1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.

Slides:



Advertisements
Similar presentations
Adding Gears to the NXT Taskbot
Advertisements

Analysis of Metrology Data Stephen Pate 8/16/111.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
TIPP Conference, June 10, Mechanics and Assembly of the Silicon Vertex Detector for PHENIX Walter Sondheim - LANL Mechanical Project Engineer; VTX.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
ENGR 6806 – Motor Control Prepared By: Rob Collett September 15, Office: EN2074.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
High Density Interconnect (WBS 1.4.3) Extension Cables (WBS 1.4.4) Douglas Fields University of New Mexico Douglas Fields, FVTX DOE Review November 17,
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
Analysis of Metrology Data from First Two Small Disks Stephen Pate 5/11/111.
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Douglas Fields, fVTX HDI Technical Review October 23, 2009 High Density Interconnect WBS Douglas Fields University of New Mexico 1.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
LARP Collaboration Meeting Racetrack Coil Fabrication
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Installation of the T600 at Fermilab CSN2, September 22,
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Berkeley status Aug 10th, 2012.
7th Belle II VXD Workshop, Prague
Open Issues Modification of Cactus Arm bending tool required
Vertex Detector Mechanical R&D Design Questions and Issues
Radiation Laboratory Meeting
Presentation transcript:

1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010

2 Talk Outline Final Wedge Preparation at BNL Assemble Wedges onto Cooling Plates (Disks) Disk Metrology Assemble Disks into Cages Cage Metrology Schedule People

Stephen Pate, NMSU – FVTX Review – 17-Nov Final Wedge Preparation at BNL Select a destination for each wedge Bend the HDI Attach Thermal Pedestals Prevent “faulty injection line 1” problem Connect backplane to wedge ground Remove HDI tab A number to remember: 2 x 2 x 4 x 24 = 384 wedges

Stephen Pate, NMSU – FVTX Review – 17-Nov Select a destination for each wedge Many subsequent steps (HDI bending, thermal mounts, etc.) depend on the final location of the wedge in the detector. Travelers, spreadsheets, and the database are used to track this – make unique assignments and make sure that all wedge positions are filled.

Stephen Pate, NMSU – FVTX Review – 17-Nov Bend the HDI System developed and built at UNM. Now in use at BNL. Wedge is placed in precise position in frame. Neck of the HDI is bent in a form and heated to 100C for a few minutes.

Stephen Pate, NMSU – FVTX Review – 17-Nov Attach Thermal Pedestals Arclad used as fixative. Vacuum fixture designed and built at UNM; now installed at BNL and in use. pedestals

Stephen Pate, NMSU – FVTX Review – 17-Nov Prevent “faulty injection line 1” problem Several small wedges turned up with a faulty trace on the bottom layer of the HDI. (See details in David Winter’s wedge assembly talk.) This fault turned up only after handling. Dyconex have an (ex post facto) explanation for this and believe the (new) large HDIs should not develop this problem. On small wedges, connect a wire from pin P1-9 to the capacitor on side1.

Stephen Pate, NMSU – FVTX Review – 17-Nov Connect backplane to wedge ground Bulk material of backplane is conductive carbon fiber; needs to be in common ground with analog and digital grounds of wedge. Solder wire to bias ground tab. Connect wire into pre- made hole in backplane with conductive epoxy.

Stephen Pate, NMSU – FVTX Review – 17-Nov Remove HDI tab This tab is needed for many assembly processes prior, but must be sliced off before wedge is placed on the cooling plate.

Stephen Pate, NMSU – FVTX Review – 17-Nov Assemble Wedges onto Cooling Plates Use Disk Assembly Fixture to manipulate the cooling plates Apply thermal grease to plate faces and to bottom of thermal pedestals Attach wedges to cooling plates with torque- limiting screwdriver Test wedges; treat disk as a system 384 wedges distributed over 16 cooling plates

Stephen Pate, NMSU – FVTX Review – 17-Nov Disk Assembly Fixture Permits safe handling, orientation and storage of disk for: wedge and cable attachment; electronic testing; metrology; and transportation to cage.

Stephen Pate, NMSU – FVTX Review – 17-Nov Thermal grease Standard Aavid product used to ensure good thermal conduction between thermal pedestal and cooling plate. HDI Backplane Arclad Pedestal Aavid Cooling plate

Stephen Pate, NMSU – FVTX Review – 17-Nov Attach wedges to cooling plates Two small wedges fitted to a small cooling plate, in test fit at LBNL.

