1 Colorado BART APCD. 2 Class 1 Areas National Parks and Wilderness Areas 12 in Colorado 4 National Parks 8 Wilderness Areas.

Slides:



Advertisements
Similar presentations
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Advertisements

RH Requirement for BART  §308 (e) contains BART requirements for regional haze visibility impairment…. The State must submit an implementation plan containing.
Regional Haze Update & Current Results Michele Notarianni Brenda Johnson EPA Region 4.
Particulate Matter Seminar John Kush Texas Genco Rice University Shell Center for Sustainability November 9, 2004.
WRAP Stationary Source (SS) NOx and PM Report Lee Alter Western Governors’ Association WRAP IOC NOx Issues Meeting Denver, CO July 28, 2003.
Identification of BART-Eligible Sources in the WRAP Region A Summary of the April 4, 2005 Draft Report.
The BART Process by Kathy Kaufman and Joe Kordzi September 1, 2005 EPA Region 6.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Air Pollution Grab Bag. Middletown Coke Produce coke from coal which will be used by AK Steel to produce iron Facility will have 100 ovens and produce.
Centralia Power Plant BART-Like Control Technology Analysis Alan Newman, PE Washington State Department of Ecology.
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
Pennsylvania Draft Regulations for the Control of Mercury From Coal-fired Electric Generating Units Allegheny Section- AWMA Air Quality Issues Workshop.
Dispatches from the Front: The Colorado Clean Air-Clean Jobs Act Platts 5 th Annual Rockies Gas and Oil Conference Ron Binz Public Policy Consulting April.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
U. S. Air Quality Program Update Working Group on Strategies and Review April 14, 2010.
Analysis of Existing and Potential Regulatory Requirements and Emission Control Options for the Silver Lake Power Plant APPA Engineering & Operations Technical.
1 EPA’s Proposed Interstate Air Quality Rule Consideration of Issues Associated with Possible Expansion of IAQR to the West Patrick Cummins, WGA Background.
The Western Regional Air Partnership (WRAP) WRAP formed in 1997 as the successor organization to Grand Canyon Visibility Transport Commission (GCVTC) –
Final Amendments to the Regional Haze Rule: BART Rule Making June 16, 2005.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Regional Haze Rule Best Available Retrofit Technology Government to Government Consultation Navajo Nation Environmental Protection Agency.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
An Update on the Colorado Regional Haze SIP Process and Outcomes Presented at: WRAP – Implementation Work Group San Francisco, CA March 2005.
1 BART in California WRAP Stationary Sources Joint Forum November 15-16, 2006 Tempe, Arizona Air Resources Board California Environmental Protection Agency.
Fuels For Schools General Air Quality Considerations Diane R. Lorenzen, P.E. Montana Department of Environmental Quality October 17, 2007.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
BART Guideline Overview WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
REGIONAL HAZE BART – Key Issues For Consideration Eric Massey, Arizona DEQ Lee Alter, WGA SSJF Meeting June 3, 2004 Denver, Colorado.
NACAA Fall Meeting October 2012 Innovative and Replicable Initiatives - The Colorado Clean Air/Clean Jobs Act Will Allison, Director CDPHE Air Pollution.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
Preliminary Evaluation of Data for Reasonable Progress Montana RH FIP Laurel Dygowski, EPA Region 8 IWG Meeting – April 2007.
Earth’s Changing Environment Lecture 4 Improving Air Quality.
Proposed Reasonable Progress Rule Workshop Brief Background and Procedure Public Workshop June 14, 2007.
Massachusetts Multi-pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection EPA Utility MACT Working Group.
WESTAR 2003 Fall Technical Conference on PSD Increment Tracking & Cumulative Effects Modeling Seattle, Washington Conducting Class I Area Increment Analyses.
Regional Modeling for Stationary Source Control Strategy Evaluation WESTAR Conference on BART Guidelines and Trading September 1, 2005 Tom Moore -
ICI Boilers EPA Meeting November 21, Why control ICI boilers? Important source of SO 2 and NO x emissions Cost-effective emission reductions achievable.
Status of BART Analyses Implementation Workgroup Meeting April 17, 2007.
Navajo Nation Interest’s In EPA Rulemakings Affecting EGU’s National Tribal Forum May 22-24, 2012 Tulsa, Oklahoma Anoop Sukumaran, Navajo Nation Environmental.
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
BART SIP Development: Example from Colorado Rocky Mountain National Park WRAP IWG Meeting, Denver, CO August 29, 2007 Presented by: Ray Mohr and Curt Taipale.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
Reproposal of the Regional Haze Rule and BART Guidelines.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Summary of June 15, 2005 Revisions to RH BART and BART Guidelines.
Emission Trends and SIP Scenarios for SO2 and NOx Patrick Cummins WRAP Meeting December 14, 2005.
BART Status of Other States AK, Bernalillo County, HI ND, SD, OR, WA.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
WESTAR 2003 Fall Technical Conference Introduction to Class I Area Impact Analyses September 16, 2003 John Bunyak National Park Service.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Summary of WRAP Stationary Source (SS) NOx and PM Report Lee Alter Western Governors’ Association WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 DE Air Regulation Development Large Industrial Boilers/Process Heaters at Refineries with Heat Input >= 200 mmBTU/hr Committee Meeting #3 June 21, 2006.
Presented by: Eastern Research Group, Inc. May 10, 2005 Status Report to the Stationary Sources Joint Forum: Task 2: Control Technology Analysis.
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005
NSPS Rulemakings for Greenhouse Gas Emissions
BART Overview Lee Alter Western Governors’ Association
GHG Permitting: Regulatory Update
Status of Regional Haze Rule
Western Regional Haze Planning and
Kansas Air Quality Seminar March 5, 2008
WRAP Stationary Sources Forum Meeting November 14-15, 2006
Regional Modeling for Stationary Source Control Strategy Evaluation
Presentation transcript:

