Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS AND COMMITTEES
Decisions of the 55 th Meeting with PCBs/PCCs ( ) Consolidated requirements on; (a)Laboratories (b)Computerisation (c)Staffing (d)Infrastructure (e)Common Waste Management facilities (CETPS, TSDF, CBMWTF)
SUMMARY/ ABSTRACT
TOTAL REQUIREMENT Rs crores
COMPONENTS 1Laboratories:Rs crores 2Computerisation:Rs crores 3Infrastructure:Rs crores Total:Rs crores
STAFFING NEEDS (ADDITIONAL REQUIREMENTS) 1Additional requirement scientific/ Technical / Computer : Existing staff Scientific/ Technical :
COMMON WASTE MANAGEMENT FACILITIES FacilitiesRequirementsExisting CETPs TSDF3627 CBMWTF86177
ANALYSIS OF REQUIREMENTS (Rs. in crores) {LABORATORY} < >10 AndamanArunachalAssamAndhra Pradesh LakshadweepBiharDelhiChhatisgarh ChandigarhGoaGujarat Daman DiuKarnatakaHaryana HimachalKeralaJammu & Kashmir ManipurPunjabJharkhand MeghalayaUttrakhandMadhya Pradesh MizoramMaharashtra NagalandOrissa PudducherryRajasthan SikkimTamil Nadu TripuraUttar Pradesh West Bengal
Groupings of Total Requirement (Rs. in crores) < >50 AndamanArunachalAndhraHaryana ChandigarhAssamJharkhand Daman DiuBiharMadhya Pradesh LakshadweepChhattisgarhRajasthan ManipurGoaTamil Nadu MeghalayaDelhiUttar Pradesh MizoramGujarat NagalandHimachal PudducheryJ&K SikkimKarnataka TripuraKerala Maharashtra Orissa Punjab Uttrakhand West Bengal
BLUE PRINTS ON STRENGTHENING 1 Madhya Pradesh 2 Assam 3 Lakshadweep 4 Uttar Pradesh 5 Mizoram 6 Tripura 7 Nagaland 8 Himachal Pradesh 9 Goa 10 Manipur 11 Tamil Nadu
CONTENTS OF BLUE PRINT 1.Introduction 2.Need of the Document 3.Present status of Pollution Control 4.Mandates & Activities 5.Present set-up of Board 6.Goals for Pollution Control 7.Proposal for strengthening 8.Co-ordination with State agencies 9.SPCB and Public involvement 10. Conclusion
BASIS OF ESTIMATES Laboratories:Gradation/ Locational needs : Central A Zonal / Regional B Need based C Compliance Monitoring Parameters prescribed: source/ Ambient Performance of ETP, CETP, APCD, TSDF. Special Tasks: Hazard Assessment Accident management Ambient monitoring State-specific R&D
CAPABILITIES OF LABORATORIES ParametersA – GradeB –GradeC -Grade Physical Inorganic General & Non metals Organic1394 Trace metals28189 Microbiological752 Bio-assay532 Bio-monitoring861 Hazardous Waste600 Soil, Sludge, Sediment Ambient Air15105 Source Emission18 6 Noise+++ Vehicular emission433
COSTING OF LABs In Crores ABC Instruments Parameters Water waste water Hazardous waste 07 Air/ Emission3040
BASIS OF ESTIMATES Computerisation1. Linkages RO HO CPCB 2. Data Management & Reports Infrastructure: No rented Premises for Lab Monitoring vehicles for timely transportation of samples; and enhancing monitoring frequency. Un-interrupted lab functioning- Power back-up
STAFFING NEEDS Project Fellows : Analytical support on job training (PG/PhD) Regular Scientist/ Engineer : Concentrate on specific jobs, R&D to keep scientific tempo. Administration & Finance : Optimal requirement
TOTAL REQUIREMENT Rs crores
CURTAILING REQUIREMENTS OPTIONS OUT-SOURCING ( may be not possible, Need money again)
DRAFT PROPOSAL (Funding Formula) Central Government State Government Own Resources of SPCB/PCC Bilateral programme Time Frame
THANKS TO ALL i.MEF and MoEF for support & looking for further Directions ii.28 SPCBs and 6 PCCs for support and co-operation. iii. Chairman CPCB for hammering