Stephen Pate, NMSU – FVTX Review – 17-Nov Test wedges; treat disk as a system Concern: digital cross-talk and noise due to interactions between neighboring wedges Method: send clocks to as many wedges on a disk as possible, and read out selected wedges; look for changes as a function of turning on/off other wedges; can test validity of grounding assumptions

Stephen Pate, NMSU – FVTX Review – 17-Nov Disk Metrology Goal is to locate the 24 sensors (and their many strips) on a disk to within 10 microns in x and y Hexagon Metrology (R.I.) has suitable 5-axis CMM with switchable stylus and camera capabilities; 5 micron resolution Stylus will locate three survey monuments on perimeter of the disk – establish coordinate system Camera will locate reference marks on sensors; both sides of disk will be done at once

Stephen Pate, NMSU – FVTX Review – 17-Nov Assemble Disks into Cages Attach bias & signal cables to wedges Attach thermocouples and cooling lines to the disk Place Disk in Cage Electronic Tests of Disks in Cage 16 disks placed into a total of 4 cages

Stephen Pate, NMSU – FVTX Review – 17-Nov Attach bias & signal cables to wedges Bias and signal cables are held in place by hoop (and string) in preparation for placement in the cage and attachment to the ROCs.

Stephen Pate, NMSU – FVTX Review – 17-Nov Attach thermocouples and cooling lines Cooling lines and thermocouple wires will need to be fed through the openings in the cage (see blue cooling lines in the figure, for example), so must be attached to disks before placement in cage. Thermocouples are attached near cooling inlet and outlet points on each disk.

Stephen Pate, NMSU – FVTX Review – 17-Nov Place Disk in Cage 1.Attach carrier to disk 2.Lift disk up 3.Place disk in cage 1 2 3

Stephen Pate, NMSU – FVTX Review – 17-Nov Electronic Tests of Disks in Cage Similar concern as with disks: digital cross-talk and noise due to interactions between neighboring wedges Similar method: send clocks to as many wedges in a cage as possible, and read out selected wedges; look for changes as a function of turning on/off other wedges; can test validity of grounding assumptions For testing of a cage, realistic power supplies and cooling must be employed due to the large number of wedges involved.

Stephen Pate, NMSU – FVTX Review – 17-Nov Cage Metrology Disks have survey monuments; same ones used in disk metrology Cage has survey monuments too BNL has brand new 5-axis CMM with stylus capability Locate disks in cage to high precision This capability did not exist at the beginning of the project, so the precision now available for this step far exceeds what we had in mind earlier (theodolite survey).

Stephen Pate, NMSU – FVTX Review – 17-Nov Schedule Detailed schedule of detector assembly sub-tasks has been developed based on a few assumptions –Time for bending, testing, attaching wires and thermal mounts for 24 wedges is 2 weeks; this becomes 1 week later in the schedule –Time for assembling and testing a disk is 2 weeks; this becomes 1 week later in the schedule –Time for assembling and testing the first cage is 4 weeks; 3 weeks for next three cages –Have enough people so that some tasks can be in parallel to each other (bending || attaching || disk assembly) –As we presently only have one disk test stand at BNL, the schedule assumes disks are assembled and tested in series; a 2 nd disk test stand can be provided along with more people as well –Cages are assembled and tested in parallel with disks; assumes creation of test stand at BNL for cages (to be done)

Stephen Pate, NMSU – FVTX Review – 17-Nov Schedule

Stephen Pate, NMSU – FVTX Review – 17-Nov People Onsite (now) Christine Aidala (LANL fellow); Jeongsu Bok (UNM student); Robert Pak (BNL); Elaine Tennant (NMSU student); Michal Tomasek (IPAS Prague); Feng Wei (NMSU postdoc) Onsite (soon) James Bowen (ISU student); Abraham Meles (NMSU student); Jiri Popule (IPAS Prague) Onsite (in the works) another postdoc, another student Will cycle in and out: various senior persons from Columbia, LANL, NMSU, & UNM. Effort fully supported by BNL PHENIX Technical Staff.

Stephen Pate, NMSU – FVTX Review – 17-Nov Summary Start of detector assembly greatly delayed by HDI production – but now we have started! Schedule of tasks understood and planned. Team in place onsite to push detector assembly forward. First disk to be assembled in November 2010; last cage finished in June 2011.