G020264-00-M MIT LIGO David Shoemaker LIGO PAC 27 June 02.

Slides:



Advertisements
Similar presentations
G v1 H1 Squeezer Experiment Update L-V Meeting, Caltech, March 18, 2009 ANU, AEI, MIT, CIT and LHO Ping Koy Lam, Nergis Mavalvala, David McClelland,
Advertisements

LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G W Is there a future for LIGO underground? Fred Raab, LIGO Hanford Observatory.
Laser Interferometer Gravitational-Wave Observatory Who? Presented By: Bonnie Wooley.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors David Shoemaker NSF Operations Review Hanford, 26 February 2001.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO-G W LIGO Hanford Observatory Infrastructure Frederick J. Raab, LIGO Hanford Observatory.
The LIGO Project ( Laser Interferometer Gravitational-Wave Observatory) Rick Savage – Scientist LIGO Hanford Observatory.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
R. Frey Student Visit 1 Gravitational Waves, LIGO, and UO GW Physics LIGO
LIGO- GXXXXXX-XX-X Advanced LIGO Data & Computing Material for the breakout session NSF review of the Advanced LIGO proposal Albert Lazzarini Caltech,
G M LIGO Laboratory1 Overview of Advanced LIGO David Shoemaker PAC meeting, NSF Review 5 June 2003, 11 June 2003.
Generation of squeezed states using radiation pressure effects David Ottaway – for Nergis Mavalvala Australia-Italy Workshop October 2005.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
David Shoemaker 30 August 05
June 27, 2002 EK 1 Data Analysis Overview Erik Katsavounidis LIGO-MIT PAC12 – June 27, 2002 LIGO-G Z.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
LSC Meeting, Livingston Observatory, 3/18/03 Proposal for Trinity University Participation in the LSC Dennis Ugolini, Trinity University Wednesday Plenary.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
LIGO Overview & Background Jay Marx Advanced LIGO PAP Meeting November 30, 2006 G A.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
LIGO-G Z LIGO Scientific Collaboration1 Welcome to the L-V Meeting Status of the LSC Dave Reitze University of Florida.
LIGO-G M LIGO Overview and Status Stan Whitcomb NSF Annual Review 9 November 2005 Caltech.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
LIGO Z LIGO Scientific Collaboration -- UWM 1 LSC Data Analysis Alan G. Wiseman (LSC Software Coordinator) LIGO Scientific Collaboration.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
LIGO-G M Management and Operation Plans/Budget Stan Whitcomb NSF Annual Review 8 November 2004 Caltech.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
LIGO- G D Proposal to the NSF: Low Noise Suspensions and Readout Systems for Future LIGO Interferometers Stan Whitcomb LIGO Program Advisory Committee.
CARRUTHERS LSC 3/20/06 1 LIGO-G M The View from NSF Tom Carruthers LIGO Program Officer National Science Foundation (703)
LIGO-G R Quantum Noise in Gravitational Wave Interferometers Nergis Mavalvala PAC 12, MIT June 2002 Present status and future plans.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO-G Z LIGO at the start of continuous observation Prospects and Challenges Albert Lazzarini LIGO Scientific Collaboration Presentation at NSF.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
February 26, 2001LIGO-G B-P1 LIGO Future Operations (FY ) Budgets, Schedules, and Milestones NSF Review February 26, 2000 Hanford, Washington.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
12 December 2003LIGO-G Z1 Report to PAC on LSC Issues Peter R. Saulson Syracuse University LSC Spokesperson.
G R LIGO Laboratory1 The Future - How to make a next generation LIGO David Shoemaker, MIT AAAS Annual Meeting 17 February 2003.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
LSC Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Software Coordinator Report Alan Wiseman LIGO-G Z.
LSC Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 LSC Software and Other Things Alan Wiseman University of Wisconsin.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G Z The LIGO Scientific Collaboration Peter R. Saulson NSB Site Visit LIGO Livingston Observatory 4 February 2004.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO-G E PAC9 Meeting LIGO Laboratory at Caltech 1 The LIGO I Science Run Data & Computing Group Operations Plan 9 th Meeting of the.
G R Interferometer Sensing & Control P Fritschel 8 Oct 02.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
LIGO-G Z LIGO Scientific Collaboration1 Welcome to the Hannover L-V Meeting Status of the LSC Dave Reitze University of Florida.
LIGO G M Intro to LIGO Seismic Isolation Pre-bid meeting Gary Sanders LIGO/Caltech Stanford, April 29, 2003.
LIGO PAC11, Nov 2001 Syracuse proposal to NSF LIGO-G Z 1 Proposal to NSF: “Research in Gravitational Wave Detection with LIGO” Peter R.
LIGO-G M Press Conference Scientific Operation of LIGO Gary H Sanders Caltech (on behalf of a large team) APS April Meeting Philadelphia 6-April-03.
LIGO-G D Advanced LIGO Systems & Interferometer Sensing & Control (ISC) Peter Fritschel, LIGO MIT PAC 12 Meeting, 27 June 2002.
Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
Gravitational Wave Data Analysis  GW detectors  Signal processing: preparation  Noise spectral density  Matched filtering  Probability and statistics.
NSF/ LIGO Review Rainer Weiss Cambridge, Mass October 23, 2002
LIGO at a Distance Dale Ingram on behalf of the LIGO Laboratory Public Outreach Team LIGO Hanford Observatory, Richland, WA
Thermal Compensation NSF
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
Is there a future for LIGO underground?
Nergis Mavalvala (age 47)
Quantum Noise in Gravitational Wave Interferometers
Status of LIGO Installation and Commissioning
Stan Whitcomb LSC meeting Livingston 21 March 2005
David Shoemaker AAAS Conference 17 February 2003
The Laser Interferometer Gravitational-wave Observatory
Detection of Gravitational Waves with Interferometers
P Fritschel LSC Meeting LLO, 22 March 2005
Preliminary Project Execution Plan
Presentation transcript:

