R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
EMERGENCY MANAGEMENT PLANNING. COUSINO HARRIS DKI EMERGENCY MANAGEMENT PLANRESPONDRESTORE.
1 Working Group on Archives and Records Management WGARM.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LHC Radiation Environment and Future Electronics Policy for the Accelerator Sector 1 st R2E RADIATION SCHOOL & WORKSHOP Divonne, June 2 nd /3 rd 2009 M.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
1 1. Some recent views ( ) 2 Linac tunnel
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Impacts of SEEs LHC Performance Workshop Chamonix 2009 R2E Taskforce B. Bellesia, M. Brugger, A. Ferrari, D. Kramer, R. Losito, S. Myers, M. Pojer, S.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
R2E Workshop Preparations RadWG Meeting March 25 th.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Summary of IAP comments from 2007 EURISOL Town Meeting
LHC intervention scheduling with the Work Acceptance Tool
CRG - TM Special OdH Introduction
Chapter 6: Database Project Management
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
the CERN Electrical network protection system
Upgrade Strategy for the Experimental Vacuum Systems
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
R2E Follow-Ups and Project
R. Losito – LHC Performance Workshop Chamonix Jan 2010
Radiation Working Group RADWG
Presentation transcript:

R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009

As a Reminder … 2 August 20th 2009 R2E Status Report

The R2E Mandate The R2E Study Group forms a small committee consisting of experts in the various fields related to electronics damage and shall drive other working groups (RADWG). This way the R2E assists LHC operations and equipment groups with expert knowledge and assessments of radiation-induced failures in electronics of the accelerator, as well as directly coordinates studies of remedial actions: Immediate  propose and evaluate short-term measures to reduce failure risks  establish, extend and evaluate the inventory of information needed to assess radiation-induced electronics failures  ensure accurate monitoring of radiation fields in critical areas to evaluate risks of electronics failures  advice on planned CNGS irradiation tests, including calculations  commission and evaluate machine studies to understand the possibility of reducing/displacing losses Long-Term  coordinate studies of radiation-induced failures, including calculations and proposals of solutions, and complement the inventory with measured data and experience gained during operation  advice on further dedicated irradiation tests, including calculations  assist LHC operations and concerned groups in the identification and short-term mitigation of failures Prioritization Inventory Short-Term Testing Monitoring Coordination Long-Term Mid-Term August 20th R2E Status Report

R2E Steps (2009) Part 1 Priority List of Areas  based on available Monte-Carlo simulations  linked to operational assumption for the various ‘years’ Update and detailed analysis of Simulations  Collection of existing simulations  Launch of new simulation effort  clear identification of critical areas and respective radiation levels (over time!) Relocation/Replacement of equipment from UX85  currently completed Preparation of TZ76 and displacement of equipment in UJ76:  Relocation in TZ76 fully integrated  preparation of infrastructure done.  Cabling and displacement analysed (but not done!!)  action limited by LHC schedule  UPS relocation and pre-cabling for PC relocation) Additional shielding  UJ76, RRs, new maze, P6 ducts (kicker electronics), US85 Relocation/Replacement of equipment from US85  Fire/ODH completed/ongoing, Cryo study finished (to be performed in 2010),… Prioritization Inventory Short-Term and Mid/Long-Term Short-Term August 20th R2E Status Report

R2E Steps (2009) Part 2 Detailed Point-Iterations  visit of areas looking into integration options, available monitoring (Etat de Lieu) Priority List of Equipment (Classes)  direct interaction with equipment groups (starting with machine protection)  identified safety related  proposal to prepare ‘short-term’ actions (ongoing) RadWG: organization of radiation tests in CNGS and outside CERN (FIP, QPS, Cryo, Power Converters …)  Tests conducted at PSI, Louvin, Prospero, continuous testing in CNGS Radiation monitoring  calibration experiment at CERF shows investigated RadMon calibration in mixed fields (with different voltage settings)  additional measurement proposal at PTB (including funding through EFNUDAT)  study of required installation/displacement of RADMONS, additional TLD monitoring  development of monitoring tool for offline analysis, first beta-version available Radiation school  Organised with PH-ESE, 2-3 June: ~55 participants, 16 lecturers Documentation  R2E Website (Presentations, Minutes), R2E Library, Picture Gallery of Critical Areas, Inventory of Monitor, Publications (ECRs, Chamonix, Point-Reviews, …) Inventory, Monitoring Prioritization Testing Monitoring Long-Term Mid-Term August 20th R2E Status Report

R2E Structure 1. Policy for Electronics installed in areas with elevated radiation levels (R2E) 2. Evaluation of Radiation Levels: simulations, monitoring, proposal of measures and general coordination (R2E) 3. Structure to implement the Policy (RadWG) 4. Organization and Analysis of Radiation Tests (RadWG) 5. Control (LHC Point- Owners) R2E RadWG Point- Owners Equipment Owners Installations Testing Monitoring Electronics Policy LHC Machine Committee August 20th R2E Status Report

Status Report … 7 August 20th 2009 R2E Status Report

short-term: minimize the risk or radiation induced electronics failures  perform possible relocations (within shutdown constraints)  install additional shielding  improve monitoring to prepare analysis for early operation mid-term: operational experience and towards a complete solution  prepare additional shielding  preparations of early relocations (in case time slots become available or urgent requirements)  finalize equipment inventory  prepare integration studies (full relocations, alternative solutions) long-term: implement subsequently the chosen solution, new policy and continuous follow-up  based on early measurements, decision/integration on long-term solution Current R2E Main Objectives 8 August 20th 2009 R2E Status Report

Continued TZ76 preparation Iron-Shielding to protect equipment in the US85 Safe Room to be installed [before start up] TLD monitors are being installed in LHC to allow very early monitoring even at low radiation levels Displacement of some RadMons in LHC in order to increase statistics and allow for early extrapolation Voltage setting change of RadMons in DS in order to optimise radiation level analysis (ARC remains unchanged) Ongoing order of additional iron shielding blocks (~2MCHF) Equipment inventory, point-iterations and monitoring Memorandum to LMC for short-term actions accepted Ongoing R2E Related Work 9 August 20th 2009 R2E Status Report

Integration study of full relocation of US85 equipment (almost finished) Relocation of Cryo-equipment in the US including local iron shielding for new rack locations (US85 bottom floor)  study ongoing, final location defined, shielding foreseen Integration studies to allow for shielding of  UJ14/16  UJ23/87  UJ56 (limited to lower floor)  RR13/17/53/57 Integration studies for full relocations of critical areas to verify the possibility, impact and costs and constraints Study of alternative solutions possibly including heavy civil engineering R2E Related Work in Preparation 10 August 20th 2009 R2E Status Report

Study, Planning, Evaluation, Costing,.. Currently prepared for LHC Consolidation Planning (integration in mid/long-term budget) Continuous follow-up and adaptation R2E Related Work in Preparation 11 August 20th 2009 R2E Status Report