AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.

Slides:



Advertisements
Similar presentations
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Advertisements

SADC HPC Workshop, 2 Dec 2013, Cape Town
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jan Geralt Bij de Vaate DS4-T4 Wideband Integrated Antennas DS4-T4 Jan Geralt Bij de Vaate ASTRON.
Conference Title L. Stringhetti, IASF Milano, ASTRI Meeting #9, Bologna 24 Feb Status of the ASTRI/CTA project and organization/management issues.
Update on the SKA R. T. Schilizzi AA 13 December 2011.
Update on the SKA R. T. Schilizzi East-Asia SKA Workshop 30 November 2011.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
System designAA Consortium - BolognaOctober 2012 AA Consortium AA System configuration options 23 October 2012.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 Summary, Conclusions and Actions Marco de Vos
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
AA-mid demonstrator Dion Kant AAVP – 10 December 2010, Cambridge, UK.
AAVP meeting Cambridge December 2010 Technology Trade –offs: Mid band Array and Elements Prof. A. K. Brown 1 1 School of Electrical and Electronic Engineering.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
AA-mid Strategy to proceed to SRR & next steps AuthorAndrew Faulkner AA dCoDR: 23 November 2011.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
SKA DRAO SKA success dependent on technology development –major improvements in price/performance Survey Speed -> (A eff / T sys ) 2 x Field of View.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Peter Wilkinson SKADS Workshop: Paris 10 October nd SKADS Workshop: Introduction “What is it about?” Peter Wilkinson University of Manchester.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report.
AAVS 0.5: An Overview Peter Hall ICRAR/Curtin, Bologna, October 22, 2012.
AAMID 2015 SKA Engineering Meeting Mid Frequency Aperture Array MID-FREQUENCY APERTURE ARRAY The AAMID consortium: Mid Frequency Aperture Array Wim van.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
Federal Acquisition Service ETS2 Transition Planning Meeting # 19 ETS2 Transition Planning Meeting # 19 January 25, 2012.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) SKA AA-Mid Progress Meeting Johan.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
Dish Consortium Status in SKA1 Preconstruction
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
AAVP 2011 – Wrap-up Dr. Marco de Vos – ASTRON Managing Director
Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.
Instrument Control Systems Seminar, 20 October 2014 Instrument Development Process Hans Dekker.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Camera PDR/CD1 Planning 19 September 2008
Mid Frequency Aperture Arrays
ASTERICS Kick-Off Meeting: SKA links and interaction
PM view of SAFe SAFe Construction Planning Workshop A J Casson
Aberdeen proving ground advanced planning briefing to industry
DIISR and the Pre-construction Phase October 2011
TSF Upgrade Project Overview Resources Plans and Timetable
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
A Draft Funding Model for the SKA
Information Session October 13, 2016
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Drafting Group: Final Meeting Drafting Group: 1st Meeting
CoDR Scope Definition, Objectives & Agenda Jodrell Bank
Presentation transcript:

AAs in PEP Jan Geralt Bij de Vaate

PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction AA-mid part of the Advanced Instrumentation Program (AIP)

Allocation of Requirements from System to Element level Pre-Stage 1 System RR Element SRR 1 st allocation is science requirements, operations requirements (Instrument Requirements Review). Later allocations are extensibility requirements and non-functional requirements. System Level (SPDO/SPO) Element Level (WPCs) 1 2

Assembling Element Level RFPs for Stage 1 Work SoW Pre-Stage 1 Planning Element 1 CoDR-SRR Work Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work RFP Bid Define Top-level WBS Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Stage 1 Element MoAs Nov/11 Apr/12 Assemble Work Package Consortia review Jun/12

AA SoW writing team

AA SoW Draft WBS created SoW writing started Full draft by mid Jan.

