Final Infrastructure Interdependencies Research Approach Dana Brechwald, Earthquake and Hazards Specialist Lifeline Committee Meeting October 25, 2012.

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

Infrastructure Interdependencies Research Update Dana Brechwald, Earthquake and Hazards Specialist Lifeline Committee Meeting January 31, 2013.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
INSPIRE and flood directive reporting: important issues to raise Manuela Pfeiffer WISE GIS/IT-Workshop 7.5./ Copenhagen.
Infrastructure Interdependencies Research Approach
Environmental Impact Assessment
ASSESSMENT IN HIAs Elizabeth J. Fuller, DrPH, MSPH Georgia Health Policy Center.
Integrating Community Planning and Hazard Mitigation Planning Amanda Engstfeld FEMA Region X
Conference Report – part 1.  Total number of selected abstracts – 19  Total Number Presented – 6.
1 Preparing Washington for a Changing Climate An Integrated Climate Change Response Strategy Department of Ecology Hedia Adelsman, Executive Policy Advisor.
Session 131 Hazard Mapping and Modeling Supporting Emergency Response Operations using GIS and Modeling.
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
The National Climate Assessment: Overview Glynis C. Lough, Ph.D. National Climate Assessment US Global Change Research Program National Coordination Office.
 New Zealand Earthquake New Zealand Earthquake  6.3 Magnitude Earthquake  185 Deaths  injuries  Over 1,400 buildings were red or yellow tagged.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Future Bay Area Earthquakes – Water & Sewer Issues JEANNE PERKINS ABAG Earthquake and Hazards Program Consultant.
Southern Nevada Strong Consortium Committee Meeting April 18, 2013.
The Process of Conducting a Post Disaster Needs Assessment (PDNA) United Nations Development Programme Bureau for Crisis Prevention and Recovery Bangkok,
Incident Response Mechanism for Chemical Facilities By Stephen Fortier and Greg Shaw George Washington University, Institute for Crisis, Disaster and Risk.
1 Beyond California Water Plan Update 2005 California Water and Environmental Modeling Forum Annual Meeting, March 3 rd, 2005.
Earthquake Loss Estimation
Dam Hazard Consequences Assessment
Business Analysis and Essential Competencies
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
1 Emergency Management and Risk Analysis for Hazardous Materials Transport Shashi Nambisan Professor of Civil Engineering Dept of Civil & Environmental.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
BUILDING RESILIENT COMMUNITIES Dr. Barbara Carby The Cayman Islands LEADERS 2006, Jamaica.
Earthquake Vulnerability and Exposure Analysis Session 2 Mr. James Daniell Risk Analysis Earthquake Risk Analysis 1.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
U.S. Department of Transportation Federal Highway Administration 1 Critical Transportation Assets, and Sensitivity to Climate Change Gulf Coast Study,
Bay Area Earthquake Impacts and Earthquake Impacts on Utilities and Transportation Systems Infrastructure Interdependencies Workshop I – Utilities and.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Health Impact Assessment for Healthy Places: A Guide for Planning and Public Health Module 3: Scoping Goal: The goal of scoping is to identify issues that.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
2006 Socio-economic component CUMBERLAND RESOURCES LTD.  Baseline  Impact Assessment  Mitigation and Benefit Enhancement  Monitoring  Intervener Comments.
Bay Area Earthquakes – Utility & Lifeline Issues Bay Area Earthquakes – Utility & Lifeline Issues JEANNE PERKINS Consultant, ABAG Earthquake and Hazards.
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Challenges of Urban Test Beds Charge to the Joint Action Group for Joint.
Connecticut Department of Energy and Environmental Protection.
UK Foresight Programme - Overview ASSOCHAM Conference: “Calamities: Nature or Human Action? Challenges and Responsibilities”. 5 March 2014, New Delhi.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated planning and Assessment of National Development Plan of the Czech Republic.
Click to edit Master subtitle style 6/8/12 Adaptation Research Flagship of the WPCC Parliamentary Portfolio Committee June 6, 2012.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Chittenden County Climate Action Planning CCRPC Board Presentation February 15, 2012 Julie Potter, Senior Planner.
The Canadian Approach To Compiling Emission Projections Marc Deslauriers Environment Canada Pollution Data Division Science and Technology Branch Projections.
Safeguarding California: Implementation Action Plans Listening Tour October 2015.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
Key Words in disaster Management Dhammika Mahendre.
THE FOUR PHASES OF EMERGENCY MANAGEMENT. GIS and Preparedness The process of identifying potential emergency management problems that a community may.
Gaps to Caps project Why we need a discussion on capability and scenario analysis and why task group C and task group D need to work together when it comes.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
Adaptive Integrated Framework (AIF): a new methodology for managing impacts of multiple stressors in coastal ecosystems A bit more on AIF, project components.
Session 7 Crisis and Risk Communication Session 7 Slide Deck Slide 7-1.
One Water LA is a collaborative approach to develop an integrated framework for managing the City’s watersheds, water resources, and water facilities in.
How Katrina Impacted the Corps, and Implications for Those Living Near Water1 Slide1 Examples in Quantifying Flood Risk Presentation to National Flood.
Deerin Babb-Brott, Director National Ocean Council Office National Boating Federation 2013 Annual Meeting.
NHS England Emergency Preparedness, Resilience and Response (EPRR) Business Continuity exercise Services and suppliers
Multi-Jurisdictional Local Hazard Mitigation Plan City of Union City A SSOCIATION OF B AY A REA G OVERNMENTS.
Draft EU Risk Assessment and Mapping Guidelines for Disaster Management 8th Meeting of Working Group F on Floods October 2010 Commission ECHO.C4.
G IOVANNA G IUFFRE ’, ISIS - S CENARIO BUILDING AND OUTLOOK OF THE PROJECT FRESHER WORKSHOP LISBON, 26 O CTOBER 2015.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Climate Adaption and Resiliency
HIRA This is the lesson objective.
Societal resilience analysis
An Original Model of Infrastructure System Resilience
HIRA This is the lesson objective.
Investing in Source Water Protection
The Foundation of Capability:
Duluth Comp Plan Stakeholder Meeting.
Presentation transcript:

