MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.

Slides:



Advertisements
Similar presentations
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Advertisements

Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
3-1 Utility Conflict Identification and Management Lesson 3.
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Capital Project Process
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Conventional Facilities Jan Molander Design Manager Conventional Facilities December 10, 2013.
Director ’ s Review of the Project X Cost Range Estimate: Conventional Facilities Project X Director’s Review March 16, 2009.
WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Conventional Facilities and Siting Global Group (ARCFS)
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Current Site Status at IP Preliminary survey of campus
JLEIC Collaboration meeting highlights
ILC GLOBAL SYSTEMS MEETING
CLIC Civil Engineering Update
Introduction to Jefferson Lab
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
MEIC Cost Estimate Overview
Conventional Facilities (WBS 1
Extraction Michael Bevins May 17, 2007
Department Of Energy Review Linac Coherent Light Source Project
Update on the JLEIC pCDR
JLEIC Engineering Status
JLEIC Accelerator R&D Meeting
Presentation transcript:

MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015

22 December 2014 Page 2 2 October 2015 Page 2 Site Development Progress NSAC Cost Review in January 2015 –Scope of the MEIC Conventional Facilities Site Layout Structures – similar to CEBAF –Work breakdown schedule (WBS) –Bottoms up cost estimate Engineering Services Contract – Indefinite Delivery Indefinite Quantity (IDIQ) –Site Characterization & Early Project Development –Commonwealth of Virginia funds –Procurement process –Initial task orders

33 December 2014 Page 3 3 October 2015 Page 3 MEIC Site Layout

44 December 2014 Page 4 4 October 2015 Page 4 MEIC – Conventional Facilities (CF) Scope Similar to Existing CEBAF (continuous electron beam accelerator facility) Types of Structures: Underground tunnel – houses electron and ion beam lines Detector hall – interaction regions, houses experimental equipment. –Truck ramp access Counting house – supports the detector halls. Service building – houses accelerator equipment such as RF. No personnel or equipment access to the tunnels. Access building - provides personnel and equipment access to the tunnel and houses low conductivity water (LCW) plants. Egress building – personnel access to tunnel to meet life safety egress requirements for the tunnels. Cryogenics plant building – Cryogenics plant is not part of the CF scope Sitework & Utilities to support the MEIC operations Power Water – domestic and process –Low Conductivity Water for cooling scientific equipment Cryogenics distribution Sanitary Stormwater Communications Roads, Parking & Sidewalks

55 December 2014 Page 5 5 October 2015 Page 5 MEIC Site Plan with Building Labels cs1 cs2 cs3 cs4 cs5 cs6 cs7 cs8 cs9 cs10 cs11 et1 cs14 cs15 cs17 cs18 cs19 cs20 cs21 cs22 cs23 cs24 cs13 cs12 cs16 et2 et3 et4 et5 15

66 December 2014 Page 6 6 October 2015 Page 6 Structure Dimensions & Power Requirements WBSDescription Length/ SF Area No. of Bldgs Label on Site Plan Power, kVA Comments Underground Structures Collider Tunnel2,154 m40,250width & height varies Detector Halls8,000 SF21, Ion & Booster Tunnel560 m2,550width & height varies Electron Transfer Tunnel270 m 2.5 m high x 2.5 m wide HE Cooler – ERL Tunnel70 m1,9004 m high x 35 m wide Aboveground Structures Collider Service Buildings33,325 SF27 11, 12, 13, cs1 thru cs Collider Access & Egress Buildings* 12,000 SF24, Counting House (CH)3,600 SF13Equal to Hall D CH Ion Buildings*3,150 SF26, Electron Transfer Buildings*2,250 SF5et 1 thru et HE Cooler – ERL Buildings2,000 SF Booster Service Buildings*2,400 SF38, 9, Cryo Plant Building9,900 SF1143,800Similar to CHL II * Site Plan does not include egress buildings for life safety code. Costs for these egress buildings are included.

77 December 2014 Page 7 7 October 2015 Page 7 CF Cost Estimating Methodology Bottoms up estimate based on assemblies –For example, the roof slab unit cost includes the formwork with scaffolding to support, reinforcing steel, and the concrete in the unit cost –Unit cost includes material, labor, and equipment costs Developed assemblies level templates for the different types of structures based on existing Jefferson Lab structures –Underground tunnel section similar CEBAF tunnel –Detector hall similar to Halls B & D –Service building similar to CEBAF Extractor/Spreader Service Bldg, #68 –Access building similar to CEBAF North Access Building, #67 –Egress building similar to CEBAF Exit Stair, #4 –Cryogenics Plant similar to 12GeV CHL II Tops down check on the template –Used existing Jefferson Lab structure quantities –Reviewed the total costs against the 100% design estimate (escalated to 2014 dollars)

88 December 2014 Page 8 8 October 2015 Page 8 Conventional Facilities, 2014 $K Direct WBSDescription2014 $K 1.4Conventional Facilities201, Design17, Construction178, Sitework & Utility Distribution27, Underground Structures Collider Tunnel47, Detector Halls18, Ion & Booster Tunnel11, Electron Transfer Tunnel4, HE Cooler – ERL Tunnel7, Aboveground Structures Collider Service Buildings7, Collider Access & Egress Buildings38, Counting House1, Ion Buildings2, Electron Transfer Buildings1, HE Cooler – ERL Buildings2, Booster Service Buildings3, Cryo Plant Building3, Commissioning Management4,000

