2009 DCA CDBG/CHIP Applicants’ Workshop Housing and Multi-Activity (Advanced) Work Write-Ups, Specifications, and Requests for Bid.

Slides:



Advertisements
Similar presentations
WE OFFER ALL TYPES: Carpet Hardwood Laminate Ceramic Vinyl Bamboo …………….and many more.
Advertisements

CON 4003 Construction Estimating Prof R. V. Locurcio.
Picky Homeowner Project By Kayla Period 7 Math02\27\07.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
112 inches (in) = 1 foot (ft) 336 inches = 1 yard (yd) 55,280 feet = 1 mile (mi)
Converting Customary Measurement Units
inches = 1 foot 3 feet = 1 yard 36 inches = 1 yard 5280 feet = 1 mile 1760 yards = 1 mile.
Floor Coverings Objective 4.02.
Flexible Budgets and Standard Cost Systems
Did you ever dream of designing your own bedroom? Today we will begin with choosing items to go into your room.
FRONT- I50 sq. ft. BACK-150 sq. ft. SIDE-80 sq. ft. + SIDE-80 sq. ft. 460 sq. ft. 460 sq. ft. 460 ÷ 10 =46 gallons , x x 46.
Measuring Masonry Work
Manufacturer’s Recommendations
2009 CDBG/CHIP Recipients’ Workshop CDBG LABOR STANDARDS.
Name__________________ MCC3.MD.5,6 Assessment 1. John built a rectangle using square meter units. He made four rows with six square meter units in each.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Holt CA Course Area of Parallelograms AF3.1 Use variables in expressions describing geometric quantities (e.g., P = 2w + 2l, A = bh, C =  d–the.
2009 CDBG/CHIP Recipients’ Workshop Section 3. Page CDBG/CHIP Recipients’ WorkshopSection 3 What is Section 3? Provision of the Housing and Urban.
Landscape Business Concepts
Before - CarpetAfter - Tiles SCHOOL TO WORK. BY:ZACHARY AND JULIAN.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
2009 CDBG/CHIP Recipients’ Workshop Project Interface with DCA Basic procedures for communicating with DCA on project (unit by unit) basis.
Specification & Quantities Estimating
Measurement: Changing Customary Units
CF Solar Panels. 9I&safe=active 9I&safe=active.
TILE MAN INSTALLS AGAIN! TILE INSTALLATION.
How to Calculate Landscape Estimates and Quotes 2.01 Apply procedures to perform calculations used in estimates and quotes.
Bell Work Which number is twice as much as the square root of ten
Rhiannon Day and Larissa McBride.  Make A Plan For Finding An Area For The Floor To Be Tiled. Include The Geometric Formulas You Will Use To Find The.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
2010 Fence Maintenance Plan October 28, It is time to paint the iron fences located in our community. Iron fences enclosing owner yards are owner.
Do Now 9/16/15 A contractor gets a 5% discount from retail price at a supply company. If the retail price for her purchase was $8,420, what does she pay.
 Overview of Interior Finishes  Types  Examples.
Oracle Services Procurement
Dream home By Zaviawna Gathers. Bedroom #1 Berber flooring with tan color Price of floor $3.89 Cost of the room $
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
or * * P =22 in P =40 cm
START Electronic Field Book Goal Installing Field Book Program on the PDA.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Name ____________Class_____ Date______ Area of Rectangles The ________ _ of a figure is the amount of surface it covers. It is measured in ________ __.
Sneak Peak at CHFA Cost Study Preliminary Findings
1. What is the area of the shaded figure if each square is an inch?
Find Area Mrs. Planavsky 4th Grade.
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Area of Shapes.
Just Listed…Near Boeing & Airport
Business Markets and Business Buying Behavior
PS&E – Plans, specifications and estimate
Estimating the Cost for the Concrete Pad
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Awarded Vendors Bid No MS Packaged Ice Delivery Service Contract Term ends 5/2/2023 (6 years) Board Approved PA# Vendor Vendor# Vendor Contact .
Part 3 Module 6 Units of Measure in Geometry
(Course Name) Bunker Renovation
Business Markets and Business Buying Behavior
Estimating the Cost for the Concrete Pad
By: Nitu and Devorah Professor Mingla Question #8
House Construction Budget Plan
The Distributive Property
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
Estimating the Cost for the Concrete Pad
Multiplying Fractions and Mixed Numbers Guided Notes
Length in the Customary System.
Business Markets and Business Buying Behavior
PROJECT.
PROJECT.
Presentation transcript:

2009 DCA CDBG/CHIP Applicants’ Workshop Housing and Multi-Activity (Advanced) Work Write-Ups, Specifications, and Requests for Bid

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups A document that details individual tasks that will be addressed during the course of the Rehab project.

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups The Work Write-Up will contain: ▪A Specification detailing materials to be used. ▪The Method that will be used to install the item. ▪The Quantity of the material required to complete the task. ▪An Estimated Cost of the material and labor required to complete the task.

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups: the Specification A Specification describes, in great detail, the material and it’s attributes that will be used in the completion of the task. ▪Size or quantity of material required. ▪Composition: wood, fiberglass, vinyl, tile, linoleum, brick, Hardi-plank, tile, etc. ▪The material attributes: color, texture, pattern. ▪Quality or manufacturer name brand (“or equal”)

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups: the Specification A Specification describes, in great detail, the method of installation that will be used to complete the task. ▪Attaching hardware type. ▪Procedures and steps necessary to ensure professional results – Manufacturers Instructions.

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups: Standard Units of Measure The Standard Unit of Measure is the basic unit by which the material is sold. ▪Square foot – sq. ft. ▪Square yard – sq. yd. ▪Each – ea. ▪Linear foot – Lf. ▪Square – sq. ▪Gallon – gal.

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups: Unit Cost The Unit Cost is the cost of each standard unit of measure. ▪Paint: $19.75 per gallon ▪Base board: $.88 per linear foot ▪Windows: $ each ▪Carpet: $15.15 per square yard

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups: Quantity The quantity of materials, described in Units of Measure, that will be needed to complete the task. ▪722 sq. ft. ▪13 sq. yd. ▪17 each ▪275 Lf.

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups: Cost Costs: the Unit Cost multiplied by the number of units (Standard Units of Measure) required. ▪12 $19.75/gal. $ ▪135 $.88/ Lf. $ ▪9 $ ea.$ ▪27 sq. $15.15/yd. $ Total: $2,789.85

Page CDBG/CHIP Applicants’ Workshop Work Write-Ups – an example

Page CDBG/CHIP Applicants’ Workshop Request for Bids The Request of Bid contains the same information as the Work Write-Up EXCEPT The Unit cost and the Total cost

Page CDBG/CHIP Applicants’ Workshop Request for Bids Distribute the Request for Bid among as many QUALIFIED contractors as possible. Compare your cost estimate to those received from your contractors. Select best (not necessarily lowest) bid. Ignore “Low Ball” bids. Negotiate final cost with selected contractor.

Page CDBG/CHIP Applicants’ Workshop Request for Bids - an example

Page CDBG/CHIP Applicants’ Workshop Things to Remember Have the homeowner initial each page of the Work Write-Up. Explain each item. Include the Request for Bids in the Final Contract. Have the home owner and contractor initial each page of the Request for Bids as part of the Final Contract. Your Anniversary Date and Spouse's birthday.

Page CDBG/CHIP Applicants’ Workshop Questions or Comments Tom Spinks (404)