Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
EFET comments on obstacles to trading November 2007 Obstacles to Electricity Trading in Central & Eastern Europe – latest development.
XVIII Madrid Forum Madrid, September 2010 Wholesale energy trading licenses in the EU Johannes Kindler, Vice-President Federal Network Agency Germany.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Organization of the electricity market and renewable energy sources in the Republic of Croatia" Dubrovnik, 2 nd October th Dubrovnik Conference.
2006 APEX Conference Seoul, October 31, 2006 SESSION 4: Experiences in how to deal with market stress situations. José Javier González Market Operations.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE Challenges in transitioning to a liberalised, competitive market – Romanian experience.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
© Copyright 2006 EFET The importance of common intra-day markets and balance settlement methods Hartmuth Fenn 2nd Northern Europe Electricity Miniforum.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
Baltic Electricity Market Mini-Forum June 3, 2006 Riga, Latvia Electricity Licensing Rules in Lithuania Kestutis Zilenas Head of Licensing department National.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Energy sector regulation in Estonia Märt Ots Director General, Estonian Competition Authority 15th Anniversary Conference Tallinn
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
ELECTRICITY MARKET IN BULGARIA an attempt for realistic point of view Lubos Pavlas Regional manager of CEZ for Bulgaria Sofia,
Balancing electricity market and future of the organized market in BiH
GEORGIAN ELECTRICITY MARKET OPERATOR
The 3rd package for the internal energy market
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Regulators’ update on Congestion Management and Balancing
International Conference
Update on European Network Codes
Walter Boltz Chairman, CEER Gas Working Group
International Energy Conference Energy Security of South East Europe and the National Security A view on gas market liberation Sofia – June 15th,2018.
Presentation transcript:

Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting 7 th November 2007

2 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 CEE Priority Issues Short term 2006/2007: -Congestion Management with full implementation of CM Guidelines -Information management and transparency in line with the ERGEG Guidelines of Good Practice -Identification of and dealing with market entry barriers -Coherence and harmonization of the regulatory competences Mid term >2007 -Balancing markets integration -Market design issues of relevance for regional market The issues of market entry barriers, Congestion Management and transparency have been in focus so far; The other issues have not yet been addressed with full priority, partly because they cannot be resolved only by regulators

3 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 CEE Priority Issues by Eurelectric Market entry barriers of legal and technology nature Congestion Management TSO cooperation Long term contracts and price regulation Infrastructure investments – regional planning

4 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 Market Entry Barriers by EFET -Administrative and bureaucratic procedures, e.g.: -Licensing & subsidiary requirements -Congestion Management, e.g.: -No adequate maximizing of capacities -Firmness of capacities -Use of technical profiles -Historical long term cross-border reservations -Market Transparency, e.g. -Lack of ex-ante generation information -Market liquidity and standardization (Power Exchanges) -Lack of transparent and reliable prices Congestion Management and Transparency are already dealt with, but annual capacities reduced at some borders; Administrative issues and adequate wholesale market development not yet addressed in a systematic way

5 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 CEE General Market Situation -Generation capacities in the CEE region are rather concentrated -Some countries are moving towards further reduced generation capacities  market is becoming more tight -Market participants have increasing interrest to export towards South-East Europe -Power Exchanges do not always exist – for existing PEX significant differences in liquidity and products are identified If national markets become tight – imports and exports become increasingly important Beneficial situation for buyers and sellers

6 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 Promising Steps (Poland)... Situation June 2006 * Situation November 2007 So far nominations were limited to entities with a physical connection to the grid) - trader-to-trader nomination was not allowed Since 1st of July 2007 each trader possesses "physical scheduling unit" on the balancing market. Nominations between traders possessing such “scheduling units” are feasible Liquidity is limited due to the long term PPAs blocking ~ 50% of capacity New law releasing energy from long term PPAs, in force since August This is based on voluntary participation of generators. Beginning of 2008, the deadline for generators to join this program Capped end-user with free wholesale pricesPolish Regulator announced that from 1st of January 2008 all suppliers are released from obligation to have approval on electricity prices *... Refering to EFET presentation from CEE SG meeting 22 June 2006

7 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 Promising Steps (Hungary)... Situation June 2006 * Situation November 2007 No Power Exchange existing or plannedNew law (entering into force beginning 2008) requires a Power Exchange established by - private undertakings and - allows foreign existing Power Exchanges to operate in Hungary In case none of these option apply MAVIR will be obliged to do so For licensing, a local representation in Hungary is needed for trading. A local branch is not enough and a fully registered company is required – leading to high cost of licenses The new law (entering into force beginning 2008) foresees a simplified way for getting a trading license, no local representation required *... Refering to EFET presentation from CEE SG meeting 22 June 2006

8 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 Further Promising Developments... Situation June 2006 * Situation November 2007 Long term cross-border capacity reservations on the Polish-Slovakian and Slovakian-Hungarian border Changed legislation in Hungary and TSO grid code in Poland (just nominations from auctioned capacities allowed) but no complete solution for all countries yet Austrian grid infrastructure limited by weak internal connections Permission for building new HV- connection has been granted, construction works starting *... Refering to EFET presentation from CEE SG meeting 22 June 2006

9 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November no progress... Situation June 2006 * Situation November 2007 Number of control areas in Austria and Germany causes more complex operations for market parties In Austria e.g. fixed in constitution, no changes on the way In Czech Republic licenses are only granted to companies with local representation (local branch is required) - administrative obstacle for foreign companies interested in the wholesale trading only Fixed in Czech Energy Act (no distinction between a wholesale trading and sales to end consumers) – no changes on the way *... Refering to EFET presentation from CEE SG meeting 22 June 2006

10 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November Steps in a questionable direction ! Envisaged cross-border fees are not supportive to market integration -Hungarian Government announced in October 2007 via the official journal, a cross border fee of 17,63 €/MWh – but just in force for 1 day (31st December 2007) -In July 2007 Slovakian Government approved new market rules which foresee a „system service charge“ for exports – in force from January 2008 The Slovakian Regulatory Authority RONI can not support the above conclusions

11 ERI Central Eastern Europe CEE Stakeholder Group Meeting, 7th November 2007 Proposed Approach To achieve a more regional and systematic approach, establish an Implementation Group dealing with market entry barriers resulting from -Administrative issues and -Market development (wholesale market liquidity, standardized products and market places) To be composed out of representatives from -Governments/Ministries -European Commission -Market Participants -Power Exchanges -Regulators