Chapter 6. Control Charts for Variables. Subgroup Data with Unknown  and 

Slides:



Advertisements
Similar presentations
Common Cause Variation
Advertisements

Control Charts for Variables
Quality and Operations Management Process Control and Capability Analysis.
Quality Assurance (Quality Control)
1 SMU EMIS 7364 NTU TO-570-N Control Charts for Variables x-bar and R & x-bar and S charts Updated: 3/17/04 Statistical Quality Control Dr. Jerrell T.
ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
BPT2423 – STATISTICAL PROCESS CONTROL
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Goal Sharing Team Training Statistical Resource Leaders (2) Peter Ping Liu, Ph D, PE, CQE, OCP and CSIT Professor and Coordinator of Graduate Programs.
Chapter 5. Methods and Philosophy of Statistical Process Control
Agenda Review homework Lecture/discussion Week 10 assignment
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
Chapter 18 Introduction to Quality
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
Copyright (c) 2009 John Wiley & Sons, Inc.
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Control Charts for Variables
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Control Charts for Attributes
15 Statistical Quality Control CHAPTER OUTLINE
Other Univariate Statistical Process Monitoring and Control Techniques
Methods and Philosophy of Statistical Process Control
Chapter 51Introduction to Statistical Quality Control, 5th Edition by Douglas C. Montgomery. Copyright (c) 2005 John Wiley & Sons, Inc.
Statistical Process Control
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Steps in Using the and R Chart
+ DO NOW What conditions do you need to check before constructing a confidence interval for the population proportion? (hint: there are three)
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Topic 5 Statistical inference: point and interval estimate
PARAMETRIC STATISTICAL INFERENCE
Introduction to Statistical Quality Control, 4th Edition
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
IES 331 Quality Control Chapter 6 Control Charts for Attributes
Copyright (c) 2004 Brooks/Cole, a division of Thomson Learning, Inc. Chapter 16 Quality Control Methods.
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
6. Control chart for variable It is important to control over both the process mean and the process variability. –Control the process by using the x chart.
C HAPTER 6 Control Charts for Variables I NTRODUCTION Variable - a single quality characteristic that can be measured on a numerical scale. We monitor.
Chapter 7 Process Capability. Introduction A “capable” process is one for which the distributions of the process characteristics do lie almost entirely.
Chapter 7. Control Charts for Attributes
Statistical Process Control (SPC). What is Quality?  Fitness for use  Conformance to the standard.
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
1/20/2016ENGM 720: Statistical Process Control1 ENGM Lecture 05 Variation Comparisons, Process Capability.
Chapter 8. Process and Measurement System Capability Analysis
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
1 SMU EMIS 7364 NTU TO-570-N More Control Charts Material Updated: 3/24/04 Statistical Quality Control Dr. Jerrell T. Stracener, SAE Fellow.
1 CHAPTER (7) Attributes Control Charts. 2 Introduction Data that can be classified into one of several categories or classifications is known as attribute.
In the name of Allah,the Most Beneficient, Presented by Nudrat Rehman Roll#
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
Les Jones IET 603. Shewhart Control Charts for: characteristics such as: length, width, temperature and volume. 1.Understand the statistical basis of.
Chapter 51Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
Chapter 61Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Copyright (c) 2005 John Wiley & Sons, Inc.
Sampling Distributions and Estimation
Copyright (c) 2005 John Wiley & Sons, Inc.
Agenda Review homework Lecture/discussion Week 10 assignment
QUALITY CONTROL AND QUALITY ASSURANCE (Contd.)
Basic Training for Statistical Process Control
IENG 486: Statistical Quality & Process Control
Basic Training for Statistical Process Control
Process Capability.
Confidence Intervals Chapter 10 Section 1.
Steps in Using the and R Chart
Presumptions Subgroups (samples) of data are formed.
Presentation transcript:

Chapter 6. Control Charts for Variables

Subgroup Data with Unknown  and 

Phase I Application of and R Charts Equations 5-4 and 5-5 are trial control limits. –Determined from m initial samples. Typically subgroups of size n between 3 and 5. –Any out-of-control points should be examined for assignable causes. If assignable causes are found, discard points from calculations and revise the trial control limits. Continue examination until all points plot in control. Adopt resulting trial control limits for use. If no assignable cause is found, there are two options. 1.Eliminate point as if an assignable cause were found and revise limits. 2.Retain point and consider limits appropriate for control. –If there are many out-of-control points they should be examined for patterns that may identify underlying process problems.

