Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

WAYNE DALTON OF SYRACUSE PRESENTS:
FIRE DOOR INSPECTIONS NFPA 80 STANDARDS THIS STANDARD REGULATES THE INSTALLATION AND MAINTENANCE OF ASSEMBLIES AND DEVICES USED TO PROTECT OPENINGS IN.
Lessons Learned An Architectural Perspective April 21, 2005 René Tercilla, AIA, REFP Tercilla Courtemanche Architects, Inc.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
ECE II Objective 2.01 Interpret licensing requirements for early childhood programs.
Certificate of Occupancy - Minimum Requirements
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Project Close Out CTC-470.
Building Codes Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the possible.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/training 1 Building Energy Codes An Introduction Department of Energy Energy Efficiency & Renewable.
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
COMPONENTS OF FLOORPLANS & ELEVATIONS Objective 6.05 & 6.06.
Planning Department – Building and Safety Adoption of the 2010 California Code of Regulations Presented By: Building and Safety & Fire Prevention.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Construction Specifications
FY Budget Presentation to Board of Finance March 17, 2014 Building Department Robert DeMarco, Chief Building Official.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
ESA Program Lead and Asbestos Safety Practices Presentation to the Low Income Oversight Board February 26, 2014 San Francisco, CA.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
The New Building Standards System Completion certificates.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
ID /02 Building Codes. Catalog Description This course will introduce students to the intent scope, detail, and examination of local, state, national,
ID 234 Building Codes Fall What are building codes, anyway? Various jurisdictions (local, regional, state, federal) – Laws – Regulations – Prescriptive.
Island County Planning and Community Development Permitting 101.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
The division of lands by legislative regulations, into areas or zones, which specify allowable land uses and size restrictions.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Fundamentals of Code Compliance AIA Connecticut Presented by.
Sprinkler Loads on Trusses Educational Presentation.
Permit Process & Application Guide
ACSR Report The 33rd ARCASIA October 29 ~ November 2, 2012 Bali, Indonesia Korea Institute of Registered Architects (KIRA)
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
CITY OF HARARE EMERGENCY SERVICES
CODE REVIEW: DOH Article 28 Compliance
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Construction Documents
DTF CONSTRUCTION MONITORING
Global Connections Day Building Safety Service Provider
Energy Code Program Manager – SPEER
Who is ICC? Private, Non-profit public benefit corporation:
Building inspections division
Fire Protection Survey Procedure
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Commercial Construction Projects
Partners in Building Safety
Starting a campground.

Presentation transcript:

Code Officials and the Code Process

 To design the interior of the building in conjunction with codes, standards and federal regulations required in the jurisdiction of the project your are designing.

 Guide you in the interpretation of the codes  Review drawings  Verify code compliance

 AHJ is a term used to indicate the entity that has the authority to decide whether the design and construction are compliant with the required codes and to enforce compliance.  Department  Individual

 The location of the building you are designing determines the code jurisdiction for each project.  The code jurisdiction can vary by state, but most are regulated on a local level such as a county or city municipality.  Some states mandate codes on a state wide level  Typically the state will at least enforce regulations on state-owned buildings.

 Because all jurisdictions are different, it is important to check with the jurisdiction of a project to determine which edition of the codes and standards are being enforced.  You should also confirm which jurisdiction governs your project.

 The code department or building department and  A code official or building official has the authority to administer, interpret and enforce the provisions of the adopted and/or amended code within a particular jurisdiction.

 Plans Examiner: checks the floor plans and construction drawings both in the preliminary stages and in the final permit review state of a project  Building Inspector: visits the project job site after a permit is issued to make sure that all construction complies with the codes a specified in the construction drawings  Fire Marshall: represents the local fire department and checks drawings in conjunction with the plans examiner during both the preliminary stages and the final permit plan review, checking for fire code and means of egress compliance.

 Local agencies develop and enforce their own regulations. Examples include:  Schools  Day care centers  Restaurants (health department)  Hospitals  Historical ordinances

 More complicated  Federal agencies enforce for their own federal buildings  Non-federal buildings have no clear enforcement procedure  In many cases, there is no review or enforcement process at the local level for the ADA guidelines

 Interior projects typically require stamped and sealed drawings by a licensed professional.  Licensed Architect  Licensed Engineer  Based on sq. footage and number of stories  5,000 sq. feet

 Code Research  Find out the jurisdiction (township, city, county or state)  Call or visit the local code department and ask them which codes and standards are enforced.  Determine which edition of the publication is used and if there are any local ordinances that will affect the project.  Determine all local ordinances as well as federal regulations that apply.

 Determine the drawings required to be submitted  Demolition plan  Partition plan  Reflected ceiling plan  Power and communication plans  Elevations, details, and schedules  Specifications document  Determine Occupancy Classification and research specific requirements.

 May require a formal or informal plan review (fax/ or formal meeting) with the code official  Occurs during the schematic design phase  Opportunity to get clarifications on code conflicts  Determine potential problems  Get approval in writing  Review of ADA is not typically done by local official. The DOJ must review projects which is a lengthy process

 Codes often have more than one interpretation  You many not always agree with the code officials interpretation  If you cannot agree on an interpretation you may have to make a formal request or appeal  Usually the owner or a representative of the owner  Both sides explain their interpretation of the code. You must explain how you specifically plan to comply with the code in order to get a variance.  The variance applies only to the specific situation at hand.

 Permits are required for interior projects that require construction such as:  New construction or addition  Alterations  Change in occupancy  A licensed contractor obtains the building permit  Separate permits are sometime obtained for plumbing, electrical and mechanical

 Construction documents are submitted for review  Can take up to several weeks for the plans examiner and fire marshal.  Upon approval, the code official will stamp or write “Approved” on the drawings.  One set must be kept at the job site at all times.  The permit must be clearly posted at the job site during construction.

 During construction, a code official must make several inspections of the job site to guarantee that the work continues to comply with the codes.  The contractor will notify the inspectors when it is time to make the inspection.

 Framing inspection: walls, ceiling and floors are inspected. Gypsum is only allowed on one side of framing.  Systems Inspection: Plumbing, mechanical and electrical, sprinklers. May be done at the same time as the framing inspection, before walls are closed in with Gypsum board.

 Gypsum Inspection: before any taping or plastering is done  Fire-resistant assemblies and penetration inspection: any walls, floors, ceilings, and shaft enclosures, will be checked again to verify that joints and sealing meet fire codes.  Energy efficiency inspection: insulation of mechanical ducts and water heating equipment, HVAC system are inspected for compliance with energy standards.  Final Inspection: once the project is complete, a final walk-through will confirm compliance with all codes to make sure the space is ready to be occupied. A fire marshal may also complete an inspection.

 Designers often provide what is known as operation and maintenance (O & M) manuals that explain how to use and maintain each system or material.  On large projects, a set of “as-built” drawings may be provided.

 Upon successful completion of the final inspection, the code official must issue a certificate before utilities are allowed to be connected and occupants can occupy the space.  Certificate of Completion: allows utilities to be connected, but not to occupy the building  Certificate of Occupancy (C of O) Contractor will request and must be posted in a conspicuous location.  Temporary Certificate of Occupancy  Phased Certificate of Occupancy