1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

NOTICE SUBMISSIONS Requirements and Procedures 1.
Facilities Management and Design Chapter 4 Safety and Security systems.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.
ACMA Conference February 8, 2007 Evaluating Investments in Infrastructure Panel Overview of Public Infrastructure Financing in the City of Phoenix.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
FY CAPITAL IMPROVEMENTS PROGRAM & FY CAPITAL NEEDS ASSESSMENT Planning Commission Meeting January 19, 2010.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Presented by Executive Director of Facilities Management Chuck Scott.
Facility Management. The International Facility Management Association defines facility management as a profession that encompasses multiple disciplines.
BAYSIDE UNIVERSITY OF MASSACHUSETTS BOSTON MAIN CAMPUS UNIVERSITY OF MASSACHUSETTS BOSTON 1 Administration & Finance Facilities Department FY13 Budget.
FY2016 Proposed Budget March 17, Fiscal Year 2016 Proposed General Fund Budget $133.4 million No Tax Rate Increase Proposed Current Rate:
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Welcome Co-Owners Our Agenda for This Evening General Review of 2004 & 2005 to dateGeneral Review of 2004 & 2005 to date What “Your Board” has accomplished…
DEPARTMENT OF PUBLIC SAFETY PARKING SERVICES STUDENT FEE USAGE UPDATE OCTOBER 2014.
Court Facilities Funding Public Hearing August 25, 2009.
Sinking Fund Millage Renewal Election- May 7, 2013.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Science Complex Renovation Science, SR I, and Fleming Board of Regents Administration & Strategic Planning Committee April 28, 2008.
Capital Improvement Program for September 9, 2014.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
San Francisco Police Department FY Budget Chief Gregory P. Suhr 1.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
FACILITIES SERVICES NEW EMPLOYEE ORIENTATION. FUNCTION OF FACILITIES SERVICES  Facilities Services has 55 full time employees who are responsible for.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
2017 Public Works Budget September 6, 2016 Donald J. Theisen, P.E. Director.
City of Gainesville Facilities Management Department Citizen’s Academy April, 2016.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Madison Elementary School District
North Penn School District
Capital Improvement & School Construction Bond
Capital Projects Requests
Cornwall Central School District
Fall 2017 Update: Physical properties and sinking fund
Joint Schools Construction Board Phase II
Dr. Joseph Meloche Superintendent of Schools Mrs
TOWN OF CHESTER PROPOSED BUDGET
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
John Wood John Reed Mark Purple (Town Admin)
2018 ING Chicago.
The Asset Management Journey for Building Assets
Carleton College Facilities Management
Master Facilities Committee Evaluation and Identification
Stoughton Public Library
Presentation transcript:

1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department

2 Capital Strategic Objective  Maintain and initiate improvements to existing facilities to ensure the safety and security of MPD employees  Fund technology and capital equipment projects that allows MPD to provide neighborhood police presence, prevent crime, apprehend criminals, and investigate criminal activity in the City of Milwaukee

3 Capital Funding  2009 Budget $6.7 million $1.1 million expended $4.8 million encumbered $800,000 available for evidence storage and PAB electrical substation  2010 budget $4.2 million  2011 REQUEST $7.3 million

4 2009/10 Accomplishments  5 th District Station HVAC upgrade  NTF renovation, parking lot expansion  Evidence Storage Warehouse upgrade 4 th floor HVAC, fire alarms, chiller  911 System Replacement 911 System, Call Recording System, telephones, voice mail all integrated

5 2009/10 Accomplishments  PAB cooling tower replaced  PAB electrical substation upgraded  PAB COMP STAT Room completed  PAB Space Utilization Study/Master Building Plan completed

Capital Projects:Early Stages  PAB Jail Cell Door Replacement  Automated Fingerprint Identification System  4 th District Station HVAC replacement  PAB Mechanical Shafts Liners failing and nearing capacity  PAB Domestic Water Pump Replacement 40 y/o – obsolete equipment; repair and parts difficult At capacity limits  PAB Lower Garage Floor Restoration

Capital Budget Request  Evidence Warehouse $593,000 Movable shelving – Homicide floor Security system – proximity readers Automated elevator controls Fire suppression system

Capital Budget Request PAB fire pump replacement $85,000

Capital Budget Request D #2 Replace Emergency Generator $100,000

Capital Budget Request Radio Shop HVAC Replacement $200,000

Capital Budget Request  Tiburon RMS VMP Upgrade $354,000  Major Capital Equipment Front-end Loader (for snow removal) $70,000

12 PAB Rehab/Code Compliance Project Be A ForceMilwaukee Police Department

13 PAB Rehab/Code Compliance Project  Building’s HVAC infrastructure is obsolete and parts are hard to find/replace Piping/plumbing system is failing  PAB does not meet hi-rise code compliance No fire sprinklers or code-compliant alarm system Stairwells too close together; code compliance requires pressurization Replacement of fire pump recommended Code compliant generator required for life-safety systems  Electrical systems need upgrading  Hazardous materials (asbestos) exists in ceilings and walls  Building “envelope” deteriorating – thermal value is poor (wasted energy-steam and electricity), windows are inefficient

14 PAB Rehab/Code Compliance Project Any renovations to PAB require asbestos abatement and fire code compliance for high-rises Abatement alone: $2.9M in 2012 $3.1M in 2013 $3.3M in 2014 Window replacement approx. $150,000/floor Fire sprinklers ONLY approx. $92,000/floor  Average per floor rehab cost is $4.5M Approximately $240/sq foot

Capital Budget Request  PAB Renovation $5.9 million Mechanical/HVAC shaft replacement net of $2.3M in 2010 budget And significant hi-rise upgrades to bring PAB up to code compliance Architectural and engineering fees to begin the re-hab work starting at Level 5

16 PAB Rehab/Code Compliance Project Estimates YearExpenditure 2010$0.4M (approved) 2011$5.9M 2012$14.7M 2013$12.9M 2014$10.4M 2015$2.5M TOTAL$46.7M