W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
9 Mar 2011CMS Calorimeter Trigger Upgrade1 Sridhara Dasu (a), Rob Frazier (b), Tom Gorski (a), Geoff Hall (c), Greg IIes (c), Pam Klabbers (a), Dave Newbold.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
P. Klabbers, U. Wisconsin, IRPD13, October 2013 New CMS Level-1 Trigger - 1 New CMS Level-1 Trigger Design for the Upcoming Data Taking Pamela Klabbers.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
CMS Calorimeter Trigger Upgrades
Wesley Smith, U. Wisconsin, PMG, January 16, 2013 Trigger Upgrade – 1 Trigger Upgrade Wesley H. Smith University of Wisconsin Darin Acosta University of.
LHC CMS Detector Upgrade Project B04-3 Calorimeter Trigger Sridhara Dasu, University of Wisconsin DOE CD1 Review 26 August 2013 Sridhara Dasu, 26 August.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Wesley Smith, U. Wisconsin Project Management Group March 25, 2015
T. Gorski, et al., U. Wisconsin, October 4, 2010 Calorimeter Trigger Upgrade Hardware R&D Program - 1 Calorimeter Trigger R&D Calorimeter Trigger Upgrade.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Proposal Wesley Smith, U. Wisconsin Fermilab Directors’ Review 16 July 2013 Fermilab Director's.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Proposal Wesley Smith, U. Wisconsin Fermilab Directors’ Review 16 July 2013 Fermilab Director's.
Wesley Smith, U. Wisconsin, PMG, January 16, 2013 Trigger Upgrade – 1 Trigger Upgrade Wesley H. Smith University of Wisconsin Darin Acosta University of.
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
P. Klabbers, U. Wisconsin, TWEPP September 2012 CMS Calorimeter Trigger Upgrade - 1 CMS Level-1 Upgrade Calorimeter Trigger Prototype Development P. Klabbers.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
LHC CMS Detector Upgrade Project Calorimeter Trigger Sridhara Dasu, University of Wisconsin DOE CD1 Review 26 August 2013 Sridhara Dasu, 26 August.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
LHC CMS Detector Upgrade Project B04-1 – Trigger Upgrade Overview Wesley Smith, U. Wisconsin L2 Manager, WBS August 26, 2013 Wesley Smith, 26 August.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Tom Gorski, U. Wisconsin, July 20, 2009 SHLC RCT - 1 CMS Calorimeter Trigger SLHC Regional Calorimeter Trigger System Design and Prototypes Tom Gorski.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Status & Plans for Backend Program  Backend Architecture  Current Status  Schedule for HF Backend  Schedule for HB/HE Backend  Summary & Plans November.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
BO1-2 Calorimeter Trigger W. H. Smith, U. Wisconsin-Madison L3 Manager, HL-LHC Calorimeter Trigger Upgrade, Director’s Review of US-CMS.
BO1-1 Calorimeter Trigger W. H. Smith, L3 Manager, Calorimeter Trigger, Director’s Review Draft January 21, Jan-2016 W. Smith.
LHC CMS Detector Upgrade Project Level-1 Trigger Update Wesley Smith, U. Wisconsin Project Management Group July 22, July 2015, Wesley Smith PMG:
BO1-1 Calorimeter Trigger W. H. Smith, L3 Manager, Calorimeter Trigger, Director’s Review Rehearsal January 15, Jan-2016 W.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Status of the oSLB project
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Regional Cal. Trigger Milestone: Major Production Complete
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Calorimeter Trigger Cost and Schedule
Regional Cal. Trigger Milestone: Production & Testing Complete
Slice Test Planning Schedule(s) and Milestones.
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CMX Status and News - post PRR -
CMX scope and functionalities
CMS Calorimeter Trigger Phase 1 Upgrade
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E. Friis, R. Fobes, T. Gorski, M. Grothe, P. Klabbers, I. Ojalvo, I. Ross, W.H. Smith Physics Department K. Compton, A. Farmahini-Farahani, T. Gregerson, M. Schulte, D. Seemuth ECE Department U. Wisconsin – Madison Grand Unified Trigger Calorimeters Schedule Meeting November 9, 2011 (Thanks to J. C. da Silva for assistance with oSLB schedule) Outline: Calorimeter Trigger Major Milestones Details of Evolution Schedule of ORM-CTP system