G M MIT LIGO David Shoemaker LIGO PAC 27 June 02

G M 2 Support of initial LIGO commissioning l Activity »MIT Lab’s first priority »MIT staff led several initial LIGO subsystems from concept to hardware: Beam Tube, Vacuum Equipment, Systems Integration, Interferometer Sensing/Control, Physics Environmental Monitor »Now concentrating on shaking down system »Activities/staff at both MIT (hardware, e.g., new suspension sensors; analysis/remote commissioning) and at Observatories l Individuals: »Rainer Weiss – leading Livingston Commissioning, 2/3 at site »Peter Fritschel – Organizing commissioning at both observatories »Nergis Mavalvala – Controls, Systems, everything else »Mike Zucker – leading effort to improve electronics infrastructure »Dave Ottaway – continued contribution on Laer, Input Optics, etc. »Rana Adhikari – Grad, Full time at Livingston; noise modeling

G M 3 Data analysis for initial LIGO l Activity »Recent faculty addition has made it ‘happen’ »Wide group interest in interface between instrument and data »Search for ‘Un-modeled bursts’ and environmental effects l Individuals: »Erik Katsavounidis – Faculty (new students!), leading analysis in MIT group »Julien Sylvestre, Stefan Ballmer – Grads, developing time-frequency- power analysis, tools for trigger evaluation »Keith Bayer – programmer/sysadmin »Tania Regimbau, Laura Cadonati – Postdocs, astrophysics of stochastic backgounds, trigger evaluation »Fritschel, Zucker, Shoemaker, Harry, Ottaway -- leaders/participants in ‘upper limit’ initial analysis efforts

G M 4 Development of future detectors l Activities: Advanced LIGO »Systems engineering/trades (from initial LIGO) »Sensing/Control expertise (from initial LIGO) »LASTI (Full-scale mechanical tests of Suspensions/Isolation, Input Optics/Laser) l Activities: beyond Advanced LIGO »New group around Nergis Mavalvala, likely new NSF grant l Individuals: »Peter Fritschel – Leading System trades, Sensing/control subsystem »Mike Zucker – Sensing/Control; thermal compensation; LASTI leader »Nergis Mavalvala – Faculty (new students!), Sensing/Control, QND schemes »David Shoemaker – LSC suspensions/isolation working group leader »Ken Mason – Mech Eng for LASTI, Preisolator »Rich Mittleman – Controls, LASTI »Gregg Harry – Thermal Noise, LASTI »Dave Ottaway – Optics/lasers »Ryan Lawrence – Grad, Thermal compensation »Jamie Rollins,Joe Betzwieser– Grads, LASTI »Keisuke Goda – Grad, Sensing/control/QND

G M 5 Community Activity »LIGO Scientific Collaboration »LIGO Advanced System Test Interferometer: Focus for many community instrument development activities Individuals »Weiss: LSC Spokesperson »Shoemaker: Leader of LSC Suspensions/Isolation Working Group »Zucker: LASTI leader

G M 6 MIT LIGO Lab l Origin: the MIT Gravitation and Cosmology Lab »CMB ballooning, COBE earlier activities »Precursor of the US GW Observatory effort »Presently totally supported by and focussed on LIGO »May grow in scope through NSF and NASA grants to new faculty »Part of MIT’s Center for Space Research – connection with source modeling, astrophysics, technical support

G M 7 Relationship to rest of LIGO Lab l One of the 4 sites (Caltech, Hanford, Livingston, MIT) l Capitalizes on centralized administration at Caltech (like Observatories) l Subcontract to MIT group, thus much purchasing, financial tracking, etc. local to MIT (unlike Observatories) l Integrated into the management, planning, scientific and technical activities l Fully participant in the commissioning at the observatories l And the data analysis!

G M 8 MIT Staffing summary 3.5 Scientist/faculty FTEs (goal: 6) 5 Postdoc/term FTEs (goal: 3) 7 Graduate students 3.5 Engineers, Technical Specialist, Sysadmin 1 Administrator Presently 20 FTEs total, 22 individuals (+2-3 Ugrads) »6 Ugrads this summer!

G M 9 Staff (Budgeted) by Location

G M 10 Proposed by Year and Site

G M 11 MIT 2002 Budget by Category Business office Data Analysis/ Computing Observatory on-site Support Scientific and Technical Base Advanced R&D Project Office

G M 12 Evolution Baseline LIGO Lab plan is for constant group size Significant activities in instrument development based on geographically distributed groups, not added staff »Suspensions/LASTI – Caltech/UK-led »Isolation/LASTI – LLO/LSU led »Adv LIGO Systems, Sensing/Control – MIT led Data analysis: added strength from NSF etc. grants QND etc.: establishment of group through NSF etc. grants Probable ‘swing of the pendulum’ away from Suspensions etc, toward 3 rd generation readout, sensing, and control schemes

G M 13 Physical Infrastructure Offices in NW17, NW22 »Not really worth a visit l Lab in NW17 »4,000 sq ft high bay, pair of bridge cranes »8,000 sq ft laser, vibration, vacuum prep labs; machine shop; electronics shop »Huge vacuum system »Beowulf-type computing cluster 32  64 nodes »…all equipped with HEPA overpressured air, ethernet, etc. »Worth a visit!