Mathew Nirenberg AE Senior Thesis Structural Option.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
NATIONAL HARBOR BUILDING M 120 Waterfront St. Oxon Hill, Maryland Ryan Sarazen – Structural Option Senior Thesis Presentation – Spring 2008 Faculty Consultant.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC.
VIRGINIA ADVANCED SHIPBUILDING & CARRIER INTEGRATION CENTER John Boyle Structural Option Thesis Advisor – Dr. Behr NEWPORT NEWS, VA Source: Clark-Nexsen.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
RiverView Condominiums II Chicago, IL
Presentation transcript:

Mathew Nirenberg AE Senior Thesis Structural Option

Existing Building 28 Stories Primarily Residential –Lofts, Condos, and Penthouses Includes Parking and Commercial Space Location –Suburban Miami, Florida –Part of a “New Downtown” Mathew Nirenberg - Structural Option

Current Building Structure –Concrete 4 to 10 ksi –Post-Tensioned Slabs 8-9.5” thick 5 ksi All but S.O.G. and 22 floor –Mat Foundation 5’ thick Sitting on array of auger-cast piles Mathew Nirenberg - Structural Option

Current Building –Other Aspects of the Building Elevated pool Trailer location Separated air handling systems Mathew Nirenberg - Structural Option

Proposal for Investigation Depth –Column Gridding –Gravity Members –Lateral Resistance Breadth –Electrical Add recessed lighting into units Calculate resulting changes to panel and feeder –CM Estimate difference in cost between Concrete and Steel Building Mathew Nirenberg - Structural Option

Column Gridding Only efficient way to use steel Goals: –Use good bay ratio 1: –Have all columns lie within walls / existing columns Mathew Nirenberg - Structural Option

Column Gridding Mathew Nirenberg - Structural Option

Gravity Loading Based on prescribed loads from existing building Largest loads on 8 th floor for fitness facilities Composite construction is useful on nearly all members –Some larger perimeter beams overstressed the concrete Mathew Nirenberg - Structural Option

Lateral Loading Seismic is Minimal –Not even accounted for in original design Large Wind loads –150 mph –Easily controlled design Mathew Nirenberg - Structural Option

Lateral Framing Tried to use as many braced frames as possible Limited number of column pairs within walls Forced to go to moment frames Began to engulf entire grid Mathew Nirenberg - Structural Option

Lateral Framing Mathew Nirenberg - Structural Option *Red indicates lateral frame

Lateral Framing Mathew Nirenberg - Structural Option *Red indicates lateral frame

Lateral Deflections Total Building –47.8” Individual Stories –1.6” Mathew Nirenberg - Structural Option Neither is Acceptable Many Possible Solutions

Drift Solutions More Places for Braced Frames –Grid friendly floor plans Location –Less Exposure –Lower Wind Speed Mathew Nirenberg - Structural Option

Drift Solutions When placed in 90mph wind region –16” in critical direction Compared to 13” of real structure Some stiffer frames may be possible Mathew Nirenberg - Structural Option

Breadth Studies Electrical –Loads from increasing lighting within the unit Construction Management –Cost comparison between two structural systems Mathew Nirenberg - Structural Option

Electrical Additions New suspended ceilings encourage use of lights within space Added lights require more circuits in the space Also increase loads on some existing circuits Mathew Nirenberg - Structural Option

Layout Mathew Nirenberg - Structural Option

Circuit Comparison Mathew Nirenberg - Structural Option Existing Electrical Panel Proposed Electrical Panel

Estimate Concrete Structure –Forms = $2.41 Million –Reinforcing = $1.1 Million –Post-tensioning = $4 Million –Concrete = $1.2 Million –Finish and Cure = $200,000 –Total = $9.1 Million Mathew Nirenberg - Structural Option

Estimate Steel Structure –Steel Members = $2 Million –Deck = $300,000 –Concrete = $300,000 –Concrete Accessories = $350,000 –Total = $4 Million –Plus Fireproofing, etc. = $15 Million Mathew Nirenberg - Structural Option

Uncalculated Differences Savings from smaller foundation –Lighter steel does not need 5’ mat –Approximately $700,000 Added cost from additional electrical components –Depends on quality of components Mathew Nirenberg - Structural Option

Conclusions Steel is not viable with given constraints Can work if building is originally catered to its use Electrical system is a reasonable addition if steel is used –Not necessary as the structure currently is Cost off steel offsets faster construction Mathew Nirenberg - Structural Option

Thank You A special thanks to: Gary Ferguson of Terra Developers Turner Construction & Eugene Crosby of Gorman Consutling Engineers For supplying me with information, documentation, and site access to enable me to do this project All the AE Faculty who answered questions over the past year And my fellow AE students who were always around to answer random questions as they arose Mathew Nirenberg - Structural Option Questions?