AA Consortium AA-mid receptor AA-mid receptor System Engineering WP Mgt AA-low AA Consortium board

AA Consortium AA-mid receptor AA-mid receptor System Engineering WP Mgt AA-low Signal processing Verification systems Infrastructure System Design Front-end array

pre Consortium INAF Oxford University Manchester University Cambridge University Obs Paris (Nancay) / Univ. of Bordeaux ICRAR Raman Research Institute ASTRON –Aperture Array Design and Construction Consortium: AADC 2..?

Consortium Work package Consortium Industry Participating Orgs Work package Consortium Industry Participating Org Industry Participating Org Stage 1 ? Stage 2 ? -IP issues -Funding/budgets

Pre Consortium Telecons and meeting in Perth (Aug/Sept 2011) This Friday focus on AA-mid Meeting in Manchester during/after the SPO gathering –Second half of 30 th Jan- 3 rd Feb week Letter of Intend proposal drafted Composing the bid on AA work package April/May 2012 Start 1 st July 2012

General AAVS Schedule AA-low Small array demonstratorsAAVS02011 Technology demonstrator AAVS12013 SKA1 full pre-production prototype arrayAAVS22015 SKA 1 manufacturing data package2016 AA-mid Individual tile demonstratorsAAVS02011 Single array performance demonstratorAAVS12013 Multi-array interferometer performance demonstratorAAVS22016 SKA 2 capable costed design2016

AA-low Demonstrators Array ScaleSitePurpose & Comments AAVS0 2011/2 AA-low16 elements Local Prove electromagnetic performance in small array. Multiple arrays AAVS1 2013/4 AA-low 256 elements Selected SKA site strongly preferred. Single station showing beam performance and the limits of analogue power requirements AAVS2 2015/6 AA-low,000’s of elements in single or multiple arrays Selected SKA site. Multiple stations, similar to AAVS1, to show imaging performance. Final proving for SKA 2. Small numbers of beams for processing reasons. NOT a science instrument AAVS2 science capable

AA-mid Demonstrators Array ScaleSitePurpose & Comments AAVS0 2011/2 AA-mid~1m 2 tile Test chambers/ EMBRACE For ORA: prove concept and LNA interface For Vivaldi: refine array and manufacturing techniques AAVS1 2013/4 AA-mid256 clusters Selected SKA site strongly preferred. Single station showing beam performance and the limits of analogue power requirements AAVS2 2015/6 AA-mid Single or array of stations Selected SKA site. Multiple stations, similar to AAVS1, to show imaging performance. Final proving for SKA 2. Small numbers of beams for processing reasons. NOT a science instrument AAVS2 science capable

Event list….. DateMilestone/EventRemarks Jan 2010AAVP start April 2011AA CoDR Aperture Array system, AA-low and AA-mid, Concept design review Nov. 2011AA dCoDRAperture Array delta concept design review of the AA-mid Q1 2012AAVS0 completion and testTesting of the various small array test systems April 2012AAVP final report for PrepSKAConsolidated findings from the PrepSKA work Q2 2012SKA site selection Q2 2012AAVS1 PRRProduction readiness for a small AAVS system Q3 2012Start AAVS1 constructionBuild AAVS1 on SKA site Q1 2013AA- SRRSKA 2 System Requirements Review for the AA-mid Q1 2013Start AAVS1 commissioningStart test and evaluation process Q2 2013AAVS2 PDR Q3 2013AAVS2 CDRCovers both AA-low and AA-mid..

AAVS Funding Self funded by the AA consortium Material AAVS 1 : 1M€ Material AAVS 2 : 5M€ –PEP numbers..

Notes A site decision delay impacts AAVS1/2 SKA site needs to be ‘happy’ to host AA Verification Systems Significant step needed from pathfinders to SKA 1 –Tight schedule Connect to deliverables of STaN, Computing and Software? Interference with pre-cursors? Need to tackle outstanding issues with existing team up to 1 st July 2012 –AAVS0 design, build and evaluation, AA-station specification/design