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 2 End of LS1 (December, 2014): All Calorimeter Trigger Fibers installed OptoSLBs installed in ECAL (# TBD), uHTRs installed in HF +.. ORMs installed on RCT cards (to match ECAL oSLBs & HCAL uHTRs where installed – HF + … ) All Cal Trigger uTCA Crates installed without electronics Prototype Calorimeter Trigger Processor (CTP) cards installed in one uTCA Cal Trigger Crate interfaced to & read out by DAQ, as well as sending a trigger bit to Global Trigger as technical trigger bit. Review Charge: January 2016: Full Upgrade Calorimeter Trigger system installed, commissioned and operational. Review Charge: End of LS2: Delay system production by time from Jan 2016 to end LS2 Schedule up until production stays the same since need to complete work in LS1 Major Schedule Milestones

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 3 Calorimeter Trigger Primitives Present Connections Regional Calorimeter Trigger To DAQ Via GCT HCAL HTR Cards To DAQ Via HCAL DCC2 Existing Copper Cables ECAL TCCs To DAQ Via ECAL DCC Existing Copper Cables

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 4 Calorimeter Trigger Primitives Connection Evolution Regional Calorimeter Trigger HCAL uHTR Cards ECAL TCCs SLHC Cal Trigger Processor Cards Optical Ribbons OSLBs ORMs Trigger Primitive Optical Patch Panel (Modular – grows to meet needs) ECAL Opti. Ribbons ECAL Indiv. Fibers (LC) Optical Ribbons To DAQ Via BU “AMC13” To DAQ Via GCT To DAQ Via BU “AMC13” To DAQ Via ECAL DCC HCAL HTR Cards To DAQ Via HCAL DCC2 Existing Copper Cables HCAL Opti. Ribbons ECAL TCCs To DAQ Via ECAL DCC Existing Copper Cables

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 5 Calorimeter Trigger Primitives Final Situation HCAL uHTR Cards ECAL TCCs SLHC Cal Trigger Processor Cards Optical Ribbons OSLBs Trigger Primitive Optical Patch Panel (Full) ECAL Opti. Ribbons Optical Ribbons To DAQ Via BU “AMC13” To DAQ Via BU “AMC13” To DAQ Via ECAL DCC HCAL Opti. Ribbons

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 6 Rev A Calorimeter Trigger Processor Prototype: Mar ’12 Rev A CTP Prototype Testing SW & FW: Mar ’12 Testing of Rev A CTP Proto: Mar-Apr’12 Rev A Optical Receiver Mezzanine (ORM) Prototype: May ’12 Rev A ORM Testing SW & FW: May ‘12 uTCA Crate & backplane constructed: Jun’12 Integration of ORM first prototype with Calorimeter Trigger Processor (CTP) Prototype Board Jul-Oct ’12 Integrate ORM first proto. w/ECAL oSLB & HCAL uHTR in 904, Oct-Dec ‘12 Construction of Rev B prototype series CTP & ORM Cards Jan-Mar’13 Rev B Prototype CTP & ORM Testing SW & FW Mar’13 Testing of Rev B prototype series CTP & ORM Cards Apr-Jun’13 Testing & Integration of Rev B prototype series CTP & ORM Cards in 904 with ECAL oSLBs & HCAL uHTRS, Jul-Oct’13 Installation & Testing of uTCA Cal trigger crate at Point 5, Oct-Dec’13 Final ORM testing SW & FW: Oct’13 Production & testing of ORMs Oct-Dec’13 Schedule through 2013

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 7 Testing & Integration of 1 Crate’s worth of optical fibers connected to oSLB’s & uHTRs (where applicable) & RCT at Point 5, Jan-Mar’14. Complete Production of uTCA backplanes & crates by Vadatech: Jan’14 Test of of uTCA backplanes & crates by Vadatech: Feb-Mar’14 Integration of ORM & CTP SW & FW at Pt. 5: Mar-Apr’14 Installation of uTCA Crates & Backplanes at point 5: Apr-Jun’14 Installation of fiber optic plant to oSLB’s, uHTRs and ORM’s in RCT cards at point 5, Apr – Jun’14 Testing & Integration of oSLBs, fibers, uHTRs and ORMs in RCT cards at point 5, Jun– Oct.’ 14 Validation of Algorithms in CTP FW, Jun-Oct’14 Re-commission existing cal trigger with ORM’s in RCT, Oct-Dec.’14. Production of CTP Cards: Jun-Sep’14 Testing of production CTP Cards: Oct-Dec.’14 Completion of Production SW & FW: Dec’14 Schedule 2014

W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 8 Parallel operation of 1 crate with SW & FW including algorithms during data-taking Jan-Jun’15 Integration of production SW & FW at 904 & Pt. 5: Jan-Mar’15 Integration testing in 904 with ECAL TCC/oSLBs & uHTRs: Jan-Mar ’15 Installation & test in pt. 5: Apr -Jun ’15 Commission full system: Jul-Sep’15 Parallel Operation full system demonstration: Jul-Dec’15 Full System Operation: Jan ‘16 onward Schedule 2015+