8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright 2004 - All rights reserved Material Movement The movement of material through the.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

Production Systems Design Types of Production Systems.
By Anastasia Lidya Maukar
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
8–1. 8–2 Chapter Eight Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
INDR 343 Problem Session
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Lecture 11 Queueing Models. 2 Queueing System  Queueing System:  A system in which items (or customers) arrive at a station, wait in a line (or queue),
Lantech Case Study Presented by: Ray Essig Natalie Lavergne Karine Lavoie-Tremblay.
Queuing. Elements of Waiting Lines  Population –Source of customers Infinite or finite.
Facility Planning & Design Prepared by: Brannon McGrotha.
Process Selection and Facility Layout
© C.Hicks, University of Newcastle IGLS04/1 Determining optimum Genetic Algorithm parameters for designing manufacturing facilities in the capital goods.
Engineering Manufacturing Facilities
1 Chapter 7 Dynamic Job Shops Advantages/Disadvantages Planning, Control and Scheduling Open Queuing Network Model.
Process Selection and Facility Layout
8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright All rights reserved Models for the Production System.
Chapter 4 Office Layout.
Queuing Networks. Input source Queue Service mechanism arriving customers exiting customers Structure of Single Queuing Systems Note: 1.Customers need.
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
1 Chapter 5 Flow Lines Types Issues in Design and Operation Models of Asynchronous Lines –Infinite or Finite Buffers Models of Synchronous (Indexing) Lines.
Chapter 4 Process Design.
Introduction to Operations Research
Chapter 13 Area Allocation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand the concept.
Manijeh Keshtgary. Queuing Network: model in which jobs departing from one queue arrive at another queue (or possibly the same queue)  Open and Closed.
Ch 6 Tech Notes OBJECTIVES
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Process Layout Chapter 7 July 20, 2005.
Computer Aided Layout Manual
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
IE450 Models Relating Cycle-time, Throughput, WIP and Batch Sizes
Introduction to Uncertainty Simulation of Operations.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright All rights reserved Review Models and Analysis of Manufacturing Systems.
Problem #7 To support National Heart Week, the Heart Association plans to install a free blood pressure testing booth in El Con Mall for the week. Previous.
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
Facility Layout Part b.
Week 21 Statistical Model A statistical model for some data is a set of distributions, one of which corresponds to the true unknown distribution that produced.
Manufacturing And Service processes
Managerial Decision Making Chapter 13 Queuing Models.
Facility Layout McGraw-Hill/Irwin.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Layouts Cellular Production Group Technology
Models of Traffic Flow 1.
Queuing Theory Jackson Networks
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
MTH 463 Enthusiastic Studysnaptutorial.com
WGEP – Case Study Western Geophysical Exploration Products (WGEP) was barely seen by the customers, once they had a lot of problems, like marginal product.
Solutions Queueing Theory 1
Raw Materials and Resources
IV-2 Manufacturing Systems modeling
بسم الله الرحمن الرحيم غرفة صناعة عمان معهد إيجابي
Machine Requirements 8/24/04 Paul A. Jensen
Unit Time 8/24/04 Paul A. Jensen
Modeling Scheduling Problems
In-Class Exercise: The Exponential Distribution
Variability 8/24/04 Paul A. Jensen
Chapter 6A Facility Layout 2.
Facilities Planning and Design Course code:
Topic IV. Single Channel Systems (Limited queue length system)
Lecture 14 – Queuing Networks
Queueing Theory 2008.
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright All rights reserved Material Movement The movement of material through the production facility is a waste because material movement does not add value to the product.

2 The amount of movement depends on: the set of products manufactured, the sequence of operations (process) identified for each product, the assignment of machines to the operations of the processes, and the layout of the machines in the manufacturing facility. Here we assume that the first two are fixed and we concentrate on the latter two.

3 The several generic types of layout

4 Example Orders for products arrive as Poisson processes. Processing begins when an order arrives. Operations are performed in a numerical sequence. There are no losses in the operations.

5 Machine information Each operation requires a unique machine. All machines operate 40 hours per week. Assume operation times have an exponential probability distribution. Provide enough machines so that all workstations are to have no more than 80% utilization.

6 Space and Economic Information WIP requires 0.4 sq. m. floor space per unit. Provide sufficient space at each station to accommodate WIP 90% of the time. Transportation cost is $0.10/unit-meter Use a plant with length twice as great as width. The cost of the plant is $20 per week per square meter.

7 Design a plant that uses a job shop (or functional) layout

8 Step 1: Queuing Analysis Do a Queuing Analysis for each machine type

9 Queuing Analysis

10 Step 2: Space Analysis Find the space requirements of each machine type. Find the space required for WIP.

11 Space analysis

12 Step 3: Flow Analysis Construct the from-to chart for weekly flows

13 Step 4: Construct a Layout Use a plant dimension of 12x24 with area 288 sq. m.

14 Step 5: Economic Analysis Plant cost: Machine cost: Transportation Cost Cost of WIP Total Cost: How will these costs change with larger lot sizes?

15 Design a plant that uses a flow shop layout We assume that each product visits each station but receives no processing at some stations. What do you think changes with respect to the functional layout?

16 Queuing and space analyses Queuing analysis Space analysis

17 Flow Analysis Construct the from-to chart for weekly flows

18 Economic analysis Plant cost: Machine cost: Cost of WIP at machines: Cost of WIP in material movement: Total Cost:

19 Design a plant that uses a separate line for each product Let moulding and final inspection be separate departments What will be different in this type of layout?

20 Queuing and space analyses for each product

21 Economic Analysis Plant cost: Cost of WIP at machines: Cost of WIP in material movement: Total Cost: How does this cost relate to the cost of a functional layout?

22 Design a plant that uses group technology Let moulding and final inspection be separate departments

23 Grouped operations and families of products

24 Queuing and space analysis for each family

25 Flow Analysis

26 Economic Analysis Plant cost: Cost of WIP at machines: Cost of WIP in material movement: Total Cost: