What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.

Slides:



Advertisements
Similar presentations
Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant.
Advertisements

Simple Tabletop Exercise Objectives:  Evaluate ER preparedness and crisis management  Develop a procedure to simultaneously and efficiently handle widespread.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Treatment of Waste Brine from a Brackish Reverse Osmosis Plant
Anne Arundel County Department of Public Works
WORKING TOGETHER THE COOPERATIVE PLAN TO IMPROVE URBAN, AGRICULTURAL, HABITAT, WATER QUANTITY AND QUALITY SHANNON SWEENEY WATER RESOURCES MANAGER - CITY.
Metropolitan Council Environmental Services A Clean Water Agency Metropolitan Council Environment Committee April 12, 2011 Overview of MCES’ Role in Water.
Durham – Where Great Things Happen City of Durham Jordan Lake Allocation Request Presentation to the Jordan Lake Partnership March 21, 2014.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Regional Partnerships for a Sustainable Water Future Britta Strother Water Resource Specialist July 22, 2010.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Bloomington’s Water Supply: System Overview and Planning by: Rick Twait, Superintendent of Water Purification City of Bloomington Mahomet Aquifer Consortium.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Is there a Drought in Ventura? City Manager’s Report July 16, 2007.
Section-07 of Chapter-V of KW&SB, Act 1996 describes following Major Functions of KW&SB:- UNDERTAKE BULK PRODUCTION, FILTERATION / TREATMENT TRANSMISSION.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Simple Tabletop Exercise Objectives:  Test how public health officials and water suppliers work together in a water security incident  Determine methods.
Simple Tabletop Exercise Objectives:  Evaluate cyber security protocols and procedures  Consider to what degree reliance on SCADA Systems is appropriate.
Simple Tabletop Exercise Objectives:  Evaluate chemical supply alternatives  Determine interdependencies between the utility and other infrastructures.
Key Elements of a Safe Water Supply An Adequate and Protected Water Source A Secondary Supply A Quality Treatment System An Adequate Finished Water Storage.
The Beginning Rapid Regional Growth Concerns about groundwater capacity Water quality issues Search for alternative solutions.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Bloomington’s Water Supply: System Overview and Planning by: Rick Twait, Superintendent of Water Purification City of Bloomington Mahomet Aquifer Consortium.
Simple Tabletop Exercise Objectives:  Practice decision-making in the absence of critical information  Consider the Threat Evaluation Process (from the.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Lecture 1 Water Distribution Systems
Water System Planning Study
Presentation prepared by: Toni Crosby Antoinette Aguirre Mike Belanger Beata O’Brien.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
NARUC Summer Committee Meetings Committee on Water Water Supply Planning: East, West, North and South July 17,2007.
Senate Environment & Natural Resources Committee Groundwater Management in the Twin Cities Metropolitan Area April 9, 2013 Keith Buttleman Metropolitan.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Water, Water, Everywhere ENS102D 3/13/06. Review Water supports the anthropic principle Water is geologically important Water is biologically important.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Dr. Richard N. Palmer, Margaret A. Hahn, Dr. Azad Mohamadi, Dennis Kessler, Joe Dvorak Department of Civil and Environmental Engineering University of.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
Upcoming Rate Case February Department of Waterworks Owns and manages Indianapolis Water. Bi-partisan seven member Board of Directors oversees department.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Joint California Energy Commission and California Public Utilities Commission Bulk Storage Workshop November 20, 2015 Kelly Rodgers Energy Program Manager.
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Houston Area Water Corporation Northeast Water Purification Plant Houston Area Water Corporation Northeast Water Purification Plant October 13, 2000 CDM.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Lecture (11): Water Distribution Systems
JEA’s Initiatives and Capital Improvements Program
Richland Creek Water Supply Program Briefing
Kings Bluff Raw Water System Parallel Raw Water Main Project
Water Supply and Drought Resilience
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
Class III Estimate for Regional Consolidation
Capital Area Council of Governments
Future Water Supply Evaluation
Case Study: Lebanon Water Works
Presentation transcript:

What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners

– 248 employees Saint Paul - 94,000 Total Customer Accounts 90,000 Domestic Accounts 4,000 Commercial Accounts ArdenHills Roseville Maplewood LittleCanada FalconHghts MendotaHeights West St Paul SunfishLake Lilydale Lauderdale Mendota 5 Suburban Retail Customers –Serve a population of 420,000

Saint Paul Regional Water Services Population Served: 416,759 Average Day 2012: 44.8 mgd Max Day 2012: 77.2 mg pumped Source Water: Lake system augmented by Mississippi river; groundwater Treatment: Conventional/lime softening Facilities:Built 1921, last major expansion in 1958; multiple upgrades to various facilities over the years

Capacities – Raw Water LocationCapacityAppropriationUsed in 2012Excess Fridley Pumping 80 MGD20 BGY13 BG7 BG Fridley Conduits 90 MGD Lakes storage (Operating) 350 MG Lakes storage (above intakes) 3.56 BG Vadnais Conduits 160 MGD30 BGY16.46 BG13.54 BG Wells 45 MGD16.8 BGY1.4 BG15.4 BG

Capacities – Finished Water (Excess capacity = Max sustained day – peak day) LocationMax DayMax day sustained Average Day “Excess Capacity” McCarrons130 MGD105 MGD45 MGD30 MGD