1 Colorado BART APCD

2 Class 1 Areas National Parks and Wilderness Areas 12 in Colorado 4 National Parks 8 Wilderness Areas

3

4

5 BART Rulemaking Stakeholder Process Most BART Sources Involved Rule Passed March 2006 Modeled After EPA Rule

6 BART Rule Contribute 0.5 Deciview Cause 1.0 Deciview Pollutants – NOx, SO2, PM VOC not included

7 BART Rule Post Combustion Controls NOT to be considered for NOx Presumptive limits applicable to Coal Power Plants as guideline 5 Factors also considered Only 1 plant over 750 MW

8 BART Rule Consideration of Impact on Coal Mines in Colorado Due to concern over classification of sub-bituminous coal Presumptive Limits based on Powder River coal

9 BART Rule Some Colorado Sub-bituminous has higher Nitrogen and lower volatility Presumptive levels can’t be met Alternatives allowed SIP must be approved by Legislature Applications Received August 1, 2006

10 Previous BART Actions Certification of Visibility Impairment in Mt. Zirkel Wilderness by USFS in 1993 Craig and Hayden Power Plants were Implicated Settlements agreed to in 1996 and 2001

11 Craig plant Units 1 & 2 Had Wet Limestone Scrubbers and ESP Upgrade of Scrubbers – eliminate by-pass, improve spray modules with trays

12 Craig plant New Baghouses New Lo –NOx burners with overfire air SO lb/MMBtu 30 day average 0.13 lb/MMBtu 90 Day NOx – 0.30 lbs/MMBtu annual average

13 Hayden Plant Units 1 and 2 Originally only ESPs New Controls Lime Spray Dryer Baghouse Lo-NOx Burners w/OFA

14 Hayden Plant SO Ib/MmBTU 30 day 0.13 lb/MMBtu 90 day average Hayden and Craig actions included in Visibility SIP

15 Colorado BART Because all but one of our BART sources are power plants, Guidance was issued to simplify the BART analyses. Look at Lime Spray dryers only Look at Current Lo-NOx burners and overfire air

16 Colorado Bart Consider ROFA if can’t reach presumptive levels (per EPA Appendix Y) All Plants have baghouses Sources can look at other controls if they want.

17 Colorado BART We hoped to simplify the BART process by using information gained from Craig and Hayden Settlements.

18 BART SOURCES Built between 1962 & 1977 Before PSD rules applied One of 26 listed source categories PTE > 250 TPY Emit SO2, NOx, PM10

19 COLORADO SOURCES Originally 16 Facilities Final List 9 facilities 13 Coal Electric Units 1 Portland cement plant 2 Coal Fired Industrial Boilers

20 EXEMPT SOURCES Reconstruction Deminimis Impact Modeled Less than 0.5 deciview

21 Exempt Sources Gas Fired Boilers < 250 MMBtu/hr each Reconstructed - Portland cement plant and Steel Mill Arc Furnace Pharmaceutical Production – VOC only Refinery and Power Plant – Modeled below 0.5 dV One plant shutdown

22 COLORADO EMISSIONS From Stationary Sources 2003 SO2 – 83,640 Tons per Year NOx – 123,273 TPY

23 BART ALTERNATIVES Must Be Better than BART July 2005 BART Rule Provides for Two pronged test to evaluate Emissions reduction or Modeling Colorado will use Emission Test, Similar to CAIR example

24 Existing Agreements XCEL Voluntary Emission Reduction Agreement – 1998 SO2 Emission Cap in Metro Denver Area – 10,500 TPY Three Plants – 7 units involved Previous SO2 = 25,000TPY

25 XCEL AGREEMENT Settles contested issue involving Pawnee plant and its BART applicability In existence date is contested Alternative includes BART Presumptive level Controls on Pawnee

26 Comanche Plant Units 1 & 2 – 350 MW each are BART sources. Agreement reached in order to Build Unit 3 (750 MW) New LSD, Lo-NOx Burners and OFA Limits less than BART Presumptive

27 Emission Reduction Estimate SO2 - 34,000 Tons per Year Includes 12,000 from Comanche NOx - 7, ,000 TPY

28 ISSUES Post Combustion Controls Annual Limit in XCEL Agreement Are the Alternatives Appropriate? Little Guidance in New EPA Alternative Rule

29 ISSUES How much Visibility Improvement is necessary for a source to achieve. What $/Ton levels should be used to judge cost? Should there be a $/deciview level set? Averaging Times

30 Future Action Complete BART Determinations/Appeals and Conduct Public Comment in January 2007 Receive EPA comments on Alternatives Appeal of BART determinations Rocky Mountain National Park Nitrogen deposition

31