MDC Silicon meeting 24 July 03 1 Run IIb SiliconTemperature Monitoring  The basic philosophy is to build on Run IIa experience and make only minor changes.

Slides:



Advertisements
Similar presentations
WP4 Organic crystal deposition Mojca Jazbinsek Rainbow Photonics AG SOFI meeting Karlsruhe
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Vertex Detector Cable Considerations Bill Cooper Fermilab VXD.
Weather Station Project Wind Speed Wind Direction Temperature Light/Dark Sensor 1.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Overview of Temperature Measurement ME 115 Figures are from “Practical Guidelines for Temperature Measurement” unless otherwise notedwww.omega.com.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Engineering 80 – Spring 2015 Temperature Measurements
Module 3 Eng. Asma Abu Baker. Introduction One of the most important uses of instruments or measuring devices is in the field of process control. If you.
Temperature Sensors.
Interchangeability based Design of Resistance Temperature Detectors
EKT314/4 Electronic Instrumentation
Lecture 3: Bridge Circuits
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
We are Group5 Weatherstation The team Members are : Saran Jackson Robert Howard Robert Garvey Gene Fitzgerald Steven Dowling.
Electronic Devices and Circuit Theory
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
Today’s topic RTD D1&D2 Today I will talk about something of RTD and use D1 light to take the AFP Sweep.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Observational Astrophysics I
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
1 RTD (Resistance temperature detector) n Varying resistance with temperature n Good for measurement of small temperature differences n General equation.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
UNCOOLED IR DETECTOR TEMPERATURE CONTROL Performed by : Shimon Amir Yogev Ben-Simon Instructor : Arie Nakhmani 1 TECHNION - ISRAEL INSTITUTE OF TECHNOLOGY.
Temperature Sensors The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and current employees.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Lecture 3: Bridge Circuits
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
CMS Tracker: Detector Control Units & Tracker Monitoring My Summer Student project (A contribution to:) Fatima Kajout 11 th of August 2003Student Session.
Temperature Monitoring MDC, 19 Nov General Silicon meeting As a reminder, we are planning a temperature monitoring system independent of the temperature.
Semiconductors. O A Semiconductor is a material whose resistivity is between that of a good conductor and a good insulator. O Examples of materials which.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
Engineering 80 – Spring 2016 Temperature Measurements 1 SOURCE: 3_standardbody__to-226_straightlead.jpg SOURCE:
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Si Sensors for Additional Tracker
Temperature Sensors.
ProtoDUNE SP – Slow control temperature gradient monitor
Temperature sensors Temperature is the most often-measured environmental quantity. This might be expected since most physical, electronic, chemical, mechanical,
MECH 373 Instrumentation and Measurements
Preliminary thoughts on SVT services
ProtoDUNE SP – Slow control temperature readout setup test
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
ALICE Muon Tracking Upgrade EDR Answers
Characterization of a Pixel Sensor for ITK
Update of US Testing Status
Overview of Temperature Measurement ME 115
Instrumentation and Control: ME- 441 Department of Mechanical Engineering UMT 1.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

MDC Silicon meeting 24 July 03 1 Run IIb SiliconTemperature Monitoring  The basic philosophy is to build on Run IIa experience and make only minor changes  Temperature monitoring will reproduce the existing system, with an additional system for L0/L1.

MDC Silicon meeting 24 July 03 2 Temperature Monitoring  Devices used are thin film platinum resistors, Resistance Temperature Detectors (RTDs)  The Run IIa system will be reproduced, with an RTD mounted on each hybrid. u Integral part of the hybrid design u Read out through standard online monitoring 1553 system u Temperature interlocks the power to each hybrid

MDC Silicon meeting 24 July 03 3 L0/L1 Temperature Monitoring  A second temperature monitoring system will monitor the L0/L1 sensors u For L0, the hybrids are removed from the sensors u L1 has the most difficult cooling problems, so a redundant system is prudent  This system will also provide more accurate monitoring of other parts of the detector u Present system has an accuracy of about 2C, the new system will have an accuracy of 0.5C or better. u Will provide for better monitoring of the cooling system’s performance

MDC Silicon meeting 24 July 03 4 Honeywell HEL-700 RTDs  The RTDs have been selected and ordered, they are 1000 Ω, remarkably tiny devices. They are the two small specks to the left of the dime. Dimensions are 1.5mm x 0.75mm x 0.3mm.

