G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Collimation and tagging instrumentation for the GlueX photon beamline Richard Jones Igor Senderovich, Anne-Marie Carroll University of Connecticut APS/DNP.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
G2P Target installation and Beyond. Schedule Pivot before.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Y. R. Roblin, Apr 23, 2009 Hall D Fast Feedback System Performance and configuration.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
ION CHAMBER INTRODUCTION TRANSITION - HANDOFF FROM EESIC SESSION 1 21 SLIDES TOTAL OCT
Bubble Chamber Planning Meeting 04 September
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Beam Instrumentation for Orbit Stability I. Pinayev.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Y. R. Roblin Hall A beamline and accelerator status.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Bubble Chamber Planning Meeting 07 August
Beam Position Reconstruction Pengjia Zhu 02/15/2012.
G2P Installation Readiness. Fast raster & Calorimeter.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
G2p/GEp Beamline Status Tim Michalski Project Lead.
Beam Commissioning Adam Bartnik.
EYETS David Hay EN-OSS.
Collimation and tagging instrumentation
Injectors BLM system: PS Ring installation at EYETS
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
UITF MPS system requirements
Bubble Chamber – Beam Requirements
Beam Current Monitoring with ICT and BPM Electronics
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Trent Allison Ops StayTreat 2015
(Beam) Commissioning Plan
Undulator Cavity BPM Status
UITF Conduct of Operations Review
ThomX – Commissioning Meeting – 25/01/2018
Cu67 Isotope Radiator & Target
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Isotope Readiness Review Run Plans
Presentation transcript:

g2p/GEp Beamline Tim Michalski Project Lead

Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet FZ2 Magnet Viewer Diagnostics Girder (BPMs, Harp) IIC1D07 IIC1D0A DUMP ION CHAMBERS

Slow Raster Technical –Signal generator control from Counting House –Up to 25mm diameter raster pattern – uniform energy distribution across target face Safety –OSP modified from Hall C use –Masked for beam setup in straight thru configuration with Tune beam Status –Verified during commissioning run –Ready for physics

Tungsten Calorimeter Technical –Repositioned from Long Girder in Hall A –Controller redesigned and rebuilt w/PC104, new control SW –Calibration demonstrates 1% accuracy in beam current measurement Safety –No change from historical Hall A operation Status –Verified during commissioning run –Ready for physics

BCM w/ new 2-Channel Receiver Technical –New 2 channel receiver electronics design – tailored for low current measurement –Standard BCMs Safety –No change from historical Hall A operation Status –Verified during commissioning run –Ready for physics

BPM w/ new 4-Channel Receiver Technical –New 4 channel receiver electronics design – tailored for low current measurement –M15 antenna style BPMs Safety –No change from historical Hall A operation Status –3 units complete and tested - fully characterized and tested in electronics lab –30 Hz and Beam Sync implemented –Finalizing SW by February 9 –Requires final installation and testing

BPM w/ new 4-Channel Receiver Technical –Required Input Parameters Dynamic Range - Imin and Imax (50 nA < G2P < 150 nA) Resolution/Accuracy - Determines SNR (G2P ~ 100 um) Based on physics and algorithm Output Rate - Ultimate system BW and output sample rate (G2P = 2 kHz) Isolation - Crosstalk and rejection of “systematics”

BPM w/ new 4-Channel Receiver Signal is Sensor-Specific 100um resolution requires SNR =34 dB. M15 will provide nA

BPM w/ new 4-Channel Receiver Required Noise Floor = -136 dBm Required Noise Fig. (BW=2kHz) = 5 dB Actual receiver Noise Figure = 2- 3 dB (based on gain setting) M15 w/ Prototype Electronics, BW ~ 2000 Hz

Superharp Technical –50 um wire –New fork design –New controller chassis – PC104 w/ new SW Safety –No change from historical Hall A operation Status –Tested during commissioning run Trigger needs to be adjusted Will test electronics and interface with an injected signal Increased wire size and material –Ready for physics

