Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.

Slides:



Advertisements
Similar presentations
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Advertisements

MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Housing report to the Portfolio Committee on the 15 th January 2008.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
Preparing for an inspection Do you have instruction to inspect Have you got terms and conditions Fees paid Access details confirmed Preparing for an inspection.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Iron Ore Holdings Ltd Buckland Project & Northern Quoll: adaptive mine design and management 30 July
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Eagle Heights Development Proposal Consists of two sets of development applications and two property ownerships: Paletta and Taylor lands. Paletta is applicant.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Corby North Eastern Sustainable Urban Extension. Corby North Eastern SUE Comprises 1.Priors Hall (Bela Partnership) 2.Weldon Park (Charles Church/Persimmon.
Surplus City Property – Request for Proposals Administration & Finance Committee February 1, 2012.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
Moloto Road (R573) Safety Investigations
PRELIMINARY DRAFT not for circulation
Washoe County Board of Adjustment
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Jefferson County Planning Commission Hearing April 10, 2013
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Architectural Drafting
MBABANE INFORMAL SETTLEMENTS UPGRADING PROJECT EXPERIENCE
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Application for Zoning Amendment
PRELIMINARY DRAFT not for circulation
Official Plan and Zoning By-law Amendment Application
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Presentation transcript:

Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review of housing plan for JOE SLOVO 137

Feasibility and Review of Housing Plan Joe Slovo 137 April 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) INTSIKA YETHU LOCAL MUNICIPALITY PO Box 11, Cofimvaba, 5380 Tel: (047) Fax: (047)

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9 Future plans of other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Cadastral Layout Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1Ownership Annexure 2Title Deed Annexure 3S.G. Diagram

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS BLMCBiodiversity Land Management Class CBACritical Biodiversity Area CRUCommunity Residential Unit ECBCPEastern Cape Biodiversity Conservation Plan ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Komani Park as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of five Human Settlement Project feasibility reports for Municipality. It is designed so that it can be part of a single document that includes the other five projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner: Intsika Yethu Municipality Property Description: Portion of Erf 181 and Rem. Erf 1 Cofimvaba Title Deed Number:T6139/1974 and (See Annexure 2) Servitudes: None (See Annexure 3) Site Size:36.1 Ha The Joe Slovo 137 project is an urban project in Cofimvaba within Intsika Yethu Municipality. It is a busy retail and service centre. It comprises informally constructed dwellings on a formal but unapproved layout. There is also a small extension of informal dwellings, informally laid, abutting the northern boundary of the combined school that link the formal layout to Plantation Street and the CBD. Cofimvaba is the main administrative seat for Intsika Yethu Municipality. It is classified a rural town with the role of a Primary Local Centre to the adjacent rural hinterland. Cofimvaba is located centrally in the municipality 77 km east of Queenstown and 145 km west of Mthatha along the R61 Road. Joe Slovo is a settlement situated within the Cofimvaba commonage, north of the town and is accessed off Market ad Plantation Streets gravel access routes off the Cofimvaba main road. The site has been invaded by middle income earners and is envisaged to become an integrated community with low and middle income dwellers residing in the area. Currently the land is surveyed and has RDP standard services installed. The roads are not tarred and houses have been constructed informally.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 9 Locality Plan Figure 2.1.1

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 10 Aerial Photograph Figure 2.1.2

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 11 VISUAL SURVEY Figure a. Construction by middle income dwellersb. Poor muddy informal roads within Joe Slovoc. 200m radius stand pipes installed d. Mud house constructed by low income residentse. Formal house under constructionf. Cofimvaba Forest Reserve

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 12 STATUS OF HOUSING PROJECTS AND WAITING LISTS subsidies were originally proposed for Joe Slovo. The project is now reduced to 137 subsidies. These units will comprise individual subsidy onto existing erven. The site has been surveyed and some residents reside on erven marked out on a registered General Plan. The project was initially envisaged for low income housing, however it has now been invaded by middle income dwellers. The waiting list has been requested from the municipality and is still awaited for this project. Figure 2.2.1Statistical Background JE SLOVO (137) Population (IYLM SDF 2013)Not Specified Population (2011 Census)Not Specified Ex. Units (IYLM SDF 20...)Not Specified No. Households (2011 Census)Not Specified Proposed Units (EC DHS)137 Waiting List (IYLM LM)Awaited

