TM/WS 9-12 February 20101 GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group A3- National position - Stakeholders involvement - Legislative framework - Safeguards QUESTIONS / DIFFICULTIES 1. Difference.
Advertisements

UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
International Atomic Energy Agency Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for.
Infrastructure Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 2.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Regulatory Body MODIFIED Day 8 – Lecture 3.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Governmental, Legal and Regulatory Framework in Azerbaijan Republic Aysel Hasanova, Akbar Guliyev, Emin Mansurov Regional Workshop - School for Drafting.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
1 9/15/2015 Gogita Todradze National Statistics Office of Georgia Institutional Arrangements for Energy Statistics in Georgia.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Tom MAZOUR IAEA, Division of Nuclear Power
IAEA - Department of Nuclear Safety & Security
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
IAEA International Atomic Energy Agency Nuclear Energy Programme Implementing Organization (NEPIO) Anne Starz Nuclear Power Engineering.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Institutional Arrangements for Adaptation Achala Chandani Researcher International Institute for Environment and Development european capacity building.
IAEA International Atomic Energy Agency Presentation held at the Workshop on Lessons Learned from IRRS Missions Moscow, Russian Federation 9-11 December.
International Atomic Energy Agency IAEA Nuclear Knowledge Management Programme Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation.
1 THE INTRODUCTION OF THE FIRST NPP IN TUNISIA PROJECT STATUS Jomaâ Souissi Souad Baccouche Société Tunisienne d’Electricité et du Gaz Centre National.
Human Resources Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 1 Moderator: Mr. Biro Lucian (Romania) Reproter:
TM/WSP 5-9 Nov Group B1- Management - Human resources development - Financing - Electric grid, industrial inv. and procurement QUESTIONS / DIFFICULTIES.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
IAEA International Atomic Energy Agency Working Group 3B Developing a Capable NEPIO Difficulties and Solutions (solutions will follow difficulties)
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
1 Slovak Policy in the area of RE and EE Juraj Valach Ministry of Economy Slovak Republic July 3-4, 2003, Szentendre.
IAEA International Atomic Energy Agency Nuclear Power Infrastructure Development Technical Meeting/Workshop on: TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT:
TM/WS 9-12 February Group 3 Human Resources Development Break-out Session 1. EXPERIENCES  Core group (NEPIO=Coordination Group) involved in the.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Directions for Strengthening the Agency's Assistance to Countries Considering or Introducing Nuclear Power Technical.
IAEA International Atomic Energy Agency RER2006 RTC Establishing a Nuclear Safety Infrastructure for a National Nuclear Power Programme Wrap up, Where.
IAEA International Atomic Energy Agency LESSONS LEARNED ON THE REGULATION OF NUCLEAR SAFETY Presentation to the Workshop on Lessons Learned from IRRS Missions.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
CAPACITY BUILDING AND E-LEARNING IN VIETNAM Le Dai Dien Nuclear Training Center – Vietnam Atomic Energy Institute Technical Meeting on the Use of the Global.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
TM/WSP 5-9 Nov Group D2- Nuclear fuel cycle, nuclear Waste - QUESTIONS / DIFFICULTIES 1. Is it reasonable for a country to build a fuel fabrication.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
TM/WSP 5-9 Nov Group C1- Regulatory framework - Nuclear safety - Radiation protection - Security and physical protection QUESTIONS / DIFFICULTIES.
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
Department for Nuclear and Radiation Safety of the Ministry for Emergency Situations (Gosatomnadzor) Leading specialist Diana Rusakevich Belarus Department.
BIMILACI 2007 THE CHALLENGE OF CAPACITY DEVELOPMENT Washington, May 11, 2007 Bayo Adeola FIDIC Executive Committee.
Infrastructure Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 4.
Regulatory Control Training Workshop Regulatory Cooperation Forum
AAEA Role in Improving EPR Coordination Interventions among Arab Countries Abdelmajid Mahjoub Arab Atomic Energy Agency
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
The role of NEPIO – Operator vs. Government
Regulatory Control Training Workshop Regulatory Cooperation Forum
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
Group C4. - Regulatory framework. - Nuclear safety
Arab Network for Nuclear Regulators ANNuR Abdelmajid Mahjoub Daw Mosbah Arab Atomic Energy Agency Tunis
CAPACITY BUILDING AND E-LEARNING IN VIETNAM
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
THE INTRODUCTION OF NUCLEAR POWER IN EGYPT AN OVERVIEW
Infrastructure Development
Nuclear Energy Programme Implementing Organisation
Presentation transcript:

TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter: Dr. Mohammad shawkat Akbar, Bangladesh NUCLEAR INFRASTRUCTURE DEVELOPMENT - BREAK-OUT SESSION 10 February, 2010, Vienna, Austria

TM/WSP 5-9 Nov EXPERIENCES FORMULATION OF NUCLEAR POLICY  Countries with limited energy resources require some positive decisions for some meaningful improvement of energy scenario with diversified fuel mix.  The Agency has developed energy models to assist MSs in making projection of their the long-term demand of energy and electricity as well as to evaluate the least cost environmental friendly secured energy supply options to meet that projected demand.

