Rule 22 Automation Update ACACSO – Austin, TX November 2014.

Slides:



Advertisements
Similar presentations
Presenter: Lisa Butts Watco Companies Modified from ASLRRA Car Hire Training Class A special thanks to Lance (my youngest son) for helping me with the.
Advertisements

1 © 2013 Railinc Corp. All rights reserved. R ECLAIMS Presented By: Chauncey Fallen Manager-Transportation Services GATX Corporation- Rail.
GATX Corporation ACACSO- Rule 22 TAG Update May Las Vegas, NV Presenter: Chauncey Fallen- Manager Transportation Services.
CE 515 Railroad Engineering Car Ownership and Distribution Source: Armstrong, Ch 10 “Transportation exists to conquer space and time -”
0 SCO90 What it is? What it Does? How does it affect Car Hire? Lisa Gering November 10, 2010.
1 ACACSO Nov 2009 Equipment Assets Committee (EAC) Task Force Structure and Update.
ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation.
ACACSO – New Orleans, LA May 11, 2012 Lynn Brown LB Rail Consultant, Inc. 1.
Copyright © 2011 Railinc Corp. All Rights Reserved Industry Projects and the RPSWC Process 1.
ACACSO Understanding and Establishing Pool Codes Jeffery D. Roton November 14, 2013.
Transportation Codes & Transportation Conditions Codes ACACSO Meeting November 11, 2010 Presented by: Todd Poland, General Director Car Accounting Watco.
Car Service Rules – 1 thru 6 ACACSO Spring Meeting May, 2008 Chicago, IL.
TOL’s All You Need to Know ACACSO, Austin TX Nov 10 – 12, 2014
R ULE 22 A UTOMATION ACACSO – MAY B ACKGROUND Recommended by Centralized Car Hire TAG (CCH) in September 2013 Unanimously approved by Equipment.
Railroad Clearinghouse Update ACACSO – November 12 th, 2008 Orlando, FL Robert Sanford Manager Car Accounting.
Electronic Defective/Damaged Car Tracking System (DDTS) ACACSO Meeting Chicago - May 7, 2008 Dale Cassels CSX Transportation.
Car Hire Rule 5 and Car Hire Rule 15 Transfer of Liability © 2007 Railinc. All rights reserved.
ACACSO Car Service Rules 7 to 12 November 11, 2014.
N Madison Yard Wiggins 2 Yard CSXT NS A L S UP BNSF Merchants Bridge MacArthur Bridge NS BNSF UP MRS Wiggins 5 Yard KCSUP NSBNSFKCSUP Gateway Arch CMR.
Car Hire Claims Workshop 101 November 13, AGENDA 8:30 to 8:45 Introductions & Attendance 8:45 to 9:00 AAR Certification on Car Hire Claims Discussion.
RAILINC I ACACSO
EAC Update for ACACSO – Nov 2014 George A. Jones, CPA CMA – Dir. Car Accounting and Disbursements CSX Transportation November 2014.
May EAC meeting Schedule 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks before the Business Services.
Dale Cassels – Manager Car Accounting CSX Transportation.
© Railinc 2009 All Rights Reserved 1 Railinc Corporation – 7001 Weston Parkway, Suite 200, Cary, NC – Report on Railinc’s.
GATX Corporation ACACSO- Rule 22 TAG Update Nov Atlanta, GA Presenter: Chauncey Fallen- Manager Transportation Services.
EAC Update ACACSO November, EAC meeting schedule for 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks.
November  Cary, NC Oct. 4, 2011  Next meeting is in January via Conference Call.
EAC Update for ACACSO November 2012 George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation.
RAILINC I ACACSO
UMLER ISSUES THAT AFFECT CAR HIRE ACACSO Meeting November, 2014 Patty Livingston Manager Fleet Administration Genesee & Wyoming Railroad Services.
EAC Update ACACSO May 12, 2010 George A. Jones Project Update Damaged & Defective Car Tracking (DDCTS) – Work has begun on the 2010 project to complete.
EAC Update for ACACSO May 2012 George A. Jones – Dir. Car Accounting CSX.
© 2007 Railinc. All rights reserved. Equipment Assets Management Working Committee.
RAILINC I ACACSO
AAR Audit TAG Update May 08, 2008 George A. Jones - CSXT.
Damaged and Defective Car Tracking System - Update Dale Cassels - CSX ACACSO November 12, 2008.
RULE 4 UPDATE ACACSO Meeting Atlanta – November 14, 2013 Scott Churchill.
©Railinc 2010 All Rights Reserved Car Hire and DDCT Mark Aldenderfer, Business Analyst 1.
George A. Jones, CPA CMA – Dir. Car Accounting and Disbursements CSX Transportation May 2014.
EAC UPDATE FOR ACACSO George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation May 2013.
RAILINC I ACACSO
Barbara Ward November 13, 2008 ACACSO Orlando, Florida Improving the LCS Process LCS UPDATE.
ACACSO Workshop Car Hire Rule 22 November Memphis, Tennessee J. D. Pavek The Greenbrier Companies.
LCS Report Card Mike Partica May 2008 Chicago, Il.
© 2010 Railinc. All rights reserved. Industry Projects & Vision May 9, 2012 New Orleans, LA Jim Pinson Railinc.
RAILINC I ACACSO
Equipment Asset Management Working Committee Update.
Defect Damaged Car Tracking System Robert Sanford Manager Car Accounting Norfolk Southern.
1 © 2013 Railinc Corp. All rights reserved. R ECAP OF THE C AR H IRE R ULES ACACSO Workshop/Breakout Session Albuquerque, NM November 11 & 12, 2015.
EAC UPDATE Jim Pinson ACACSO May 11 – 13, 2016.
Railroad Switching – Car Hire Impact
Serving Area Table.
Car Hire TOL’s ACACSO, Coeur d’Alene, ID May 11 – 13, 2013
Centralized Car Hire Foundation User Support Project
ACACSO Workshop Suggestions- Car Hire Rule 22 TAG
Jackie Singer CN System Manager – Business Process Optimization
Rule 22 Automation Update ACACSO – Springdale, AR May
What Happens to Private Railcars – Follow-Up to Savannah
EAC Update Jim Pinson ACACSO May , 2018.
Industry Terms & Acronyms
Railroad Clearinghouse Update
Serving Area Process ACACSO Conference May 10, 2018
Equipment Assets Committee Update
Serving Area Table Project Update
Liability Continuity System (LCS)
Car Hire Rule 4 Jim Pinson ACACSO May 7, 2014.
ACACSO San Antonio, TX May 9 – 11, 2018
Equipment Quality Reporting System
TRAIN II Jim Pinson ACACSO May 9, 2014.
Presentation transcript:

Rule 22 Automation Update ACACSO – Austin, TX November 2014

Background Recommended by Centralized Car Hire TAG (CCH) in September 2013 Unanimously approved by Equipment Assets Committee (EAC) in January 2014 TAG appointed by EAC and meetings began in February 2014 Approved by RPSWC in August 2014 contingent on EAC approval of Rule 22 verbiage and business rules

Tag Members GATX Greenbrier Companies GE Progress Rail Services Railinc ShipXpress TTX Company CN CP CSXT GWRR KCS NS UP

TAG Goals Create a set of standard business rules Simplify the existing Rule 22 verbiage Low cost industry implementation – LCS message Not to change the intent and current application of the rule

System Processing LCS message – To car mark owner or rack owner for multilevels Timing of transactions – No change to existing LCS processing rules (5 days) – Reclaim processing will evaluate 20 days of event reportings Covers 95% of all reclaim transactions “Clean-up” process – Beginning and ending events < 20 days no further processing – Beginning and ending events > 20 days Process will analyze events to ensure relief was appropriate If relief was not appropriate, a reversing transaction will be generated

Bilateral Agreements Designating non-participating carriers for relief – Loading point and/or holding point Shipper pools – designated by pool operator Joint, National, RELOAD pools – designated by any pool participant Other agreements – Limit or exemption of reclaim time and/or location – Exemption of specific cars from relief

Serving Areas vs. Switch Districts Serving areas - defined by each carrier based on: – Geography – 1 st two digits of SPLC – Railroad operations Information availability – Transparency – Automated notification when changes are made Dispute – Arbitration through Car Hire Rule 17

Shipper Pools Eligible equipment – Umler will reflect a pool number with a carrier’s numeric code as the first three digits (not 999 or 998) and the Pool Type in Umler must be “C” or – The Transportation/Transportation Condition Code will be C, DC or EC Eligible carriers – Only the pool operator or carriers designated by bilateral agreement are eligible for relief – For example, cars in pool (NS) will be allowed holding point and loading point relief – Allows for bilateral agreements between pool operator and other roads for loading point and/or held short reclaims

Joint Pools Eligible equipment – Umler will reflect a pool assignment that starts with 998 and the Pool Type in Umler must be “C” or – The Transportation/Transportation Condition Code will be C, DC or EC and – The handling carrier will be a participant in the pool. Eligible carriers – Only the carriers that participate in the pool will be eligible for relief. – For example, if pool is operated by carrier A and B, either carrier A or B will be allowed relief – Either of the pool participants will have the ability to establish bilateral agreements with other roads for loading point and/or held short reclaims

National Pools Eligible equipment – Umler will reflect a pool assignment that starts with 999 and the Pool Type in Umler must be “C” or – The Transportation/Transportation Condition Code will be DN or N – The North American Boxcar Pool (NABP) and specific equipment pools operated by TTX will be excluded from the relief process Eligible carriers – Any carrier that has contributed equipment to the pool will be eligible for relief – Any of the participants in the pool will have the ability to establish bilateral agreements with other roads for loading point and/or held short reclaims

National Pools - RELOAD RELOAD Eligibility – All carriers that participate in the TTX Reload Process will be eligible for holding point and loading point – Participating carriers will be identified via information contained in Umler (pool number and/or pool operator) Bilateral agreement – Any participant in the RELOAD pool will have the ability to establish bilateral agreements with other roads for loading point and/or held short reclaims

Loading Point – Subject to Demurrage System design: – All equipment subject to demurrage/storage unless updated by carrier – Beginning transaction – empty arrival – Ending transaction – empty placement (actual/constructive) – Missing events: Arrival or placement – no relief allowed LCS Transactions: Arrival at Loading Point EDelivery - R222 PlacementEReceipt - R222 Release LoadedL

Loading Point – Exempt from Demurrage System design: – All equipment subject to demurrage/storage unless updated by carrier – Beginning transaction – empty arrival – Ending transaction – release load or first loaded event – Missing events: Arrival – no relief allowed Release – relief ends on first loaded record LCS Transactions: Arrival at Loading PointEDelivery R222 PlacementE Release LoadedLReceipt R222

Holding Point System design: – Beginning transaction – empty arrival – Ending transaction –empty departure (same location) < 24hrs between beginning and ending transactions – Missing events: Arrival or release– no relief allowed LCS Transactions: Arrival at Holding PointEDelivery - R224 Departure from Holding PointEReceipt - R224

Next Steps TAG actions – Complete proposed business rules – Complete proposed Rule 22 verbiage change Potential project – Requires approval from EAC

Questions Robert Sanford Director Revenue Accounting Support Services