Final Infrastructure Interdependencies Research Approach Dana Brechwald, Earthquake and Hazards Specialist Lifeline Committee Meeting October 25, 2012

Review of Comments √The goal of the project should not just be to understand if infrastructure systems are adequate, but to make judgments and recommendations based on our findings. √The report should be useable to take back to airport managers to use to take action to improve the performance of airports in recovery. √Vendor services/supply chains should be added to the proposed scope, as well as employees and people. √We should be explicit that our scope only covers land transportation. √We should consider whether the scope of the project includes air traffic control facilities as well as airports. √Jeanne Perkins has plans to update case studies from 2000’s Don’t Wing It report as well as research new case studies. We should coordinate case studies for this study with her. √We should consider multiple earthquake scenarios within our research.  We need to consider the burden we place on providers in answering our study questions and balance that with our desire for a complete and thorough report, so we should be very explicit about what information we are after prior to speaking with providers. It may be helpful to ask providers what earthquake scenarios they have already looked at.

Describing Characteristics of Interdependent Failures (Chang et al 2006) What is the initiating event? What is the spatial extent? What is the duration of the failure? What are the impacted systems and subsystems? Is the interdependency expected (linear) or unplanned/unexpected (complex)? Is there feedback from the secondary system back to the initial system? What was the operational state of the system before it failed? What is the adaptive capacity of the system(s)? What is the restoration time?

Characteristics of Interdependencies Consequences (Chang et al 2006) What is the severity of the consequence? What type of consequence is it? Economic, public health and safety, social, environmental, etc What is the spatial extent of the consequence? How many people are impacted? What is the duration of the consequences?

Objectives for Our Study Goal: Understand performance of infrastructure systems serving airports to better understand performance of airports and to make actionable recommendations to improve airport performance Objectives –Identify interdependencies –Qualify interdependencies –Understand vulnerabilities due to interdependencies –Find “choke points” –Find redundancies and “islands” –Project consequences –Identify and prioritize key mitigation strategies –Facilitate conversation among key stakeholders –Better understand how consequences will affect restoration and recovery –Make specific actionable recommendations

Scope of Our Study Systems –Power –Water and Wastewater –Communications –Transportation (land transportation only) –Jet Fuel –Supply Chain –Employees/People –Air Traffic Control Size –Region – high level –Airport-specific – more detail

Case Studies Don’t Wing It updated + new case studies –1989 Loma Prieta Earthquake –1994 Northridge Earthquake –2001 Seattle Earthquake –2005 Hurricane Katrina –2010 Haiti Earthquake –2011 Christchurch Earthquake –2011 Japan

Qualitative Approaches Rely on empirical observation, expert interviews Typically use a damage scenario Examine whole systems, not just nodes Look at multi-sectoral societal impacts Wide variety of outputs

Our Approach Select Scenario Solicit input from providers – what scenarios have they already used? Examine Case Studies Glean information about dependencies in past events Conduct Mapping High-level GIS mapping of infrastructure and airports Questions and Interviews Craft questions as a group Identify interviewees Conduct interviews Synthesize Data Confirm and Report

PowerTransportationWaterWastewaterCommunications Power x Transportation x Water x Wastewater x Communications x

Preliminary Hierarchy – High Level Local and Regional RoadsElectricity and GasWaterWastewaterCommunications

Preliminary Hierarchy – Detail People/EmployeesAir Traffic ControlSupply ChainJet Fuel

Anticipated Products

Next Steps Write Implementation Plan - 1/31/13 Begin to develop scenario – Jan 2013 Study will run Jan 2012 – June 2014