Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.

Slides:



Advertisements
Similar presentations
Advantages of the CO 2 refrigeration As a refrigerant CO 2 has excellent thermodynamic properties, in terms of good heat-transfer inside an evaporator.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
1 Nikhef Activities on CO 2 Cooling Bart Verlaat, Nikhef Introduction meeting with FOM director W. van Saarloos 1 Picture: LHCb-VELO evaporator.
Novel technologies and materials for thermal management
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Bart Verlaat 2 nd October 2013 Development of a portable CO 2 cooling system for CO 2 R&D in HEP.
CO 2 Development of the Velo Thermal Control System (VTCS)
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
UT cooling discussion 3 december 2014
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
TRACI Status Meeting Overview of the TRACI 100-W CO 2 cooling machine Bart Verlaat 22 September
60kW Thermosiphon control system
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
EP-DT roadmap towards CO 2 cooling of "phase-2" detectors Paolo Petagna (CERN PH-DT)
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
A.P.Colijn1 Nikhef Nikhef – History CO Nikhef - Who is Who CO Nikhef - Work in Progress CO Nikhef - Plans.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
IBBelle: Status & Plans
ATLAS ITk Baby-DEMO update
Forum on Tracking Detector Mechanics - Bonn, May 2016
Pixel upgrade CO2 cooling plants – 3D modelling
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
CO2 cooling requirements for the IBL
CO2 Cooling IPNL Nick Lumb, 28/01/09.
CO 2 CO2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN Bart Verlaat
The Baby-DEMO small scale low temperature CO2
Presentation transcript:

Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1

CO 2 cooling: the current status The last year lots of progress in CO 2 cooling development is achieved. –2 new systems for detector operation have been developed: IBL cooling system -35°C) => In operation CMS pixel CO2 cooling system (15 -30°C) => under commissioning –Many laboratory test units have been build: 2x Traci V1, 3x Traci V2, 4x Traci V3 up to 400W Marco 1kW CMS-TIF prototype plant 15 kW –New development lessons learned: Operation at cold temperatures < -30°C Scaling from 1kW (LHCb-Velo) to 3kW (IBL) and 15 kW (CMS) –Scaling did not give surprises. Positive experience with vacuum shielded concentric lines. Standard approach for control. Redundancy policy From the current experience and the availability of standard components a scaling towards 40kW 2PACL units should be feasible 2

Atlas IBL CO 2 cooling system 2-Phase Accumulator Controlled Loop (2PACL) -35’C cooling 20’C cooling Accumulator pressure lowering for cool down Pressure increase for liquefying prior to start-up Sub cooled pumped liquid Saturation temperature Sub cooled liquid margin for pump operation (>10 ‘C) Liquid cooling 2-phase cooling

Atlas IBL cooling system CO 2 cooling plant layout

Cooling plants in USA-15 5

Transfer line CO 2 cooling hardware in UX Junction box Vacuum system Flex linesManifold box

CMS Pixel Cooling System 2x -30 ⁰ C 7

CMS Pixel Cooling System 8 2 Plants with accu’s Plant interior Transfer lines

Cooling systems for the ITK The ITK tracker has a total power of 180 kW (TBUpdated) The largest CO2 2PACL plant build for CMS is 15kW When looking to the “standard” components (Pumps, heat exchanger, valves etc.) a system scaling up to 40kW seems possible. The current approach to the ITK cooling is a modular approach of several stand alone operating systems. Redundancy is obtained by swapping a failing plant for a spare plant Segmentation to be decided based on best segmentation logic in the detector –10x 20kW or 5x 40 kW?? Roughly 2 possibilities for segmentation –Cool per sector (Take a pie of the combined detector (End-cap + barrel, but split strip and pixel) –Cool per sub detector Is preferred as it makes it possible to operate each sub detector at different temperatures, eg a colder pixel detector. 9

Cooling segmentation 10 19/55 31/55 12/21 5/11 7/20 2/3 Pixel, short strop barrel, long strip barrel, end cap, services, thermal enclosure x/y => x: power at begin without safety factor. y: Power after irradiation with safety factor Detector segmentation or pie segmentation PP2 segmentation 2x5 locations PP2 is the most likely space for the junction box and manifold

