LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°

Slides:



Advertisements
Similar presentations
Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
Advertisements

P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Juhao Wu LCLS FAC 7 Apr Dark Current, Beam Loss, and Collimation in the LCLS J. Wu, D. Dowell, P. Emma, C. Limborg, J. Schmerge,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
P. Emma FAC Meeting 27 Oct Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
Accelerator Issues and Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
New 135-MeV injector energy requires minor changes to linac operating point…
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
9/22/04J. Welch, LCLS Commissioning Worskhop, SLAC LCLS Commissioning Schedule and Startup Plan LCLS Commissioning Schedule and Startup Plan.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Paul Emma Injector/BC1 Commissioning April 20, Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
Low Emittance RF Gun Developments for PAL-XFEL
Velocity Bunching: experiment at Neptune Photoinjector P. Musumeci UCLA Dept. of Physics and Astronomy.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
Paul Emma Stanford Linear Accelerator Center July 2, 2002 Paul Emma Stanford Linear Accelerator Center July 2, 2002 High Brightness Electron Beam Magnetic.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Diagnostics Overview for the LCLS Presented by Josef Frisch For the LCLS ANL / LBNL / LLNL / SLAC.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
W.S. Graves 2002 Berlin CSR workshop 1 Microbunching and CSR experiments at BNL’s Source Development Lab William S. Graves ICFA CSR Workshop Berlin, Jan.,
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.
X-band Based FEL proposal
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Sara Thorin, MAX IV Laboratory
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Short pulse, low charge LCLS operation
Thermal emittance measurement Gun Spectrometer
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Commissioning Status of the LCLS Accelerator and Undulator Systems
Injector/BC1 Commissioning (Jan. 2, 2007 through Aug. 31, 2007) P
Injector Commissioning C
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
LCLS Injector Commissioning P
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Introduction to Free Electron Lasers Zhirong Huang
Injector Diagnostics Status
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
LCLS e- Beams Systems Manager
SuperKEKB required (e+ / e-)
Presentation transcript:

LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0° BC1 L  6 m R 56   39 mm BC2 L  22 m R 56   25 mm DL2 L =275 m R 56  0 DL1 L  12 m R 56  0 undulator L =130 m 6 MeV  z  0.83 mm    0.05 % 135 MeV  z  0.83 mm    0.10 % 250 MeV  z  0.19 mm    1.6 % 4.30 GeV  z  mm    0.71 % 13.6 GeV  z  mm    0.01 % Linac-X L =0.6 m  rf =  21-1 b,c,d...existing linac L0-a,b rfgun 21-3b24-6d X 25-1a30-8c Commission in Jan Commission in Jan. 2008

MMJJJJAASSOONNDDJJFFMMAAMMJJJJ Drive-Laser Install Drive-Laser Commissioning Gun/Inj./BC1 Commissioning May2006 Gun/Inj./BC1 Install linac/BC2 Install First Spont. Light linac/BC2 Commissioning LCLS Installation and Commissioning Time-Line LTU/undulator Commissioning LTU/und. Install AASSOONNDDJJFFMMAAMMJJ JJ FEL Comm. undulator hall ready First FEL Light

Q = 1 nC f = 120 Hz G = 120 MV/m  x,y = 1  m  t = 10 ps I = 100 A RF Photo-Cathode Gun

Slice emittance >1.8  m will not saturate courtesy S. Reiche P = P 0  N = 1.2  m P  P 0 /100  N = 2.0  m electron beam must meet brightness requirements

Complete & Detailed Design (cathode to dump) BC2LTU undulator L3 L2 cathode Full MAD deck at:

after BC1 after X-RF after L1 after DL1 after BC2 after L3 at und. after L2  z = 830  m  z = 190  m  z = 23  m  z = 190  m energy profile phase space time profile Bunch Compression Progression

Location of Main Linac Diagnostics 5+ energy spread meas. stations (optimized with small  )...existing linac L0 rfgun L3L1 X L2  x,y EEEE EEEE EEEE EEEE 5+ emittance meas. stations designed into optics (  x,y ) BPMs at or near most quadrupoles and in each bend syst. RF deflectors for slice  and  E measurements (L0 & L3) EEEE EEEE EEEE EEEE EEEE EEEE T-cav. T-cav.

Slice-Emittance Measurement Simulation RF-deflector at 1 MV slice OTR 10 times  y  bunch length quad scanned 135 MeV

Slice-Emittance Measurement Simulation slice-5 Injector (135 MeV) with S-band RF-deflector at 1 MV = meas. sim. = calc. = y distribution = actual (same SLAC slice-  code used at BNL/SDL) (slice- y -emittance also simulated in BC1-center) DL1 slice-emit on WS02

Transverse RF deflector RF Gun gun spectrometer YAG screen YAGscreen OTR screen & wire YAG screen YAG & OTR OTR screen & wire YAG screen main SLAC Linac Gun/Injector Diagnostics injector spectrometer trajectory (BPMs) emittance (+ slice) energy spread (+ slice) bunch length (+ dist.) charge (+ dark current)

Injector Through BC1 Commissioning  x,y and slice EEEE EEEE RF deflector no laser-heater until 2007

Injector Through BC1 Commissioning (2)  x,y EEEE  E  slice  y stopper relative bunch length monitors X-band RF BC1

Linac-To-Undulator (LTU) 4  -wires, 6 collimators, 1 OTR energy centroid & spread meas. (OTR) (3  10  5 & 10  4 ) + collimation vertical bends  vertical bend 4.7 mr  horizontal jog 1.25 m  energy diagnostics  emit. diagnostics  bunch length diag.  collimators  CSR cancellation  branch points for future undulators  spontaneous undulator possible  vertical bend 4.7 mr  horizontal jog 1.25 m  energy diagnostics  emit. diagnostics  bunch length diag.  collimators  CSR cancellation  branch points for future undulators  spontaneous undulator possible

Enhanced CSR in BC1

Emittance of RF Photo-Cathode Gun Micro-Bunching Instability Bunch Length Monitors CSR in BC1 and BC2 Impedance in BC2 Vacuum Chambers Space-Charge Effects in BC1 Region Chromatic Correction for Highly Chirped Beams Improved LTU Lattice Undulator Wakefields FEL Commissioning and Tuning Start-to-end Simulations and Integration with LCLS Controls ESASE/Replicator Optical Klystron Gain Enhancement Seeded and Self-Seeded FEL for Next Phase of LCLS Development of an X-band Transverse RF Deflector Multi-bunch LCLS and Regenerative Amplifier FEL Harmonic Afterburner