FZ Magnets and PSs Technical –FZ1 – VDC (PS) Requires AI magnet in series to achieve desirable load on PS –FZ2 – VDC (PS) –New vacuum chambers to contain beam path for all energy levels –Draws from hall LCW for cooling (magnets and PSs) Safety –OSP approved and in hall –Hardware Interlocks on PS –Klixons on magnets –Beacons – interlocked to PS –Signage Status –Full power test status – FZ1 tested complete, FZ2 PS failed component at 95% (repair and retest)

FZ Magnets and PSs

Chicane Control box removed when not being used.

Chicane Viewer Girder Diagnostics Girder 2 BPMs, 1 Superharp

Chicane Technical –2 FZ magnets, viewer, 2 BPMs, superharp –FZ2 magnet on vertically adjustable stand to accommodate all beam energies –FZ2 repositioning and alignment required at multiple times during physics run (viewer and diagnostics girder repositioning is also required) Safety –OSP is approved and in hall –FZ2 stand controller is removable from the hall –Standard PPE Status –Used for straight through operation during commissioning run –Design change in process to improve robustness of diagnostics girder mount (withstand loads due to vacuum) –No issues expected with final 2B alignment

Safety Systems Interlocks –Diffuser – water flow –Calorimeter –Compton Electron Detector –Radiator –Target Movement –Hydrogen Sniffer –UPS SW Crash –Lumi and Ion Chambers –BLM –Vacuum –FZ1 and FZ2 Magnets –Septum Magnet –Target Magnet –Fast Raster –H2 Sense –Water Flow –Differential Pressure –Supply Pressure –Supply Temperature

Experimental Run Plan Run #Beam EnergyMax Beam CurrentTarget AngleTarget LocationSepta MagnetDumpTarget MaterialTarget fieldComments uAN/A87 cm upstreamN/AHall A DumpN/A0Straight Thru Beam nA9087 cm upstreamYes-6degHall A DumpNH32.5 T 1a nA9087 cm upstreamYESHall A DumpCal/optics2.5 Tempty tgt or one of the optics tgt nA787 cm upstreamYESHall A dumpNH32.5 T 2a nA787 cm upstreamYESHall A dumpCal/optics2.5 Tempty tgt or one of the optics tgt uAN/A87 cm upstreamN/AHall A DumpN/A0Straight Thru Beam nA787 cm upstreamYESHall A dumpNH32.5 T 3a nA787 cm upstreamYESHall A dumpCal/optics2.5 Tempty tgt or one of the optics tgt nA9087 cm upstreamYes-6degHall A dumpNH32.5 T 4a nA9087 cm upstreamYESHall A dumpCal/optics2.5 Tempty tgt or one of the optics tgt uAN/A87 cm upstreamN/AHall A DumpN/A0Straight Thru Beam nA9087cm upstreamYESHall A dumpNH32.5 T nA787cm upstreamYESHall A dumpNH32.5 T 6a nA787 cm upstreamYESHall A dumpCal/optics2.5 Tempty tgt or one of the optics tgt nA9087 cm upstreamYes - 6 degLocal DumpNH35.01 T 7a nA9087 cm upstreamYESLocal DumpCal/optics5.01 Tempty tgt or one of the optics tgt nA787 cm upstreamYes- 6 degHall A dumpNH35.01 T uAN/A87 cm upstreamN/AHall A DumpN/A0Straight Thru Beam nA9087 cm upstreamYes - 6 degLocal DumpNH35.01 T 9a nA max9087 cm upstreamYes - 6 degLocal DumpCal/optics5.01 Tempty tgt or one of the optics tgt nA787 cm upstreamYes - 6 degHall A DumpNH35.01 T nA087 cm upstreamYes - 6 degHall A DumpNH35.01 TLongitudinal target polarization run