MDC Silicon meeting 24 July 03 5 L0/L1 Temperature Readout  RTDs are read out through a commercial PLC system using commercial modules. This system is used for many monitoring and interlock functions throughout D0.  The crates and controllers (Texas Instruments 545) exist.  The readout module required modest re- engineering to handle 1000 Ω devices— already done and one module in hand.

MDC Silicon meeting 24 July 03 6 L0/L1 Temperature Readout  Readout module CTI-2557-SPQ391, 16 channel RTD module provides a constant DC current of 10 microamps and reads back the voltage.  Module, crate and controller are currently being tested at Rice. Tests underway: u Channel-to-channel uniformity u Linearity u Stability over several months u Accuracy of temperature measurement u Compensation for lead resistance

MDC Silicon meeting 24 July 03 7 Readout module test set up at Rice

MDC Silicon meeting 24 July 03 8 Readout Module Test Setup at Rice And the student who has done all the work.

MDC Silicon meeting 24 July 03 9 Readout Module Tests  First tests are being done using resistors, since the module in fact just measures resistance.  For a 1000Ω resistor, all channels tested so far measure within 1Ω of 1000Ω. This will provide for an accuracy of 0.3C.  All channels tested so far show excellent linearity from 10Ω to 1000 Ω and stability over time (up to 24hrs).

MDC Silicon meeting 24 July Readout Module Tests  For a nominal 1000 Ω resistor, all the channels measured (8/16) are within 1Ω.  Linearity and stability are also excellent.  Ω  Ω

MDC Silicon meeting 24 July Lead Resistance Compensation  But…the compensation for lead resistance seems to not work !  There are 4 leads, I 1, I 2,V+, and G. I 1, I 2 provide a constant current of 10 μ A, while V+ and G measure the voltage drop.  Adding extra 10Ω to I 1, I 2 makes no difference, as expected u This module is supposed to supply constant current at least up to 1300 Ω.  But adding 10 Ω to the G line makes a huge difference!

MDC Silicon meeting 24 July Lead resistance compensation tests  Use a 751Ω resistor with short leads, readout is 751Ω.  Adding 10Ω to I1, I2, V+, or any combination, readout is still 751Ω.  Add 10Ω to G changes the readback resistance to 833 Ω!  The G line is measured to carry 80 μ amps!

MDC Silicon meeting 24 July Lead compensation tests The additional resistances (R’) added to G, the measured current in G, and the reported resistance are all consistent: R(reported)= R(true) + 8*R’ R’= 5 Ω → R(reported)=792 R’=10Ω → R(reported)=833 R’=15Ω → R(reported)=874 R’=20Ω → R(reported)=915 Dan Markley contacted the vendors, they said “oops, we forgot to change some resistors”, the module has been sent back to them.

MDC Silicon meeting 24 July Location of RTDs in L0/L1  Z-positions of RTDs in L0/L1 : u L0 z=60mm and 480mm, six phi locations u L1 z=64mm and 384mm, six phi locations Z locations chosen to be at “hot spots” near electronics in Layer 1  Possible locations in outer layers not yet decided

MDC Silicon meeting 24 July Flex cables for RTDs  The RTDs will be mounted on flex cables which will bring signals into and out of the detector. In the junction card region flex cables convert to a higher mass cable.  Length is an issue (36” at least is needed). A prototype is on order, but the vendor is very late in delivering.  Mike Matulik has some good ideas to make spliced flex cables which we are currently pursuing. These would be much less expensive and length would then not be an issue. (We may cancel the existing order and just pursue this last option).

MDC Silicon meeting 24 July Conclusions  RTDs are in hand  Readout module is being tested u Channel-to-channel uniformity and linearity are fine u Found a serious flaw in the lead resistance compensation which the vendor claims they can fix  Flex cables remain an issue…the vendor has not yet delivered prototypes. But we have another plan which should be better and cheaper