Tank plumbing 250 Telone 1/2013. Dip tube connection on Left Nitrogen Connection on Right.

Slides:



Advertisements
Similar presentations
Getting Started with the EELD601 After you remove your EELD601 from the box, check to make sure you have all accessories shown below. Click here for next.
Advertisements

Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
PALOMINO VALLEY GID WATER SOURCES Truckee Meadows Fire Protection District.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Kegging and Draft Systems. Kegging Pros: Time Ease of cleaning Carbonation precision No sediment – good for comps Potentially lower long term costs Easy.
Connecting to industry. Fittings for Steam Hose Remember Steam is……… minimum 212 F.
Oxyacetylene Torches.
1 HVACR316 – Piping Torches, Tanks, and Tips. 2 Soldering Basics Soldering is a process used to join piping and tubing to fittings. It is used primarily.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Max Sluiter - Andrew Del Prete - Travis Nicholas Final Design Review for Cal Poly EE 470/471 Alternative Vehicle Fuels For A Sustainable Future Professor.
- Flexible Hoses- Ring Housing - Nitrogen Tank-Collection Cylinder - High Pressure Water Tank- Flow meter - Gas Regulator- Water Filter - Pressure.
CAFS On-Line Orientation
OXY-ACETYLENE TORCHES Protect your head and eyes by wearing proper welding goggles or face shields equipped with a minimum shade 5 lens. Protect your.
SWEEP CHARGE PROCEDURE Page SWEEP CHARGE EQUIPMENT & SAFETY TANK OF LIQUID REFRIGERANT DO NOT: Drop or handle tank roughly Tamper with the safety.
Presented By. HIGHLY SUGGESTED ITEMS  Condescent Dryer  Chiller  An additional in-line filter  Coalescing Filter  Any and all of these items will.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
Metal Cutting Processes Flexible Manufacturing
CAFS On-Line Orientation
Dennis Sabre Fire Appliances
9/30/04AME 470 – Team Unum Team Unum Connection System to Air Source and Inflatables PDR # 4 September 30, 2004.
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Equipment.
Connecting to industry 1. 2 Safety Break-away Couplings.
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Water Handling Operations
Water Supply Skill Drills.
STAINLESS STEEL VESSEL HOUSINGS SANITARY INSTALLATION PARTS SP-AT-3025,3050MHF 정수시스템.
© Oxford University Press Tubes Sudden death What could make the blood flow hard to stop? Oetzi’s death was quick. An arrow cut one of his arteries.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
By Charlie Farmer. Safety comes first  Always make sure you turn the gas off once you have finished.  Always start with the safety flame.  Have the.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
5535K41Polypropylene Cam-and- Groove Hose Coupling Plug, 1-1/2 Coupling SizeIn stock at $2.53 Each.
High Sucrose Soybean Thin-Layer Chromatography (TLC)
1 HVACR316 - Piping Torches, Tips, Tanks Torches, Tips, Tanks.
Plumbing Tools ˚ Pipe Elbow 45˚ Pipe Elbow Making a 45 degree turn with a pipe.
1 HVACR316 - Piping Piping Applications Brazing Piping Applications Brazing.
Oasis Wildlife Water Systems announces a limited time and limited quantity offer! We have ten 100 gallon tanks that can be converted directly into fill.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Diesel Fuel - Fill Place all spill safety equipment where needed
Workshop Sponsored by: Home Grown Food Rain Barrel for Under $40.
Notes 1.The valves and connectors are standard 15 mm plumbing fittings. 2.Reinforced plastic pipes used, as they tolerate the heat better than clear plastic.
Oxyacetylene Start Up/Shut Down Procedure Prepared by Dr. Dale Carpentier and Mr. Barry Brazelton Monroe Area High School Modified by Georgia Agriculture.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
Tips on how to winterize your lawn sprinkler system Benefits of using Lawn Sprinkler Systems.
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Pipe specials.
Overview Hose Assembly PRECISION MACHINING Fitting Manufacturing
ENVIROGUARD WASHOUT SYSTEMS
R1 Fundamentals of Refrigeration
Pipe Fittings.
Oxyacetylene Start Up/Shut Down Procedure
FIGURE 33-1 A typical fuel tank installation.
EXAMPLE-#1 Connection at Meter Service
R1 Fundamentals of Refrigeration
Shutting Down the Cutting Outfit
CAFS On-Line Orientation
How do fluid systems work?
RTD - Ready-To-Dispense Dilution Control Chemical System using Quick Connect hookup at The College of William & Mary.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Job Performance Requirement 10-15
Instructions: Adding refrigerant fluid to system
Start Up Procedures and Recommendations for Factory Authorized Equipment Start Up.
Irrigation Kits Parts Components
Presentation transcript:

Tank plumbing 250 Telone 1/2013

Dip tube connection on Left Nitrogen Connection on Right

Telone dip tube valves Top valve Main shut off ¾” 3 way valve controls product direction. In this position product leaves tank and goes to application equipment. Valve turned 90 degrees line is now in position to fill tank ½” 3 way valve allows product to flow from tank to application equipment. When turned 90 degrees nitrogen line can be coupled to purge system for maintenance. Also from this connection flushing material can be used for preparing machine for storage.

Telone fill stand ¾ male brass tip ¾ X 4” stainless nipple ¾” brass coupler ¾” brass king nipple

¾ npt X ½ barb king nipple 2 pcs ¾” X 1 ¼” Poly bushing Poly strainer Blue filter ¾” X 4” stainless nipple

Fill line ¾” Kuritec Hose 8’ long from male fill quick coupler to 3way valve to fill. tank