Short Review HERA Run 2002 / 2003 Luminosity Polarization Backgrounds Shutdown Activities Plans for Restart Report on HERA 64th Meeting of the DESY PRC.

Slides:



Advertisements
Similar presentations
1 Group 1 Meeting, Catania, Sept,16, 2002 STATUS REPORT ON DAFNE P. Raimondi for the DAFNE team.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
F.Willeke: HERA, 58th PRC Report from HERA 58 th Physics Research Committee Meeting at DESY October 28, 2004 F. Willeke, DESY Summary of the 2004 Proton.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Detector Backgrounds in the HERA ep-Colldider F. Willeke, BNL October 9, 2012.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
HERA Running 2005 F. Willeke, DESY 60 th Meeting of the DESY PRC November Luminosity Polarization Backgrounds Improvements Technical Issues.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Luminosity expectations for the first years of CLIC operation CTC MJ.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
HERA Status Joachim Keil, DESY (MPY) 59 th Meeting of the Physics Research Committee May 26 th, 2005.
D.Trines PRC Status of HERA and Strategy Time table of re-commissioning August 01 Re-commissioning of Proton ring September e-ring October Luminosity.
Polarization in ELIC Yaroslav Derbenev Center for Advanced Study of Accelerators Jefferson Laboratory EIC Collaboiration Meeting, January 10-12, 2010 Stony.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
P. Chevtsov for the ELIC Design Team
(on behalf of the DAFNE team)
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
HERA 54th Meeting of the PRC October at DESY
Future HERA High Luminosity Performance
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Other issues and concepts under study Conclusions References
LHC (SSC) Byung Yunn CASA.
Advanced Research Electron Accelerator Laboratory
Accelerator R&D Results from the B-factory
SLHC-PP kick-off meeting, CERN 9 April 2008
Institute of High Energy Physics Chinese Academy of Sciences
Commissioning Issues of BEPCII
Proposal for a CESR Damping Ring Test Facility
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
More on MEIC Beam Synchronization
Presentation transcript:

Short Review HERA Run 2002 / 2003 Luminosity Polarization Backgrounds Shutdown Activities Plans for Restart Report on HERA 64th Meeting of the DESY PRC May 7, 2003 F. Willeke, DESY

Short Review of HERA Run 2002/2003 January-March 2002Repairs, Collimator modifications, machine studies March 2002 Start up, machine studies, bakeout April 2002: Set-up of luminiosity, synchrotron radiation studies June-Sept. 2002Luminosity Run with low intensity (5d/w), machine studies, background studies (2d/w) Sept./Oct High Luminosity Studies, polarization Studies Nov Febr Luminosity Runs wih moderate intensity February 2003Machine Studies, high luminosity studies, polarization Tune-up

Operations Luminosity Efficiency in February 2003: 43% Luminosity operations in February 2003

D. Pitzl’s Plott of CJC2 Chamber currents contributions from ep gas events relative to values obtained in September 2002 Global trend follows the vacuum pressure, there is stagnation since December 2002

Accelerator Handling, Understanding, Modeling, Improvements Beam based alignment Orbit feedback Improved magnet cycling Online optics correction Improved background tuning algorithm On-line IR beam envelopes inside magnet aperture Working on proto emittance control Improved beam stability Improved beam handling More save operations Higher beam quality Larger luminosity

Beam Based Alignment

Improvement of accelerator lattice: on-line correction of beam envelope and phase beating

Online display of beam envelopes inside relative to limiting magnet apertures

Proton Logitudinal Stability Coupled Bunches 2p- Mode pattern Average Phase and Bunchlength Phase Ocsillation Monitor Coupled Bunches 4p- Mode pattern Finding: HERA p bunches lenghened by longitudinal bunch instability Cure: Bunch-to-bunch synchrotron frequency spread by RF amplitude modulation with f rev

High Luminosity 120 Bunches I p < 70 mA I e < 35 mA L peak <2.7 x cm -2 s Bunches I p < 70 mA I e < 35 mA L peak <2.7 x cm -2 s -1

Polarization 4 challenges HERA is operated now with three pairs of spin rotators. The solenoid fields are not locally compensated and the beam design trajectories are not perfectly parallel to the solenoid axis. The luminosity upgrade enhances the electromagnetic fields in collisions with the proton beam. The natural vertical positron emittance for a well compensated and spin tuned orbit does not match the proton vertical beam size. In order to avoid poor lifetime and transverse tails of the protons, the vertical positron emittance must be enlarged without affecting the polarization. 4 Steps Test Polarisation in 72o optics in old >IR in 2000 Repeat this test successfully in Oct 2002 with flat rotaotrs in South and North Turn all all three Rotators simultaneously and tune up polarization Collide polarized beam in North and South IR with protons 4 Measures Enhanced spin matching Enhanced harmonic bump scheme Improved closed orbit control Close to perfect optics

Shut Down Activities Survey straight sections in North and South rotators East, North, South, arc NE Vacuum e-beam pipe in GA-Magnet SL/NL 30m gets a NEG pump SR absorbers for RF-Finger in straigths coating of Absorber 4 SR, NR 11m with Cu-Mo movable collimator collimator ati 66m SL/NL Modification of RF screens at Pumping ports Absorbers 1 &2 NR, SR 3.5m, 6m New RF screens at rotator beam pipes beam pipes which replace HERA-B beam pipes new shutters at Insulation vacuum s GG/G install VPS with cold bypas p-Vacuumleck SR 28m Cold Magnets p Reconnect busses at VPS Stecker erneuen Diagnostics new e BPM system (electronics) partial replacement of p bpm electronic replace all fans for tunnel electronics Installation of OTR Monitors WL18m Wire measurment system repair work on electrical safety in tunnel electronics PS Installation of bipolare choppers for VO VG South & Nor repair some ground faults maintenance of dump switches Cooling Reduction of cooling water temperature GI/GJ NR, SR Improvement of QR cooling Improve water cooling of cavities Injection Improvement of fast e-injection kickers Superconducting Cavities Exchange RF Windows Repair of HV Isolation coupler shaft, p-HF New power tubes 208MHz Tuning of Feedbacksystems Troubleshooting Stoerlinien 52MHz e-HF Plunger exchange at several RF Stations Klystrons tuning Interlock New door contacts, new cabling Water rinterlock WR

NEG in –GA e-Chamber 7mm NEG Pump

Increase conductance of he pumping port Remove every second cross piece of the rf shield

Molybdenum coating of Absorber  m Mo, 10  m Cu 4 Absorber inserts available now But this is the critical path

Schedule Summer/Fall 2003 Start up with beams(3 days delay) July 14 Turn-on both Rings July Vacuum Conditioning operation August 1 -August GeV, frequent warm up GG/GO Polarization Studies September 1-14 High energy conditioning Set-up Luminosity Operation Sept Luminosity Operation for all experimentsOctober 1-Dec 15 Accelerator Studies Dec Maintenance days August 5, Sept 2, Oct. 7, Nov 4, Dec 2

Maximum Peak Luminosity I eb = 0.300mA (design) 0.600mA (2 x design) I pb = mA (Y2000 max) 1500 mA mA 2 A likely scenario Peak Luminosity Prospects 2003 Can’t get to maximum Luminosity with 180 bunches

Conclusions Backgrounds in Experiment widely, though not completely understood Operations poor due to ever changing conditions, accumulated luminosity far behind expectations Time was well used o polish up the accelerator, many improvements High luminosity demonstrated High polarazation with collisions demonstrated Improvement programme under way Plans for restart being finalized