Instituto de Plasmas e Fusão Nuclear Instituto Superior Técnico Lisbon, Portugal B. Gonçalves | Lisboa, February 6, 2010 | IST.

Slides:



Advertisements
Similar presentations
QuEdge Testing Process Delivering Global Solutions.
Advertisements

Service Delivery – your ticket to play
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
Robert D. Walla, Larry A. Hacker, Ph.D. Astrix Technology Group 1090 King Georges Post Rd Edison, NJ LIMS Selection In A Forensic Toxicology Laboratory.
ITIL: Service Transition
Digital Rights Management © Knowledge Books & Software, 2012.
CNRIS CNRIS 2.0 Challenges for a new generation of Research Information Systems.
Requirements Analysis SDM b518.ppt © Copyright De Montfort University 2000 All Rights Reserved INFO2005 Requirements Analysis Systems Development.
*Instituto de Plasmas e Fusão Nuclear Instituto Superior Técnico Lisbon, Portugal A. Fernandes | Lisboa, May 24, 2010 | RT2010.
Lesson-11 Information System Development
Project Work and Administration
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
ESS VIP project on Validation
Project Management Methodology (PMM)
Procurement From the 20 th to the 21 st Century Copyright Byron Honoré This work is the intellectual property of the author. Permission is granted.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
The Premier Software Usage Analysis and Reporting Toolset Maximizing Value for Software Users.
Development plan and quality plan for your Project
Business process management (BPM) Petra Popovičová.
Software Configuration Management
Oversight CHAPTER SIXTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CONTRACT MANAGEMENT. Introduction  Contract Management (also known as Contract Administration) is used to manage contracts that are made with partners.
COMPUTER SOFTWARE ALISA RAHMANI PUTRI / VIDIYA RACHMAWATI /
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
S/W Project Management
IT Project Management Cheng Li, Ph.D. August 2003.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
MIND DYNAMICS 1. 2 INTRODUCTION / BACKGROUND BRAIN FLOWER is a unique organization which helps their participants to realize their mental potential,
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
Rational Unified Process Fundamentals Module 4: Disciplines II.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 ETM 5121 Project Proposal Determination of How to Handle Contract Craftsmen Employees in the SAP Plant Maintenance Module of ABC, Inc.’s Illinois Refinery.
Jörg R. Müller, Technical University of Braunschweig
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Eurostat Expression language (EL) in Eurostat SDMX - TWG Luxembourg, 5 Jun 2013 Adam Wroński.
SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, s Scope of CC 6.1.
WORKFLOW. What is workflow A system to manage and monitor working processes Defining and tracking the flow of work between individuals and/or departments.
Refrences: Information Technology Project Management, Sixth Edition(ch#3) Note: See the text itself for full citations.
CLARIN work packages. Conference Place yyyy-mm-dd
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
PROJECT LIFECYCLE.
Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
Project Management Cross lifecycle Activity
Project Management 6e..
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Information Security IBK3IBV01 College 1 Paul J. Cornelisse / George Pluimakers.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
CO – CART Project Status Protocol Revision Subcommittee Update 08/17/2006.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
ITIL: Service Transition
What is the Best Way to Select an EHR
What is Software Test Automation?
Chapter 6: Database Project Management
Chapter Objectives To understand the operational environment in which you execute your project To understand the need and role of oversight in managing.
Copyright © Simon Wallace
Chapter 3: The Project Management Process Groups: A Case Study
The system of state aid control in the Czech Republic
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Presentation to Project Certification Committee, DoIT August 24, 2008
Presentation transcript:

Instituto de Plasmas e Fusão Nuclear Instituto Superior Técnico Lisbon, Portugal B. Gonçalves | Lisboa, February 6, 2010 | IST IPFN project lifecycle an insider analyis Bruno Soares Gonçalves

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 2 Management of the IPFN project lifecycle has become crucial Number of projects and tasks has increased Essential keeping track of all project documentation and status Optimize reporting while reducing burden on management structure and reporting preparation periods Cost efficiency Management of project deliverables, e.g. publications, IPR, etc This is just an exercize to start the discussion towards a solution that suits IPFN needs Rational

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 3 IPFN projects life cycle

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 4 Well established workflows and procedures Centralized and coordinated databases and software tools –Document management system –MGP –Assiduity Standardize forms –Project summary –Manpower summary –Financial information –Purchase order What is required

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 5 Proposal phase

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 6 Contract signature phase

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 7 Project opening phase

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 8 Execution phase

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 9 Reporting phase

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 10 Closing phase

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 11 Publications management Requires Publication database User interface (pinboard) Established workflow and procedures Publications management has a broader scope than the project management and should incide over the whole organization

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 12 IPR monitoring Aim: This methodology will provide a continuous monitoring of project activities to indentify the deliverables capable of the generation of IPR. The validation procedure will assess the IPR value of each deliverable. I ST Legal department crucial for help the process of applying for patent or other statutory intellectual property rights. I PR management will be systematically followed to protect the rights of IPFN If a patent or other statutory intellectual property rights are conceded,

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 13 The developed procedure probes all project deliverables to identify valuable IPR: Patents and patent applications Utility models Software Data and databases Copyrighted work Requires Database Workflow and procedures IPR management system

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 14 IPR management system

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisboa, February 6, 2010 | IST 15 Thinking about organization Still thinking….