Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.

Slides:



Advertisements
Similar presentations
Completing the EU internal energy market IFIEC, 22 November 2011
Advertisements

The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Completing the EU internal energy market
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Towards Regional Independent Operators – a main driver for successful market integration.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
EU 3 rd Energy Package in the context of the tax problems of cross-border energy supplies REPORTER: KUROCHKIN DENIS ALEKSEEVICH EURASIAN RESEARCH CENTRE.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
East Asia and the Pacific Region
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
2006 APEX Conference Seoul, October 31, 2006 SESSION 4: Experiences in how to deal with market stress situations. José Javier González Market Operations.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Ricardo CARDOSO DE ANDRADE, DG COMP B-1 6 September 2006 Competition Directorate-General Energy Sector Inquiry – findings and the way forward Presentation.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
Electricity Infrastructure Workshop Brussels, 13 February 2007 The framework for a Single European Electricity Market Mrs Asta Sihvonen-Punkka, CEER EWG.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE Challenges in transitioning to a liberalised, competitive market – Romanian experience.
Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
1 GIE Annual Conference Madrid, November 2007 Investing in Europe‘s Future – the Role of Regulators David Halldearn Senior Adviser, European Affairs.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas Third Package Progress GIE conference
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
1 The Regulatory Authority for electricity and gas: an overview of the legislation The Regulatory Authority for electricity and gas: an overview of the.
Energy Agency of the Republic of Serbia
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Update on electricity market Baltic Mini Forum 1 October, 2010.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
1 SPANISH HUB DEVELOPMENT 17 th IG meeting 2 nd November 2011.
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
The Energy Package:– The New Regulatory Framework for Europe International Energy Conference, 12 March 2008 David Halldearn Senior Advisor European Affairs.
Directorate General for Energy and Transport Unbundling DG TREN C-2 European Commission DG Energy and Transport Belgrade, Seminar on Gas Industry Restructuring.
CESEC Energy Community Project Monitoring
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
1 This project is supported by the European Union 3 rd MEDREG-IMME Seminar Reform and Opening of Maghreb Electricity Markets September 2013 MRA (Malta)
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – ENERGY Bilateral screening: Chapter.
1 ERFA Annual Event Brussels, Welcome. Irmtraut Tonndorf ERFA Chair.
The 3rd package for the internal energy market
FlorenceForum November 2008
Gas Transmission Europe
Background and Process
ERGEG GRI South South East – , Maribor
STATE ENERGY AND WATER REGULATORY COMMISSION
Achieving the Internal Gas Market The view of gas suppliers
International Conference
Powering Towards Clean Energy in Europe
Incentives for electricity infrastructure – ERGEG view
Meinhard Janssen GIE Board Member
The Treaty of Lisbon and Administrative Cooperation
Outline Background: development of the Commission’s position
Presentation transcript:

Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the European Union Lars Hollner European Commission APEX annual conference 2005

Directorate General for Energy and Transport Development in time l 1996 and 1998: 1st Internal Market Directives on gas (98/30/EC) and electricity (96/92/EC) l Directives effective in Member States as from 1998 and 2000 l Deficits and shortcomings resulted in 2nd package Directive 2003/54/EC and 2003/55/EC adopted in November 2003 l Effective as from 1 July 2004 l However, lack of timely transposition in national law l CommissionProgress Report this month

Directorate General for Energy and Transport The European approach l Creation of one internal market for energy rather than 25 liberalised, but separated national markets l Principle of subsidiarity l Approach based on Directives, that means: Mandatory with respect to objectives, but free with respect to the means to achieve the objectives

Directorate General for Energy and Transport Summary of New Directives l Full market opening timetable l Legal and functional unbundling of networks l Regulated Access to Networks with published tariffs and methodology approved in advance by regulators l Deadline July 2004 for most provisions l Deadline July 2007 for full market opening and DSO unbundling

Directorate General for Energy and Transport Role of regulators l Regulator is in charge of - network access tariff methodology: Art. 23(2)(a) - balancing methodology: Art 23(2)(b) - cross border capacity allocation: Regulation Art 9 - regulators must have access to information (e.g. accounts of system operators) - regulators must have some form of sanction against companies to ensure compliance

Directorate General for Energy and Transport Separation of network operators l Unbundling - Legal unbundling of TSO from July 2004, - Additional measures to ensure independent acting - Management may not participate in other activities of the integrated undertaking - No conflict of interest - Compliance programme - Legal unbundling of DSO not later than July 2007, but management unbundling applies from 2004 onwards

Directorate General for Energy and Transport Market Opening l Market Opening - deadline for non-households July deadline for all customers July Generation market open since 1999 (first Directive). Anybody can build generation capacity; e.g. large users, CHP producers.

Directorate General for Energy and Transport Role of European Commission l Propose EU legislation, for adoption by Council and Parliament l Monitor and enforce compliance with EU rules l Adopt implementing measures in a limited number of issues related to cross-border transmission – regulatory decisions at EU level. l Apply EU competition rules to the energy sector

Directorate General for Energy and Transport Role of Member States l Implement effectively EU framework rules at the national basis l Take all necessary measures to make the market work in practice l Ensure that regulatory authorities have the necessary powers and means (budget, staff) to effectively play their role

Directorate General for Energy and Transport Role of regulators l Co-operation of national regulators important – national regulatory decisions impact on EU market l Commission set up advisory group of energy regulators, to promote co- operation and encourage harmonised approaches to regulation

Directorate General for Energy and Transport Role of power exchanges l Number of power exchanges has increased over time. l At the moment 11 power exchanges exist in the EU electricity market l Liquidity in most power exchanges is still limited but increasing l Power exchanges play an important role in ensuring transparency in the market and facilitating integration of national markets into regional markets l Need to re-enforce oversight on power exchanges to exclude anti-competitive practices?

Directorate General for Energy and Transport The EU electricity market – remaing deficits l Late transposition of new directives – not yet fully effective l Lack of integration of national markets – no price convergence, largely due to insufficient infrastructure l Market structure: dominant positions of incumbents in many national markets

Directorate General for Energy and Transport The EU electricity market – remaing deficits l Effectiveness of regulators appears to differ between Member States l Unbundling of network business not yet satisfactory in practice, despite a growing trend towards ownership separation at TSO level l Customers response still underdeveloped

Directorate General for Energy and Transport Summary l EU Energy Law is reaching a state of maturity after a long period of development l Main measures are in place for a competitive sector but they need to be effectively implemented at national level l Further integration of national markets is key – power exchanges play an important in this respect