TM/WSP 5-9 Nov EXPERIENCES (Cont’d)  Most of the newcomers to NPP participated in the Agency‘s different regional and interregional projects to evaluate the country’s future energy scenario that can ensure energy security and sustainable development through assessing the role of nuclear power. Power System Master Plan is formulated FORMULATION OF ROAD MAP FOR ESTABLISHING NUCLEAR POWER INFRASTRUCTURE  The nuclear energy is identified as a viable option in the mid-to long term future in case of newcomers. Accordingly, the national long-term energy development strategy with due consideration of nuclear energy is formulated.  Completion of pre-feasibility study is carried out  Government declares national nuclear vision through making a political commitment usually in the national parliament or notification of presidential decree.

TM/WSP 5-9 Nov FORMATION OF A HIGH LEVEL COMMITTEE  A high level blanket administrative provision is established through making a high level committee for national nuclear programme headed by the head of the government or a minister. Such a high level committee integrates all activities and responsible agencies into one coherent system  Technical committees are formed amongst Ministries and feedback is provided to this high level committee on regular basis.  The high committee plays role in creation of national Nuclear Power Authority or nuclear power operating organization (Licensee).  Such a Committee is set up to establish ownership and arrange the financing and purchase of the Nuclear Power Plant. 1. EXPERIENCES (Cont’d)

TM/WSP 5-9 Nov FORMATION OF INDEPENDENT REGULATORY BODY  Separation of Regulatory body from promotional one  Formulation of nuclear law or the revision of the basic nuclear safety and radiation act  The legislative framework has set up a regulatory body which would be independent from any Licensees or energy promoters  Initiatives for HRD for regulatory body professionals 1. EXPERIENCES (Cont’d)

TM/WSP 5-9 Nov LESSONS LEARNED NATIONAL PARTICIPATION  Local participation through national competent industries are limited to non-nuclear safety components for the first project.  It is general considered that a “turn-key” project will be purchased and the procurement plan will be developed in accordance with the codes and standards of the “Vendor country”.  A policy for national industrial involvement is usually developed with the understandings of impacts on the nuclear power programme. If the national policy supports the domestic industrial involvement, a plan for quality control system is established.  A significant portion of total construction cost is incurred in local currency through participation of local construction firms, industries and services depending upon local expertise

TM/WSP 5-9 Nov INFRASTRUCTURE DEVELOPMENT Nuclear Power Infrastructure Development requires two tracks (1) Planning for Nuclear Power Utility and (2) Planning for Nuclear Power Infrastructure  Basic nuclear infrastructure is established in collaboration with the IAEA and national R & D organizations  Nuclear infrastructure for introducing of NPP is developed through assistance of Vendor country from the beginning of the NPP program. 2. LESSONS LEARNED

TM/WSP 5-9 Nov Preparation of Self-Evaluation Report on the established national nuclear infrastructure based upon IAEA document: NG-T-3.2 To review the current status of national nuclear infrastructure is very important in making decision for introducing NPP  The IAEA document: NG-T-3.2 “Evaluation of the national nuclear infrastructure development status” has provided the guidelines to carryout self-evaluation of the national infrastructure in order to identify the gaps and establishing action plans for each identified gaps.  The Agency establishes recommendations based on the self-evaluation report of the Member States and provides technical assistance to close the gaps. 2. LESSONS LEARNED

TM/WSP 5-9 Nov LESSONS LEAR NED TECHNOLOGY TRANSFER  First phase - No localization & technology transfer programme except for O&M in case of first project  Second Phase - Localization Program through Turnkey approach for Technology accumulation for NPP Localization; Component Approach Contact (Vendor: Prime Contractor, Local: Subcontractor )  Third Phase: Technology Self-rand Joint Design and Manufacturing, Accomplishment of Technology Self- Reliance

TM/WSP 5-9 Nov DIFFICULTIES/CHALANGES  Development of an appropriate NEPIO and regulatory body with adequate staffing  The development of human resources for the NEPIO and all relevant organizations including: regulatory body, the operating organization and technical supports organization  Development of funding and financing strategy for implementation of the NPP in the developing and the least developed nations  Difficulties in determining ownership of the project

TM/WSP 5-9 Nov  Development of nuclear infrastructure of a small and technologically weaker country through direct assistance of the IAEA  The development of an appropriate methodology by the Agency for BOO and BOT approaches  The Agency can take initiatives to assist MSs in making political decision on introduction of NPP. 4.RECOMMENDATIONS

TM/WSP 5-9 Nov  Initiatives for development of an innovative financing scheme by the Agency and Vendor countries through seeking the opportunities of the participation of international financing organizations such as World Bank, as well as utilization of climate change fund for newcomers of the developing and the least developed nations  Formulation of guidelines by the Agency to build up NPP by collective initiatives of neighboring countries 4.RECOMMENDATIONS

TM/WSP 5-9 Nov THANK YOU VERY MUCH FOR KIND ATTENTION