UF Telecom Standards Overview ITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications.

Slides:



Advertisements
Similar presentations
The Lone Star College System 13 Locations spread across 1,400 square miles 5 Colleges 2 University Centers 5 Centers System Office & Training Center 4,800.
Advertisements

AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
Telecommunication Rooms
Chapter 3: Planning a Network Upgrade
We help the best buildings in the world get that way. Complete Building Solutions.
EClassroom Standards The University of West Florida.
Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.
CIT 470: Advanced Network and System Administration
SENTINEL SAFE Product Overview. SEARCHING THE DATABASE Example: Investigators can search based on detailed criteria for targeted results. In this example.
U OF C Information Technologies Network Services Group Voice Services Network Operations Security Services.
eFAX Services Overview UF Information Technology Computing & Networking Services July 1, 2013.
Company Overview Integration. Innovation, Ingenuity.
Integrated and Intelligent Building Certification for Designers and Installers: The Industry’s Path Forward for Credibility.
1 PBX installation considerations BASIC TELECOMMUNICATIONS.
Design Considerations for Telecommunications Pathways and Spaces
CONSTRUCTION BLUEPRINT READING
Ferndale Electric Company Project overview from September 2007 to present.
Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.
Copyright Michael White and Sandra Thompson, This work is the intellectual property of the author. Permission is granted for this material to be.
COMMUNICATIONS DESIGN AND IMPLEMENTATION 2010 Communications Design in Military Projects.
Managing Information UT November 13-14, 2008 Networking, Communications, and Infrastructure William Green
Lauran Technology Optimizing Communications Networks Designing, Installing and Upgrading Infrastructure - “the Client- Side of Wire-Line Systems”
SYSE 802 John D. McGregor Module 0 Session 1 Course Introduction.
Division 17/25 Organizational Model for Technology and Communication Systems “What has changed – What has not” James C. Waddell, RCDD Formare Technica,
Cisco Threaded Case Study
蓄勢待發迎WebSAMS Preparation Forum for WebSAMS Implementation Document 12
Welcome to corporate.eircom.ie This presentation aims to give you an overview of corporate.eircom.ie, what it offers you and how best to navigate your.
Tutorial 4: Working with Hyperlinks. Objectives Session 4.1 – Place bookmarks on a Web page – Create a link to a bookmark – Create a link to another Web.
SmartClassrooms A SmartClassroom is a general assignment classroom (GAC) containing technology to enhance and assist in instruction.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
1 Guide to Network Cabling Fundamentals Chapter 5.
Background Info - The state of the campus telecommunications infrastructure in December 2001.
Update on Campus Networks December 2009 Bruce Campbell Director, Network Services Information Systems and Technology.
1 Structured media enclosure (distribution device) Structured media enclosure (distribution device) BASIC TELECOMMUNICATIONS.
From 0 to “e” in 60 minutes A quick overview of MnOnline – related IT work efforts (minus D2L and web-enabled ISRS) MnOnline Summit – July 2004.
Integrating an OMS and VOIP Inmate Phone System Maine Department of Corrections xwave Corporation May 2007.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Signamax™ Cabling System Review Revision E. INTRODUCTION.
Smart Schools Bond Act High-Tech Security Projects Protecting Our Greatest Assets Conference December 2.
BACKBONE SUBSYSTEM. CABLING SYSTEM Backbone Subsystem The Backbone cabling subsystem is based on cabling segments, which link such connection centers.
Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan.
System Online August 20, :54:07 CET 8 th Annual CEENet Network Technology Workshop.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
AutoDESA Presentation Project Documentation October 2005.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
SupraWEB Training Supra System & Product Overview SupraWEB Start Listing Tab Reports Tab Settings Tab.
Process Overview. Page 2 Agenda Problem Reporting and Escalation Procedure RMA Process Overview.
Revision Unit 1 – The Online World Online Services Online Documents Online Communication Cloud Computing The Internet Internet Infrastructure Internet.
September 30, 2008 Jim Van Dyke, Web:
Communications Technology Options Summit on Ohio College Campus Safety and Security August 1, 2007 Fawcett Center.
EMERGENCY NOTIFICATION SYSTEMS Presenter: Info Tech.
Presented by Ryan Garrison, Director of Technology Smart Schools Bond Act HUNT Engineers, Architects, Land Surveyors, P.C. Investment Plan Preliminary.
What is on the HIA Gateway? John Kemm Director, West Midlands PHO.
C21 World (UK) Consultancy Services for Telecom Industry DATA CENTERS
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Configure the intercom IP
CERN Mobile network migration
Welcome to the world of CRISIS COMMANDER
Ariba Contracts: Complete a Review Task
The Lone Star College System
Product Training Module
ISA Prime Developments
Hi and welcome to the Order Centre – Ordering training.
The E-Rate Program Eligible Services Fall 2011 Applicant Trainings.
Tracking Status Monitor System
DATA CENTERS C21 Engineering Consultancy Services for Telecom Industry
Internet Ad Serving Norman White 2013.
Registration Stand By Me
Presentation transcript:

UF Telecom Standards Overview ITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications & Network Infrastructure November 12, 2009

Road Map for Today Standards background Quick overview Highlights Next Steps

Background Current version dated May 2005 Used as a starting point for new construction design / major renovations Addresses physical infrastructure –Structured cabling systems –Information transport systems

Overview Sections cover major components: –Telecom Rooms –Backbone Cabling –Horizontal Cabling –Outside Plant –Labeling and documentation Appendix provide additional detail Tracked variance requests, industry trends and internal review

Highlights Access to all Telecom Spaces: –Card Access –Page 8

Highlights Entrance Facility / Main Telecommunications Room/ Telecom Room Backboard: –Use readyspec backboard –Page 8

Highlights Section 4.0 Telecom Room Size: –10’ X 12’ space –5’ X 14’ room with 2 sets of double doors –Stacked –Page 12

Highlights Section 6.0 Horizontal Pathways: –No “J hooks” for new construction –Use cable tray (conduit stubbed out to tray) –Renovations / existing – some times no choice

Highlights Section 7.0 WAO (Work Area Outlet): –Use to be 3 cables – 2 data one voice –Now – just 2 cables –Minimum – user needs may add more –Page 18

Highlights Section 8.0 Backbone cabling: –Intra-building fiber –Page 19

Highlights Section 9.0 Horizontal Cabling: –Reinforce telecom standards must be followed by other low voltage systems. –Page 22

Highlights Section 11.0 Deliverables: –Page 27

Highlights Section 17.0 Blue Light Phones -- NEW –New section –Use Talk-A-Phone products –Appendix – installation detail Section 18.0 Mass Notification System -- NEW –IP Paging via InformaCast –Indoor / Outdoor IP Speakers –Outdoor Loudspeakers

Next Steps Review and incorporate feedback from: –Network community –Facilities Planning & Construction –Consulting Engineers Send out and present to: –FP&C – overview meeting –PPD – overview meeting –Contractors

Contact Info John Madey University of Florida Computing & Networking Services Phone: