Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team.

Slides:



Advertisements
Similar presentations
Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Low Emittance RF Gun Developments for PAL-XFEL
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Y. R. Roblin Hall A beamline and accelerator status.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
LCLS Commissioning & Operations High Level Software
Steering algorithm experience at CTF3
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Magnetic Measurements For The LCLS Undulator System
Paul Scherrer Institut
LCLS Commissioning & Operations High Level Software
Revised Commissioning Strategy
LCLS Injector: Introduction D. H
Beam-Based Alignment Results
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
Overview Pre-Beam Checkouts
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
LCLS Injector Commissioning P
Control System Overview Hamid Shoaee LCLS Control System Manager
ThomX – Commissioning Meeting – 25/01/2018
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Presentation transcript:

Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team

LCLS-I 2009 Design and Typical Measured Parameters at 1.5 Å Paul Emma 2009

JJFFMMAAMMJJJJAASSDD Linac LTU/Und First Light in FEE First Light in FEH NEH JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A Linac/BC2 FEL/FEE Install Undulators M M D D LTU/Und Sys Install PEP-II ends FEE/NEH Install Project complete X-Rays in NEH D D ON Injector BC2 Install Down Down Down Injector Install Down FEH First Users Commissioning Time-Line ( ) CommissioningCommissioning Project MilestonesProject Milestones Installation PeriodsInstallation Periods CommissioningCommissioning Project MilestonesProject Milestones Installation PeriodsInstallation Periods First FEL Light First e  from gun First e  to dump 120 Hz M M Paul Emma 2009

1) Many detailed injector, linac, and FEL computer simulations during the design stage lead to a good understanding of where things can go wrong, including unforeseen instabilities, identification of tuning strategies, and detailed tolerance studies, including stability tolerances. 2) Detailed pre-beam checkout conducted from the actual controls panels and verified in the tunnel with Hall probes, clip-on ammeters, simple tape measures, etc, ensures that the hardware and software is functioning at a fundamental level prior to beam. 3) Process automation and data analysis software fully prepared ahead of time to support commissioning activities, such as RF phasing, emittance measurement, general parameter scanning and correlation plotting, machine configuration control, beam-based alignment, etc. These processes are sufficiently complex that they would not be completed accurately or promptly enough without well prepared automation software, which must be ready BEFORE the commissioning begins. 4) Beam-based feedback loops implemented as the commissioning moves downstream so that upstream systems are locked in while the downstream systems are brought on line. Paul Emma 2009

5) A 'layered' approach to commissioning whereby fundamentals are verified first (BPM scaling, linear optics, magnet operation, etc), before plunging into the more exciting phase of beam characterization. 6) A uniform plan focused on getting the machine up and running reasonably well and quickly, rather than a more academic approach where many various machine and system studies are executed sequentially, leaving the machine in an unknown and constantly changing state. 7) Detailed Physics Requirements documents written for each major system or class of components so that the hardware and software are designed to perform at the necessary level consistent with the expected performance of the full machine with minimal ambiguity. 8) Adequate budget and time to “do it right” Thanks, -PE

I would also include the technical review process. While we didn't always follow the committees' recommendations, it was still very beneficial to present our designs and plans to a fresh set of eyes. The injector and gun greatly benefited by being reviewed. Recall the laser heater chicane idea came from Todd Smith during an early injector review. And there were several good suggestions generated by the gun technical reviews. For example: z- coupling+racetrack, deformation tuning, controversy over gun probes, etc. In fact, Erik Jongewaard started as a reviewer but became so interested he volunteered to design the gun instead. So good technical reviews are high on my list. Also I would expand on your simulations and calculations point and include the integration of the RF-thermo-mechanical modeling of the gun with the desired beam dynamics. Electron beam simulations were used to define the required RF fields, which were used to produce the RF interior shapes, which were used to produce the metal surfaces, which were used to determine the cooling, ports etc. The final 3-d fields were then put back into the e-beam sims to verify everything was still good. This includes Cecile's hard work on the wakefields in the gun-to-linac region. And I'd like to mention the hard lessons we learned at GTF. Projects like LCLS need some form of test facility. Dave Dowell 2009

1. Leaving as few mysteries as possible - not leaving a system until we understand what it is doing. We've had to give up a couple of times (the model problem early in the injector), but mostly we track down what is wrong before moving on. This is related to our unwillingness to move away from design without a good physics understanding. 2. Good BPMs. It is difficult to appreciate how good the LCLS / SLAC BPMs are unless you have worked at other labs. Without the ability to understand the orbit we would be in real trouble. 3. A control system that makes it easy for physicists to develop scripts. Imagine running without phase scans, correlation plots, matching, etc, etc, etc. 4. Spending LOTS of money. It is easy to forget that LCLS is a very expensive project (especially considering that we already had the linac). We had the luxury of having very high quality equipment throughout the machine. For example, for all that we may like to malign the RF system, most the time it provides sub 100fs phase jitters. 5. (number of commissioners) X (cups of coffee) - (hours of sleep) was a very big number. --- Joe Frisch 2009

Four additions for the undulators system - Having an exceptionally well tuned undulator system with minimum phase errors inside the undulator segments and the breaks. - Canted undulator poles and horizontal stage mounting enabled undulator K values to be set within tolerance. - Having a well thought-out alignment strategy for the beamline components in the undulator line, i.e., CMM girder component alignment and high-precision remote girder positioning mechanism with simple, orthogonal controls. - A well carried-out conventional alignment program positioned the components very close to their target locations. - Heinz-Dieter Nuhn 2009

1. electron beam was good, a. laser worked well and was reliable b. cathode produced sufficient charge c. source emittance was small - good choice/design of gun d. emittance diagnostics and optics design were excellent e. dispersion matching in dog leg and bends could be precisely tuned f. high energy of electron beam helped to minimize effects of stray fields g. physicist checkout removed many obstacles h. flexibility of control system, ie. matlab and epics and scp i. plenty of time was available for commissioning the electron beam in stages 2. undulator system was good a. field quality/tuning/stability was excellent b. cam movers worked very well c. rf bpms had good resolution d. physicist checkout removed many obstacles 3. theory was good a. bba did what it was supposed to b. sase fel theory is solid, design parameters realistic c. understanding of COTR and other coherent effects was timely d. impedance were well understood e. compression/csr well understood and optimized in the design - Jim Welch 2009

Safety considerations: Commissioning of electrical systems was initially without oversight and procedure. Basically, we initiated a system of administrative lockout (by LCLS - RMB), and release when system commissioning and lockout safety planning (and documentation) was completed. (See RM Boyce) This worked so well, it was instituted in each phase of electrical commissioning from the injector to presently FEE. - Jim Turner 2009

Commissioning resources…