Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/09 Preliminary Satellite in flight status.

Slides:



Advertisements
Similar presentations
IOCP KP-0 / 09 December 2009 HB-1 In-Orbit Commissioning Phase : IOCP Key-Point 0 09 December 2009 ( L + 37 Days ) ESAC – Villafranca.
Advertisements

1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
Scintillation effects on Galileo service performance
Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Time & Frequency Products R. Peřestý, J. Kraus, SWRM 4 th Data Quality Workshop 2-5 December 2014 GFZ Potsdam Recent results on ACC Data Processing 1 SWARM.
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Input to CCSDS P&P WG Chris Taylor CCSDS 2011 Berlin.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
1.STSE 2.Objectives of today 3.Data availability 4.Reprocessing 5.RFI 6.Conferences & user meetings Introduction – SMOS mission status.
Tsunamis Detection The Mission  Tsunamis Detection can help to minimize loss of life and property from future tsunamis. Mission Introduction Mechanism.
UNITED STATES ANTARCTIC PROGRAM SOUTH POLE SATELLITE COMMUNICATIONS UPDATE Nicolas S. Powell 15 July 2002 Raytheon Polar Services Company Denver, Colorado.
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
SDS ® Surge Defence System innovative electronic surge protection Costruzioni Elettromeccaniche P. Torresan Engineering.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
University at Buffalo GLADOS SHOT II Balloon Payload Presentation June 29, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
HIMALAYA Test Review 16/12/2013 STI Deliverables: D4.1, D4.2 and D4.5.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
IOCP Key Point 0 © Rafa Leon Guillermo Buenadicha OPS OEX SMOS LEOP & SODAP OPERATIONS © Rafa Leon.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Picard Consortium meeting – PMOD/WRC, Davos, Nov 2010 Instrument SOVAP ( IRMB A. Chevalier pour S. Dewitte)  Flight operations  Right shutter status.
High resolution simulation of August 1 AMMA case: impact of soil moisture initial state on the PBL dynamics and comparison with observations. S. Bastin.
Making good from bad: Can we use GPS multipath to measure soil moisture? Kristine M. Larson Department of Aerospace Engineering Sciences University of.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
IOCP High Level Plan, 8 September In-Orbit Commissioning Phase: High Level Planning.
Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/ Operations Report of LEOP S. Burgaud / CNES.
Design Features of a Boresighted GPM Core Radiometer Christopher S. Ruf Dept. of Atmospheric, Oceanic & Space Sciences University of Michigan, Ann Arbor,
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Ivan Procházka, Jan Kodet presented at : seminart ACES – ELT Meeting, Fundamental Station Wettzell, Technische Univ.Muenchen, Germany May 8, 2009 Czech.
SMOS QWG-9, ESRIN October 2012 L2OS: Product performance summary v550 highlights 1 The SMOS L2 OS Team.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
ESA UNCLASSIFIED – For Official Use Proba-V QWG-2 Platform status 28 October 2015.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Ian Chen Matt Uhlman 1.
VOCALS NSF C-130 Data Assessment Report. Resources Project Documentation: (RAF – Field Projects) Project Documentation:
ASI, February 2009 The GRAS Instrument C. Marquardt, Y. Andres, A. von Engeln, F. Sancho.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
Flygteknik, Oktober -10 FLIGHT RESULTS FROM PRISMA FORMATION FLYING AND RENDEZVOUS DEMONSTRATION MISSION Staffan PerssonSwedish Space Corporation Per BodinSwedish.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
SMOS Commissioning KP-0, ESAC, 9 December /17 Payload Functionality during SODAP: preliminary review SMOS Project Team, ESTEC/ESAC/ESRIN EADS-CASA.
 jc ( ° C/W): thermal resistance from transistor junction to transistor case  cs (°C/W): thermal resistance from transistor case to heat sink  sa (°C/W):
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
PRESENTATION SATRACK DIPTI ON SUBMITTED BY : EC (3) BBDESGI
DUAL POLARIZATION AND ZDR CALIBRATION IMPROVEMENTS 5.2(6)
11T Magnet Test Plan Guram Chlachidze
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
Input to CCSDS P&P WG Chris Taylor CCSDS 2011 Berlin.
Quench Protection Measurements & Analysis
SDO Flight Dynamics Subsystem
Argos Performance of WOCE Drifters at Half and Full Transmission Power
STO2 Thermal Desktop Model
Balloon Observatory for Wavelength and Spectral Emission Readings
دورة المياه في الطبيعة سنة دراسيه
University of Maryland DYMAFLEX SHOT II Post-Flight Presentation
Signal Conditioning.
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Systems Integration Christopher Bessette Alexander Reich
Argos Performance of WOCE Drifters at Half and Full Transmission Power
Presentation transcript:

Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/09 Preliminary Satellite in flight status

2 SMOS IOCP Key-Point 0 09/12/09 Satellite activities Satellite main activities performed since separation –First acquisition in stowed configuration –Deployment of the PLM and 2nd SHM in deployed configuration –NOM/NOM acquisition –Gyro and thrusters calibration –OCM in plane and out of plane –Switch on of redundant equipment ( GYRO3, STR2) –inertial and zenith ECM

3 SMOS IOCP Key-Point 0 09/12/09 Preliminary Functional chain status Elctrical –Power consumption as expected including PLM (actual comparison to be performed on 21/12 for PLM heater ( worst case of eclipse)) –Eclipse and shadowing as expected –Battery management OK ; optimisation of internal resistance to be evaluated and tested before end of the year Thermal –PF CTA behaves as expected and temperature are well controlled –Coupling between S/A and PLM arms under analysis >In SHM configuration high temperature noticed on S/A due to probable specular reflexion on PLM arms >In NOM configuration, low impact for all the SADM position >Modelisation on going in TAS

4 SMOS IOCP Key-Point 0 09/12/09 Preliminary Functional chain status AOCS –Nominal behaviour –Equipment status : nominal including redundant equipment Command/ control –Nominal –Use of memory read between two addresses to recover TM R/F –Occultation of S-Band signal by PLM as expected

5 SMOS IOCP Key-Point 0 09/12/09 Satellite Ground monitoring On ground monitoring –Update of the SMOS ground monitoring – very few modifications >Yellow and red alarms threshold for PLM temperature, current, SL consumption –Update of the documentation on expected alarms New SDB to be released by end of CW50 Monthly report –Number of cycling of IHTSN/IHTSR added

6 SMOS IOCP Key-Point 0 09/12/09 Conclusion The satellite behaves as expected, no anomaly noticed so far Complete presentation of in flight assessment on 14 January in Thales premises