Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Compressor status AWAKE Technical Board meeting 19 May 2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Installation of the T600 at Fermilab CSN2, September 22,
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
ELENA installation progress F. Butin / ELENA collaboration.
DT-LHCb coordination meeting 18 April 2016
Jefferson Lab High Power Beam Dump Refurbishment
System layout in PS ring and possible evolution
TAXS and TAXN ABSORBERS - OVERVIEW
PSS Plans for Improved Reliability and Availability
1.3-GHz Cavity Vacuum Furnace at IB4
News and brief overview of Beamline plans for the next few months
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Anthony DiPette Installation / Vacuum Group Leader 7/17/2015
John N. Galayda – Director of LCLS Construction March 30, 2009
J. Seeman Assistant Director for PPA/LCLS
Installation of Photon Beam Transport to FEH
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Hall C Dump Status Beam Resuscitation Review
ISRC and LEBT Vacuum System Design
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Beam Dump Upgrade Planning Keith Welch 2/5/13

Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers Ion chambers – Uncertainties in beam transport – Vulnerable hardware in “zone of death” – ALARA – 1/3 of all dose collected since 2009 involved dump work (> 3 person-rem) Goals for Upgrade – Ensure dumps are ready for operations in 12 GeV era – Simplify maintenance – Reduce downtime – Provide robust dump protection and diagnostics – Reduce operational cost and dose

Dump Upgrade Scope Upgrade beam transport hardware – Replace helium tubes and upgrade helium blanket system – Semi-static, pressure demand helium system – Vacuum-to-helium interface modification Upgrade dump protection hardware – Be diffusers redesigned for 12 GeV – looking at possible passive cooling – Ion chambers – CERN design, retrievable – Beam position monitor to replace “burnthrough detector” Replace dump cave air treatment systems with dry nitrogen inerting systems – N 2 generator(s) – Improved atmospheric isolation (wall integrity) Upgrade beam transport diagnostics – Viewer system with tune and CW operation capability – Upgrade camera mechanical mounting and shielding package – Ion chamber test apparatus

Dump Upgrade Scope Other scope – Evaluate shielding in isolation wall – Install “trolley” system for insertion of inspection/measurement equipment into caves – Replace dump entrance windows – Inspect dump internals – Test and reconfigure (if necessary) H 2 sensors

Conceptual Design Overview Tunnel dehumidification system eliminated Hall A ion chamber test rig standardized Radiation hard ion chambers, cables, position monitor Viewers for pulsed and CW beam Replace burnthrough monitor with position monitor Upgrade diffuser Move isolation wall, ion chamber test plate Extend vacuum pipe, add diagnostics Replace dump window N2 purge Upgraded ion chambers Replace helium line, upgrade supply system

Status Engineering underway – Diffuser modeling – Helium line design – Position monitor – New ion chamber evaluation Scheduling – Strawman schedule – Input from most resource providers Initial visual inspection of tunnel completed

Dump Upgrade Timeline (preliminary guess) Hall A is the critical path First beam is scheduled mid-March, How much of the installation can/must be complete by then? - More runs to Hall A scheduled later in 2014 (August, December?) Hall A Milestones (assuming no hall work until late March ‘14) TaskUpgrade done by July ‘14 Design/Engineering complete9/13 Major hardware procurements10/13 Hardware onsite1/14 Beam pipe tearout3/14 Dump inspection/test4/14 He/vac pipe install4/14 Tunnel atmospheric controls, helium system, etc.5/14 Diagnostics, monitoring hardware, etc.6/14