ITK cooling history In the past the large upgrade cooling plant is discussed several times. Below an overview of some relevant talks given in upgrade meetings with links. –Thermal management working group meeting - phase II system design 30 September CERN Topics: alternative concept solutions –Atlas Upgrade week April Oxford CO2 cooling activities at CERN –Atlas Upgrade week November CERN Cooling plant segmentation Cavern fit check –Atlas Upgrade week March SLAC Topics: Cooling pipe sizing Component availability –ECFA High Luminosity LHC Experiments Workshop, 2 Aix Les Bains Topics: Future look on common cooling plant development –ITK kick-off 23 January CERN Topics: Wrap up of status –ITK Cooling kick-off 11 December Cracow Topics: Kick-off of the cooling group Due to IBL – CO2 cooling development, the discussion of the Atlas upgrade system was stalled for a while, however most presented topics in the past are still relevant. 11

Modular 2PACL approach A modular approach of multiple 2PACL stations is a novelty. A 2PACL needs a dedicated filling to operate. –Linking systems together mixes up the fluid quantity –CMS has 2 systems connected together Complex recovery procedures to equalize the fluid quantity before separation –Atlas IBL has 2 plants, but 1 accumulator volume Easy approach in mixing and separation But accumulator cannot be taken out of service –Best approach would be to separate the accu volume from the actuators and sensors which need maintenance Possible concept for a modular 2PACL approach –Have the accu volume be always part of the transfer system –Separate accu cooling, heating and sensing by housing them in a separate siphon –The modular plant contains all hardware and its volume is small Not much fluid mixing during a swap, therefore no complex equalization procedure needed. –1 spare plant is always running over a manifold connecting all units. –When a unit fails the spare can take over 1 system –The out of service unit can be repaired or swapped with another plant –Redundancy of a common primary cooling system 12

Cooling plant concept for a modular 2PACL 13 Modular plant unit with the following features: 1.Local by pass for dP control 2.2 condensers connected to 2 primary cooling systems. 3.Remote head triple Lewa pump 4.Contain most sensors and actuators 5.Swappable for another unit Accu unit with the following features: 1.Heaters and sensors in a parallel siphons (1 for redundant hardware) 2.Thermosiphon condensers each connected to a dedicate primary cooling system 3.Able to access all active components in a separated volume PP2 manifold with heated by-pass Transfer line

Modular 2PACL concept 14 Plant 1 Plant 2 Plant 3 Spare plant (Without Accu) Runs cold over the spare manifold for direct kick-in Spare plant manifold USA-15 To UX15

Direct swapping in case of an event 15 Plant 1 Plant 2 Plant 3 Spare plant Replaces failed or serviced unit Spare plant manifold USA-15 To UX15 Accu as volume stays active (Belongs to the transfer line volume) Accu has its own redundancy for heating and cooling Failed plant can be taken out of service or repaired

Quantity of cooling units Given the fact that we have 2x5 PP2 manifold locations: –2x (5 systems +1 spare) = 12 active units (option 1) –2 spares ready for direct replacement –A total of 14 units are needed Quantity optimization –Less units possible if segmentation is not following the 5 PP2 locations –Less units possible if A and C side PP2 manifold are connected to the same system Option 2: 6 active + 2 passive plants With a 150 kW Tracker the subunits will need cooling power in the order of: –Option 1: 15 kW –Option 2: 30 kW –Both options are okay with respect to the availability of technology (CMS = 15kW) 2 primary cooling plants are needed to cool all units (1 redundant) –This could be the current surface unit with a liquid brine bridging the surface and the cavern –A local chiller is an option too, but might have space constraints 16

Conclusions A modular approach with x 2PACL stations is the baseline concept The concept seem feasible when a separation of the accu and plant is foreseen 1 running spare unit via a back-up manifold for immediate kick-in. Concept needs prototyping 17