Some steps to disseminate and exploit Bruno Apolloni Brussels, 31/3/2014.

Slides:



Advertisements
Similar presentations
Partnering with Faculty / researchers to Enhance Scholarly Communication Caroline Mutwiri.
Advertisements

Cultural Heritage in REGional NETworks REGNET Information Dissemination.
Cultural Heritage in REGional NETworks REGNET. June 2002REGNET Project 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT ICCS ZEUS VALT.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT.
Round Table Brussels09. Partnership levels Round Table Brussels 09.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Online Submission and Management Information -- Authors
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
ScholarWorks at WMU Western’s Scholarly Repository Faculty Senate Maira Bundza November 10, 2011.
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
Supported by the European Commission, contract number: Fission , and the Research.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
COGAIN Kick-Off Tampere, Finland WP 7: Community Outreach Inger Kirk Jordansen
WP 6 Dorota Pawlucka Progress Meeting Amersfoort,
Automated Benchmarking Program using ENERGY STAR™ Portfolio Manager.
Multilateral Project for Transfer of Innovation Project Duration: 24 months Partners’ Kick-off Meeting, November 2009, Sofia Tanya Pancheva/University.
R. Szilágyi, P. Lengyel, M. Herdon Hungarian Association of Agricultural Informatics.
Geneve, 28th August 2002 – EDG Retreat 1 Dissemination & Exploitation Demonstrations and Promotional Material Mauro Draoli
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
SME Policy – Beyond the crises Steiermark/Croatian Regions Brussels, 28 May 2009 Daniel Gassmann, Head of Sector Services, Quality and Reporting Executive.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
WISDOM WP7 Dissemination & Exploitation Start M0, End M42 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
1° Review meeting Recognition of the SandS project Bruno Apolloni Brussels, 31/3/2014.
Rome, January 2014 European Commission Information Society and Media General Assembly GALA Game and Learning Alliance The European Network of Excellence.
WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
WP 9: Dissemination of results and exploitation RENESENG kick off, Athens, Nov 2013.
TOGETHER WITH EBA – REALITY AND NEW PERSPECTIVES SILVIA RADU PRESIDENT EBA MOLDOVA.
WP04: Wireless Networking Libelium David Remón & Anartz Nuin Brussels, March 31, 2014 Midterm Review1 31/03/2014.
ResistVir 18 months meeting (WP7) Work package 7 (WP7) Dissemination and technology transfer The deliverables of WP7 D21 First technology transfer workshop.
Management issues. Objectives Reinforcing the coordination and collaboration among beneficiaries Improving the visibility of the project (dissemination.
How do I search the Internet? Narrow your topic and its description; pull out key words and categories.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
Here we are 3rd review meeting Cartif-Brussels 17/12/2014.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP10: Dissemination, Transfer and Exploitation Review.
EDINET PROJECT DISSEMINATION ACTIVITIES. DISSEMINATION Dissemination activities will be continued for the period of project realization, to be contributed.
Dr. Samuel Marcos Pablos, CARTIF Foundation, Spain.
Online Submission and Management Information -- Authors AMS Annual Conference / AMS WMC Click on play to begin show.
Intermediate Exploitation Plan December 17 th, 2014.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
The Air & Waste Management Association An Opportunity for the Environmental Professional.
WP7 - workshop. Project newsletter – Electronic format Partners’ mailing lists – Inform about partners’ participation in InterQuality – Ongoing information.
S 1 Annual Meeting 2013 Crediting EC contribution Open access requirements Chiara Bearzotti NACLIM project manager.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
RENAISSANCE project IST Project consortium RENAISSANCE IST project virtual renaissance court 4Coordinator: Giunti Multimedia ( I.
StratusLab is co-funded by the European Community’s Seventh Framework Programme (Capacities) Grant Agreement INFSO-RI StratusLab Sustainability.
LINKVIT KICK-OFF MEETING ROME 28TH OCTOBER 2013 WP 6 Dissemination and Exploitation.
WP7 - Dissemination of Results & Exploitation
WP9: Dissemination and Exploitation
TCLT Learning Technologies
WP 7 – Dissemination and Network Development
Governing Board Meeting Maria MAIA
WP7 - Dissemination of Results & Exploitation
WP8: Outreach and Liaison
ERASMUS+ KA2 PROJECT: Enhancement of study programs in Public Health Law, Health Management, Health Economics and Health Informatics in Montenegro “DISSEMINATION.
How Dynamic Website Designs are Ruling the Digital World?
What Are Institutional Repositories?
PLUG-N-HARVEST ID: H2020-EU
BioMedBridges – Work Packages 2 & 12
Presentation WP7 Dissemination & Exploitation
to promote World Birth Defects Day,
Best Debt Management Company California
MARDS DISSEMINATION & EXPOILTATION
University “Mediterranean” Podgorica & University of Montenegro
Please register with Dr. Lucy Lee
WP2-DCO Dissemination, Communication & Outreach Month 3 Report
Global Certifications: Certified Internal Auditor® (CIA®)
Presentation transcript:

Some steps to disseminate and exploit Bruno Apolloni Brussels, 31/3/2014

conventional multimedia mockups Flyers Conferences Scientific papers Exhibitions Magazines Tradeshows Specific networks Local professional happenings Active demos accessible via web Serious games Questionnaires Three main lanes to disseminate

Conventional Flyers, Posters, MP4 presentations Conferences: 13 worldwide conferences Scientific papers: 16 international proceedings papers, 2 of which under publication on scientific journals Exhibitions: 3 in the past year, 3 already delivered or accepted in this year

Magazines ( Tradeshows ( ) Specific networks ( nd_design/eu_projects) nd_design/eu_projects Local professional happenings ( Multimedia

Active demos accessible via web ( Serious games ( Questionnaires ( Mockups

Enter the mockup Enter the project website Our presentation via a few QRcodes Play appliances Play a serious game

The long trip toward exploitation Moral suasion versus associations such as Legambiente to stress the green value of our social networks Contacts with companies, such as Ignis, Whirpool and Electrolux, to show the benefits of our ecosystem Progressing a University spinoff to exploit the project results (appliance telmedicine, remote maintenance, etc.).

IPR matter Main thread: open hardware/open software Consortium agreement signed by the partners before the beginning of the project, A repository opened in the SandS website where partners voluntarily upload the codes produced for the project. Currently, around 200 MB have been uploaded by 6 partners

Participant Person- months per participant UNIMI1,2 AMIS0,5 ARD0,5 NTUA0,87 CARTIF0,71 GORE0,13 LBL0,25 UPV0,52 TOTAL4,68 WP9 in synthesis MONTHS IN PROJECT MONTHS IN PROJECT TaskTask description T9.1General plan T9.2Project image T9.3Social&Smart web site T9.4Multimedia Promotion T9.5 Events on scientific journals T9.6Dissemination via WEB T9.7 Dissemination and use plan T9.8 Interfacing with validation T9.9Exploitation plan D9.1/2 D9.3