Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.

Slides:



Advertisements
Similar presentations
DOE O Changes and the CRS
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
CIP Cyber Security – Security Management Controls
Environmental Management System (EMS)
More CMM Part Two : Details.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Contractor Safety Management
Establish Verification Procedures (Task 11 / Principle 6)
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
FPSC Safety, LLC ISO AUDIT.
WHS Management Plans.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
DOE-HSS Review of LBNL Science Divisions 10/23/08.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Ship Recycling Facility Management System IMO Guideline A.962
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
1 Internal Controls. 2 Example Internal Control Manual  Focused Assessment Exhibit 4A  /trade/trade_programs/audits/focused.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Occupational Health and Safety
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
Company duties under the ISM Code
Using the Directives Process to Track EMS Requirements Department of Energy EMS Training Workshop Columbus, OH March 7-8, 2005 Daniel L. McCollum, Quality.
Carol L. Sohn Senior Nuclear Safety Advisor, Office of Science, SC-33 1 May 5, 2011 Review of Science Sites Hazard Categorization.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
© 2013 Cengage Learning. All Rights Reserved. 1 Part Four: Implementing Business Ethics in a Global Economy Chapter 9: Managing and Controlling Ethics.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
Hazards Identification and Risk Assessment
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Understanding the EHS Management System Development Process David Downs President EHS Management Partners,Inc.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Internal Auditing ISO 9001:2015
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
OSAE sets the PACE: Premier Auditing Consulting and Evaluations! American Recovery and Reinvestment Act (ARRA) Readiness Review.
OHSAS Occupational health and safety management system.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Planning for Succession
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
DOE Review of the LCLS Project October 2006
Safety Program for LCLS Experiments
Presentation transcript:

Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager Bechtel Jacobs Company LLC

Bio for Linda K. Rogers Ms. Rogers has over thirty years of nuclear experience, spanning: Environmental Management, Safety & Health, Radiological Protection and Controls, Emergency Management, Security, Construction, Project Controls, Quality Assurance, Quality Control, Waste Characterization and Shipping at both commercial nuclear power and DOE facilities. Linda holds a Master’s Degree in Project Management and Training. In 2006, she joined the BJC Quality Assurance Department as the Assessments and Readiness Programs Manager.

Expectations for ARRA funded work Established by DOE Acting Assistant Secretary for Environmental Management: “Poor safety performance due to inadequate safety infrastructure…or lack of work planning will not be tolerated.” “… contractors establish and implement a self-assessment process that would provide a high level of assurance that any new or significantly increased work load under the ARRA is demonstrably ready…prior to conducting work.”

The CHALLENGE! Must focus on Safety and Compliance together. How to implement a rigorous review process, ensuring Safety and Compliance, without unduly impacting the project’s ability to perform work.

ISMS Principle 1: Line Management Responsibility for Safety What documents, procedures, processes, approvals, training, equipment, support must a prudent Project Manager have in place to ensure Safety and Compliance prior to starting work? How can this information be captured to demonstrate Readiness, in a transparent, rigorous, documentable, and auditable process?

A CHECKLIST IS BORN A Checklist Format was developed to identify:  Project Specific Requirements  Documentation of Compliance  Verification of Documentation Subject Matter Experts (SME) developed List of Common Requirements for Project Startup

Documentable and Auditable Process: Checklist establishes Evidence File requirements Documentation verifies:  Work Scope Identified  Hazards Analyzed  Hazard Controls Developed and Implemented  Ready to Perform Work Within Controls  Feedback and Improvement Process in Place Auditable Records would be maintained by Readiness Organization

VICTORY! Procedure and Checklist issued ARRA Funding Received for Six (6) BJC Projects:  Preparation for Demolition of K-27 Facility  Building two (2) LLW Disposal Cells  Removal of an Underground Tank  Sampling and Removal of Underground Pipeline  Installation of twenty (20) monitoring wells  Expansion of a Sanitary Landfill

Building Readiness Reviews into Project Schedules Project Managers develop detailed Project Schedules Schedule reviewed for Identification of Triggers requiring ARRA Reviews  New Subcontractor  New Activity within the Project Readiness Reviews included in detailed Project Schedules

Role of Readiness Specialists One Assigned to each Project Track Completion of Project Documentation  Track document status  Review Documents for completeness and accuracy  Assemble completed documents into Evidence Files and update Checklist  Work with Project Manager to Identify and Correct Deficiencies

Declaration of Readiness to Perform Work Project Manager determines when Project is Ready to Perform Work Readiness Specialist verifies Documentation of Checklist Requirements completed Readiness Manager conducts Independent Review of Documentation and Approves convening Senior Project Review Committee Approval of Senior Project Review Committee Chairman is Authorization Authority for Startup

Completed Reviews Two Readiness Reviews completed on Low Level Waste Disposal Cells  Initial Site Preparation  Berm and Road Construction One Review completed on K-27 Pre-Demolition Preparation

Lessons Learned Communicate, Communicate, Communicate…….. More Readiness Reviews required than originally anticipated – K-27 Pre-Demolition Preparation Final Product is a clear, concise, auditable record that will support the project’s readiness to start work safely and compliantly

Final Note On July 2, 2009 DOE-EM issued: Project Safety Oversight and the Recovery Act Readiness Evaluation (RARE) Process Objective: “This plan establishes the process by which the Department of Energy, Office of Environmental Management shall perform Recovery Act Readiness Evaluations (RARE) in support of projects identified within the scope of the ARRA of 2009”

Final Note The Checklist within the plan is based on the same ARRA Readiness Checklist presented here today.