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 13

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which the site is located is a portion of Erf 181, Cofimvaba and a small piece of land in the north west corner of the site infringes onto erf 1, Cofimvaba is indicated on Noting Plan No /1953, as well as Surveyor General Plan No 1913/1935. Erf 181 and Rem Erf 1 are both owned by the Intsika Yethu Local Municipality, see Annexure 1 and 2. The site has been surveyed and contains approximately 680 erven, however it appears the erven have not yet been registered at the Deeds Office. The S.G Diagram was registered at the Surveyor - General in 16/07/1953.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 15 Cadastral Layout Figure 2.3.1

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 17 Engineering (Kantey and Templer) Figure 2.4.1

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 18 ENVIRONMENT 2.5 The site is situated on relatively flat land. There are no formally protected areas. There are no wetlands or Critical Biodiversity Areas impacting the site. The Cofimvaba River flows north and east of the site. The existing cadastral layout appears to be appropriately set back from the river. The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 3: other natural areas as per SANBI data (2007) and therefore is subject to BLMC 3 guidelines according to the ECBCP. This must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project. BLMC 3 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are permitted with conditions of approval upon environmental authorisation. However, it can be seen on Fig that CBA 3 is shown as extending over most of the urban areas of Cofimvaba. This is clearly incorrect and the mapping of CBA 3 in this vicinity has not been ground-truthed and amended. For any future housing development, the following should be taken into consideration: Housing development needs to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). In which, a basic assessment would be required for: –The expansion of: (i)jetties by more than 50 square metres; (ii)slipways by more than 50 square metres; or (iii)buildings by more than 50 square metres (iv)infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 19 Environment Figure 2.5.1

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 20 GEO-TECH 2.6 Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is suitable for further development of these areas. Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites. (Outeniqua Geotechnical Services cc, 2013)

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 21 Geo-tech Figure The Site

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 Taking into account the 1km walking distance buffer from the site, the following findings are compiled: There are no facilities are located on site, see Fig Two secondary schools and a combined school are located within a 1km walking distance from Joe Slovo. The Cofimvaba hospital is located along the R61, approximately 2km from the site, see Figure The police station servicing the area is situated in Cofimvaba town, within 1km walking distance. This proposed Human Settlement Project will not require the provision of additional facilities.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 23 Distribution of Social Facilities Figure 2.7.1

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 In 2013, a Local Spatial Development Framework was produced for Cofimvaba. Joe Slovo falls within the Cofimvaba commonage. Properties along the north and eastern boundaries on the registered cadastral fall on or within the 50m river setback line proposed by the Cofimvaba Local SDF. However, the existing buildings on site fall outside of the 32m floodline setback for EIAs. The road layout in Joe Slovo is currently informal, however the secondary corridor of the Cofimvaba is proposed to pass through the area. The Human Settlement Project is in line with the SDF, however development is restricted to land beyond the 50m setback line from the Cofimvaba River.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 25 Current Spatial Development Framework Figure The Site

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP The Bulk Sewer project and the upgrading of roads are envisaged to occur in Ward 14, which comprises the entire Cofimvaba town. These projects will impact all urban Human Settlement Projects in Cofimvaba. Joe Slovo has two more projects envisaged, namely the installation of stormwater pipes and drains by CHDM as well as an electrification project by Eskom.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 27 APPROVAL BY COUNCIL 2.10 The Council Resolution is awaited from the Municipality.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY The site was inspected on 28/10/2013 and the conclusions below ground-truthed. There are adequate engineering services. (K&T to confirm) There are no major environmental concerns affecting the proposed Human Settlements Project with the possible exception of a few plots that may be located closer than 32m to the bank of the Cofimvaba River. However, even if these plots require an EIA or cannot be developed this should not affect the feasibility of the project as it only comprises 137 subsidies on nearly 600 plots. It should not require an EIA. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. The project comprises 137 subsidy units onto existing erven. The beneficiary list is awaited from the municipality There are no new social facilities required to support the proposed human settlements project. The Human Settlement Project is in Line with the SDF. The Council Resolution is still awaited from the municipality RECOMMENDATIONS The project is feasible. In light of this assessment, it is recommended that the award of subsidies can proceed in Joe Slovo.

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 29 ANNEXURE 1: OWNERSHIP PRINTOUT

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 31 ANNEXURE 2: TITLE DEED

JOE SLOVO FEASIBILITY STUDY CNdV africa (Pty) Ltd2 June 2016 page 33 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM