In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich.

Slides:



Advertisements
Similar presentations
SUSTAINABLE WATER MANAGEMENT Walter Z. Tang Valdu Suurkask Fall, 2009 EKV8360 3,0 EAP Department of Environmental Engineering.
Advertisements

2014 NWHA CONFERENCE Doug Johnson, P.E. Portland Regional Engineer.
Flood Profile Modeling with Split Flows and Weirs
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
Pond and Wetland BMPs, Retrofitting Detention Basins.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation.
Design of Hydraulic Controls & Structures
Sept 4, 2008CVEN 4838/5838Slide #1 Lecture 4 Spillways and Outlet Works.
CE 230-Engineering Fluid Mechanics
CE HYDRAULICS ENGINEERING
Watson Fish Screen By: Bryan Heiner August 2014
RETROFITTING EXISTING SWM PONDS BETTER THE SECOND TIME AROUND Lise Soukup, P.E. Environmental Engineer City of Rockville, Maryland.
Hydro Power Plant Prepared by: Nimesh Gajjar
Plan Review Required Materials [ARM (3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,
Design of Bypass Systems Special thanks to Ed Meyer, who provided the framework for most of these slides.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
CHAPTER 9 Copyright © 2007 Thomson Delmar Learning 9.1 Water Supply.
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
Lecture 1 Water Distribution Systems
Directed Inspection & Maintenance At Compressor and Gate Stations
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Cowichan Lake and River status update Trend updates as of July 27, 2015.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
Middle Fork Project Project Description April 25, 2006.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
September 4, 2012 California Department of Water Resources Central Valley Floodplain Evaluation and Delineation (CVFED) Program Presented for the FMA 2-D.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
In-Delta Storage Program Water Quality Field Investigations Stakeholders Committee Meeting January 22, 2003 Robert DuVall.
Quality of Water Q litres Time to Collect Water secs Volume Flow Rate Q litres/min Pump 1 Inlet Pressure P 1 bar Pump 1 Outlet Pressure.
Head works.
In-Delta Fish Screen Facilities Delta Wetlands Proposed Facilities and Basis for Re-Engineered Facilities.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Water resources engineering Giannis Kleopa. What is a water resources engineering? Water resources engineering is the profession that is responsible for.
Basic Hydraulics: Culverts – I
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Project Status South Delta Improvements Program Project Status November 2003.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Basic Hydrology & Hydraulics: DES 601
Multi-objective Optimization
Calibrating a Complex Environmental Model to Historic Data San Francisco, October 25-26, Goldsim User Conference Presented By: Alan Keizur, P.E.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
Corps of Engineers BUILDING STRONG ® Interim Operating Pools Jerry W. Webb, P.E., D.WRE Principal Hydrologic & Hydraulic Engineer Hydrology, Hydraulics.
San Gabriel Valley From Stormwater to Supply
In-Delta Storage Program Reservoir Operations Stakeholders Committee Meeting January 22, 2003 Pal Sandhu.
Hydro Power MAKWANA VIPUL B.( ) BHAGAT ARJUN C. ( )
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce.
Assoc. Prof. Dr. Tarkan Erdik
Engineering Technology Division
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
In-Delta Storage Program
Green Line Extension Project
Issue 4b - Addressing Local Degradation -
In-Delta Storage Program
Sacramento Environmental Commission January 2019.
In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich.
In-Delta Fish Screen Facilities
Presentation transcript:

In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich

Four Integrated FacilitiesFour Integrated Facilities –Two on Webb Tract; Two on Bacon Island –Purpose is to combine all operational components into a single facility for more efficient operations Operational Components include:Operational Components include: –Fish Screen –Inlet/Outlet structures –Pumping Plant –Bypass Channel –Goal is to maximize gravity flow and minimize pumping to reduce operation and maintenance costs Reservoir Island Flow Control Structures

Four Integrated Facilities Two on Webb Tract and Two on Bacon Island

Integrated Facility Components Components Fish Screen Trash Rack Bypass Channel Pumping Plant River Reservoir Gate Structure Sheet Pile Wall River Pumping/Gravity Conduit Engineered Embankment Forebay Mid-bay Afterbay Transition Pool

Integrated Facility Diversion Flow Paths Integrated Facility Diversion Flow Paths Diversion From River Reservoir River

Integrated Facility Release Flow Paths Integrated Facility Release Flow Paths Release To River Reservoir River 1 3 2

Integrated Facility Diversion & Release Flow Paths Integrated Facility Diversion & Release Flow Paths Release To River Reservoir River Diversion From River

Key Features of Integrated Facility Fish Screen is isolated from other controls with a transition poolFish Screen is isolated from other controls with a transition pool Storage diversions and releases can occur when the river and reservoir are at different levels, allowing for year-round operationsStorage diversions and releases can occur when the river and reservoir are at different levels, allowing for year-round operations Diversions and releases are optimized with gravity flow and pumping combinationsDiversions and releases are optimized with gravity flow and pumping combinations Required flow under gravity is possible with small head differencesRequired flow under gravity is possible with small head differences Low pool level and pumping units allow for complete drainage of reservoir when necessaryLow pool level and pumping units allow for complete drainage of reservoir when necessary

Ongoing Work Finalizing design criteria and procedures for hydraulic analysis and structural designFinalizing design criteria and procedures for hydraulic analysis and structural design Performing hydraulic analysis to optimize sizes for the fish screen, inlet outlet structures, pumping plant, and bypass channelPerforming hydraulic analysis to optimize sizes for the fish screen, inlet outlet structures, pumping plant, and bypass channel Preparing structural design for all Integrated Facility componentsPreparing structural design for all Integrated Facility components Coordinating with:Coordinating with: –DWR’s Division of Engineering –USBR –Central Valley Fish Facilities Review Team (CVFFRT) –Consulting Teams CVFFRT has been briefed on the proposed fish screen design, facility layout, and overall operationsCVFFRT has been briefed on the proposed fish screen design, facility layout, and overall operations –CVFFRT gave a positive response to the proposed concept