLIC

Saturation G. Riddone, 18/08/ Examples [a= 0.9]: Sat 0.8  learning process stops after 80 % of the production Cumulative cost increase 0.31 % Sat 0.5  learning process stops after 50 % of the production Cumulative cost increase 2.7 % For CLIC RF structure quantities

Influence of production lines 14 G. Riddone, 18/08/2010 (no saturation) Examples [a = 0.9]: Cost increase of 18% from 1to 3 production lines

RF structure cost G. Riddone, 18/08/ Accelerating structures Cost of test structure disk (ref. VDL) Cost of 300-mm quadrant (ref. VDL) linearly scaled to 500-mm quadrant (maybe optimistic) Cost of machining = 90 % of total Total cost of machining of AS in quadrants  = 75 % Total cost of machining of AS in disks PETS Cost of PETS 11.4 GHz (ref. VDL, Unitek) Cost of machining: 75 % of total

Two beam module cost G. Riddone, 18/08/ BREAKDOWN  RF system: 65 %  Alignment system: 10 %  Supporting system: 6 %  Magnet system: 5 %  Beam instrumentation: 5%  Magnet powering system: 3%  Vacuum system: 2.5 %  Other systems: 3.5 % The highest contribution!

Industrialization and mass production study G. Riddone, 18/08/  Launched industrialization and mass production studies in 3 industries/institutes:  VDL  KERN  VTT/HIP  CLIC structures, with HOM damping material, vacuum material,….  Cost study will include both capital and running cost (CERN cost study only running cost)  Study currently under way.  Analysis of the preliminary results confirm tendency of CERN cost study