Example 5-1

Assume spec tolerance is 1.5 +/- 0.5 micron. Nonconformance probability:

C p : Process Capability Ratio (PCR) P : % of specification band the process uses up. P can be estimated as:

Revision of Control Limits and Center Lines Effective use of control charts requires periodic review and revision of control limits and center lines. Sometimes users replace the center line on the chart with a target value. When R chart is out of control, out-of-control points are often eliminated to re-compute a revised value of which is used to determine new limits and center line on R chart and new limits on chart.

Phase II Operation of Charts Use of control chart for monitoring future production, after a set of reliable limits are established, is called phase II of control chart usage (Figure 5-4). A run chart showing individuals observations in each sample, called a tolerance chart or tier diagram (Figure 5-5), may reveal patterns or unusual observations in the data.

Control vs. Specification Limits Control limits are derived from natural process variability, or the natural tolerance limits of a process. Specification limits are determined externally, for example by customers or designers. There is no mathematical or statistical relationship between the control limits and the specification limits.

Rational Subgroups charts monitor between-sample variability. R charts measure within-sample variability. Standard deviation estimate of  used to construct control limits is calculated from within-sample variability. It is not correct to estimate  using

Guidelines for Control Chart Design Control chart design requires specification of sample size, control limit width, and sampling frequency. –Exact solution requires detailed information on statistical characteristics as well as economic factors. –The problem of choosing sample size and sampling frequency is one of allocating sampling effort. For chart, choose as small a sample size consistent with magnitude of process shift one is trying to detect. For moderate to large shifts, relatively small samples are effective. For small shifts, larger samples are needed. For small samples, R chart is relatively insensitive to changes in process standard deviation. For larger samples (n > 10 or 12), s or s 2 charts are better choices. NOTE: Skip Section on Changing Sample Size (pages )

Charts Based on Standard Values D 1 = d 2 - 3d 3 D 2 = d 2 + 3d 3 d 2 : mean of distribution of relative range d 3 : standard deviation of distribution of relative range

An assumption in performance properties is that the underlying distribution of quality characteristic is normal. –If underlying distribution is not normal, sampling distributions can be derived and exact probability limits obtained. Usual normal theory control limits are very robust to normality assumption. In most cases, samples of size 4 or 5 are sufficient to ensure reasonable robustness to normality assumption for chart. Sampling distribution of R is not symmetric, thus symmetric 3-sigma limits are an approximation and  -risk is not R chart is more sensitive to departures from normality than chart. Assumptions of normality and independence are not a primary concern in Phase I.

Operating Characteristic (OC) Function σ is known. In-control mean: μ 0 out of control mean: μ 1 = μ 0 + kσ Probability of not detecting shift: β-risk L: number of σ’s For L = 3, n = 5, k = 2.

Average run length (r): shift is detected in the r th sample. In the example. Expected number of samples for detecting shift = 4.

For Shewhart control chart: Average time to signal (ATS) Average number of individual units sampled for detection (I)

Example 5-3

Example 5-4

Sometimes it is desired to use s 2 chart over s chart. The parameters for s 2 chart are:

Shewhart Control Chart for Individual Measurements What if there is only one observation for each sample. Use the moving range between two successive samples for range.

Example 5-5

Use the d 2, D 3 and D 4 values from n = 2 row for individual measurements. Then:

Phase II Operation and Interpretation of Charts shift

Average Run Lengths ARL 0 of combined individuals and moving-range chart with conventional 3-sigma limits is generally much less than Shewhart control chart. Ability of individuals chart to detect small shifts is very poor.

Normality In-control ARL is dramatically affected by nonnormal data. One approach for nonnormal data is to determine control limits for individuals control chart based on percentiles of correct underlying distribution.

Example 5-6

Skip Section on More about Estimating σ (pages 239 – 242).