Architectural Control Committee Heritage Hills 3195 Heritage Hills Blvd. Clermont, Florida 34711 PH: 407-656-9600 Fax 407-656-9608 Community Name: Heritage.

Slides:



Advertisements
Similar presentations
New York City Department of Education Charter Matching – Facilities Upgrades/ Capital Improvements – FY 2014.
Advertisements

STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Step 1: Facility Use Application A. Applications can be found on the Facility Use web page along with NHCS Facility Use Procedures and Board Policy 4500.
DHS Family and Community Support Center Prevention Assistance Fund Patricia Erwin-Blue Michelle Wylie-Williams John Bowen Rich Kirschner February 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
1 Replacement Reserve Escrow Disbursement Process Training April 2012 CHFA – The Connecticut Housing Finance Authority 999 West Street, Rocky Hill, CT.
BCC APPEAL PUBLIC HEARING ON BZA #VA , OCTOBER 2, 2014 APPLICANT/APPELLANT: JOSE HOLGUIN Orange County Zoning Division DATE: December 2, 2014.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
Solar Panels and HOAs – One Homeowner’s Experience Presented To: Solar Washington General Meeting By: Don Stimson Date: March 4, 2015.
Planning Permission Process and Procedures
CATEGORIES OF COMMENTS REGARDING THE DOWNTOWN MOTOR APARTMENTS From October 28 th meeting.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Tenant Package Coldwell Banker Pioneer Real Estate Property Management Division Sunnymead Blvd. Moreno Valley, Ca off (951) fax (951)
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Arbor Lakes Addition Homeowner’s Association, Inc Annual Meeting May 16th.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Tournament Residency and Age Verification The Little League Tournament A-Z.
AGENDA Program Features Eligible/Ineligible Improvements
An Appeal of a Request For a Special Use Authorization For a Solar Energy Power Plant Docket SUA Appeal of Rainbow Solar Facility.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
James Moir Senior Lawyer JS Mueller & Co
Blasting Regulations Proposed Changes to The Existing Ordinance.
Program Compliance Review Overview IFTA Annual Business Meeting Las Vegas, Nevada July 21-22, 2006 Presented by Dick Beckner Debora Meise Jay Starling.
SAPPHIRE POINTE Architectural Control Committee (ACC) Design Standards – Fence ACC Rev 0 - June 2014.
Procedures for Applying for an Alternative Oyster Culture Permit Oyster Advisory Committee April 18, 2013 ________________________________________.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Arapahoe Estates Community Annual Meeting February 26, 2009.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
1 ICAOS 2008 Rule Amendment Presentation for Deputy Compact Administrators & Compact Office Staff Presented by:
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
Hindu Cultural Center 450 Albany Shaker Rd, Loudonville, NY Phone: (518) / RENTAL.
Board of County Commissioners PUBLIC HEARING September 22, 2009.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Atrezzo Provider Portal Outpatient Case Creation July 2015 INTEGRATED CARE MANAGEMENT AND QUALITY IMPROVEMENT 1.
Objectives At the end of this unit, you should be able to:
EAC Voting System Certification Process (Test Plan) - 3/21/05
Board of County Commissioners PUBLIC HEARING June 22, 2010.
Atrezzo Provider Portal Inpatient Case Creation July 2015 INTEGRATED CARE MANAGEMENT AND QUALITY IMPROVEMENT 1.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Community Development Department Special Exception Vehicle Rental and Leasing St. Joe Plaza.
Cultural Resources office — St. Louis Planning & Urban Design Agency an introduction.
Somerset Village Playground KEENE’S POINTE CAMDEN TOT LOT Lake Burden Playground Bedford Village Playground Community Activity Area Proposed Camden Village.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Permit Process & Application Guide
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4 June 9, 2009 Environmental Protection Division Environmental Protection.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
Mike Ellis Executive Director – Property + Projects
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
Review of Current Ordinance:
UNDERSTANDING AND WRITING ACCESS PROPOSALS
MODULE C - LEGAL SUBMODULES C1. Conflict Of Interest/Code Of Ethics
SECURITY DEPOSIT RECEIPT
City Council Meeting November 14, 2016
Board of County Commissioners
Environmental Protection Division
12 A: 113 Crestview Circle Variance Request City Council June 18, 2018
12 D. Variance Request – 211 Jennifer Lane
Presentation transcript:

Architectural Control Committee Heritage Hills 3195 Heritage Hills Blvd. Clermont, Florida PH: Fax Community Name: Heritage Hills Property Owner: ____________________________________________________________ Homesite: __________________________________________________________________ Home Address:______________________________________________________________ ___________________________________________________________________________ Home Telephone Number: ________________________________________ E: Address:______________________________ Information About the Architectural Change You Are Seeking Mark One o Landscape Change o Driveway (Pavers or Painting) o Electrical / Lighting o Satellite Dish o Roof Replacement o Hurricane Shutters o Screen / Patio Enclosure o Patio / Deck Installation o Other (Specify) ___________________________________________________________ Please describe the type of change you are seeking approval for. Please specify any materials to be used and colors involved. _________________________________________ _________________________________________ _________________________________________ Revised 11/26/09 Page 1 of 2

ATTACH THE FOLLOWING TO YOUR REQUEST  Copy of your property survey, marking the area where the work will be performed on your home-site.  Contractor’s License & Certificate of Insurance.  Copy of Contractor’s Contract.  Common Area Security Deposit (If Applicable – Call for Information). PLEASE READ AND SIGN THE FOLLOWING ACKNOWLEDGEMENT ∙∙∙∙∙∙ Date Received: ______________________Control Number:_____________________ Date Sent to ACC: ___________________Disposition: APPROVED DENIED CONDITIONS IMPOSED: _____________________________________________________________________________________ _____________________________________________________________________________________ SIGNATURE OF ACC: _____________________________________DATE:__________________________ DISPOSITION LETTER SENT TO APPLICANT: __________________________BY:___________________ Architectural Change Request - Revised 11/26/09  ONLY the owner of the subject property may make application for alteration or change.  Application DOES NOT guarantee approval. Any approval must be received in writing prior to marking the alteration sought in this application.  Architectural Change Approval is based upon the aesthetics of the proposed change and does not certify the construction worthiness or structural integrity of the change proposed.  Applicants are SOLELY responsible for calling the appropriate utilities BEFORE digging to have all underground services marked. Applicants are SOLELY responsible for any damage or costs associated with restoring service. Applicants are SOLELY responsible for damaged irrigation.  Applicants are SOLELY responsible for following all building codes, obtaining permits and adhering to set-back requirements when making the change.  Applicants MAY NOT deviate in any manner from the plan, once / if approved. Any change will require PRIOR WRITTEN approval. Signature of Property Owner: __________________________________Date:___________________ ASSOCIATION USE ONLY No later than sixty (60) days after receipt of all information required by the ACC for final review, the ACC shall approve or deny the application in writing. The ACC shall have the right to refuse to approve any plans and specifications which are not suitable or desirable, in the ACC’s sole discretion, for the aesthetic or any other reasons or to impose qualifications and conditions thereon. In approving or disapproving such plans and specifications, the ACC shall consider the suitability of the proposed improvements, the materials of which the improvements are to be built, the site upon which the improvements are proposed to be erected, the harmony thereof with the surrounding area and the effect thereof on adjacent or neighboring property. In the event the ACC fails to respond within said sixty (60) day period, the plans and specifications shall be deemed disapproved by the ACC. Page 2 of 2