99 December 2014 Page 9 9 October 2015 Page 9 MEIC IDIQ Engineering Services Site Condition Surveys: Topographic land surveys Property surveys Geotechnical investigation - soil borings Groundwater studies Environmental Services: Environmental site assessments Wetland delineation Preparation of NEPA documents Ecological surveys Stormwater management plan Site Development: Site plan with roads, parking, and structures Utility services & distribution Traffic Study Alternative analysis Feasibility Studies Project Planning: Budgetary cost estimate Preliminary risk assessment Schedule development Pre-conceptual design report Design requirements document All potential needs up to the start of design

10 December 2014 Page October 2015 Page 10 MEIC IDIQ Contract – Procurement Process Award – Atkins North America –Offices located throughout the US –Office in Newport News & working relationship with the City –Consultants with previous experience at JLab Phase I – Qualifications –Experience; Staff Qualifications; Approach; Geographic Location –Three (3) offerors selected Phase II – Best Value –Request for Proposal (RFP) sent only to Phase I selected offerors –Capability: more important than price Phase I proposals Timeline of project development to assess their understanding of sequencing & interdependencies Past performance –Price: Labor rate schedule and effort associated with Task Order 1

11 December 2014 Page October 2015 Page 11 MEIC IDIQ – Task Order #1 Kick-off Meeting held October 1, 2015 Included tour of accelerator tunnel, linac service building & the LCW plant Scope: Topographic land survey ~ 100 acres –Includes the adjacent properties Geotechnical investigation –About 50 borings at 75’ depth –Locate the Yorktown Formation Phase I environmental site assessment –First step for property transfer & NEPA Develop the site plan –Engineering drawings with roads & utilities Preliminary risk assessment Budgetary cost estimate –Validate JLab estimate

12 December 2014 Page October 2015 Page 12 MEIC IDIQ – Task Order #2 Feasibility Study Tunnel construction – bore deep versus cut & cover Developing the scope of the study – initial look at a high level –Geological –Cost increases Initial discussions –Tunneling consultant: Lachel & Associates –Considerations Tunnel diameter Radius of the boring machine –Increase depth of a few soil borings to 200’ CEBAF – Cut & Cover SSC – Bore

13 December 2014 Page October 2015 Page 13 Questions?

14 December 2014 Page October 2015 Page 14 Backup / Alternate Slides

15 December 2014 Page October 2015 Page 15 MEIC – Conventional Facilities WBS WBSDescription 1.4.1Design 1.4.2Construction Sitework & Utility Distribution Underground Structures Collider Tunnel Detector Halls Ion & Booster Tunnel Electron Transfer Tunnel HE Cooler – ERL Tunnel Aboveground Structures Collider Service Buildings Collider Access & Egress Buildings Counting House Ion Buildings Electron Transfer Buildings HE Cooler – ERL Buildings Booster Service Buildings Cryo Plant Buildings 1.4.3Commissioning 1.4.4Management

16 December 2014 Page October 2015 Page 16 List of Aboveground Buildings

17 December 2014 Page October 2015 Page 17 List of Underground Tunnel Segments

18 December 2014 Page October 2015 Page 18 WBSDescription Level $K Level $K Level $K Comments Sitework27, Site Preparation3,617 Includes demolition of Residence Facility and Relocation of Hall D Service Building Stormwater Management3,025 Includes 2 new retention ponds and rework of an existing pond Utilities19, Water Distribution2,202 12” main around the site with 8” sub-loop distribution Sanitary Sewer944Includes 5 lift stations Electrical Distribution15,347 Based on two primary substations & 6 primary loops Communications Distribution Roads and Pavement1,594 WBS – Sitework & Utility Distribution

19 December 2014 Page October 2015 Page 19 Conventional Facilities – Cost per SF WBSDescription Net SF Area Costs 2014 $K Cost per SF Comments Underground Structures Collider Tunnel107,40647,354441height varies 8.5 to 11 feet Detector Halls16,00018,4021, Ion & Booster Tunnel24,69111,859480height varies 8 to 11 feet Electron Transfer Tunnel7,2654, feet high HE Cooler – ERL Tunnel26,3717, feet high Aboveground Structures Collider Service Buildings33,3257, Collider Access Buildings12,00031,5982,633Includes LCW plants Collider Egress Buildings7,2006, Counting House (CH)3,6001,386385Equal to Hall D CH Ion Buildings3,9502, Electron Transfer Buildings3,4501, HE Cooler – ERL Buildings2,0002,4411,221Includes LCW plant Booster Service Buildings4,0003, Cryo Plant Building9,9003,780382Similar to CHL II

20 December 2014 Page October 2015 Page 20 CF Unit Costs Unit costs using past project data and MEANS estimating manuals Past project data was escalated to 2014 dollars: –CEBAF & End Stations, 1988 –East Retention Pond, 2007 –12 GeV Hall D, 2007 –12 GeV CHL II, 2007 –12 GeV Linac Power Upgrades, 2010 –Retention Pond #2, 2012 Escalation Factor Used, average –Engineering News Record –Means Historical Cost Index –Bureau of Labor Statistics Producers Price Index for construction

21 December 2014 Page October 2015 Page 21 CF Unit Cost Data - Example Unit cost used in the cost estimate is the median of the unit cost data for each assembly. The shaded areas under the unit cost data indicates no data available from that source. unit costs from the 100% design estimate unit cost escalated to 2014$ Means 2014$ Unit Cost Data Cost Estimate