Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss PP QPF Workshop 8 March 2007, Langen.

Slides:



Advertisements
Similar presentations
Your Project Report is a record of how the problem was solved It provides guidance to your company to implement what you have done It is one of the assessment.
Advertisements

1 UNSD/FSO workshop on Integrated Economic Statistics Jean-François Fracheboud Federal Department of Home Affairs FDHA Federal Statistical Office Re-engineering.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss D-PHASE: Demonstration of Probabilistic Hydrological and.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The Latent Heat Nudging Scheme of COSMO EWGLAM/SRNWP Meeting,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG5-Report from Switzerland: Verification of COSMO in.
Structure of a Research Proposal or Report INFO4990: Information Technology Research Methods DECO3008: Design Computing Prep Honours Mary Lou Maher March.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Quantitative precipitation forecasts in the Alps – first.
Project Workshops Assessment. 2 Deadlines and Deliverables No later than 16:00 on Tuesday, Week 21 in the Easter Term (second Tuesday) This is a hard.
Federal Department of Home Affairs FDHA Federal Statistical Office FSO Guidelines of Statistical Business Register Draft chapter 7 Fabio Tomasini – Paul.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
November 7,  Provisos are in annual Appropriations Bills  Proviso 1A.60 included in bill  Very prescriptive.
CHE 165 Plant Design Introduction. Greensheet Review  Target is Study –Reported Verbally and in Text –Consists of Various Components  Most are submitted.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Parametrization of Subgrid-Scale Orographic Drag in the.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Plans for next year COSMO General Meeting, 21 September.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Operational COSMO Demonstrator OPCODE André Walser and.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Report on Workshop « Stratified verification by weather.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Data mining in the joint D- PHASE and COPS archive Mathias.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Task 1 of PP Interpretation 1.1Further applications of.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Final PP QPF meeting COSMO General Meeting, 18 September.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Stability of the COSMO turbulence scheme Oliver Fuhrer.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Atmosphere at rest experiments with the latest COSMO version.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss High resolution COSMO runs for dispersion applications.
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss MAP D-PHASE – a WWRP Forecast Demonstration Project Marco.
Reporting Kick-Off Meeting in Geneva. Kick-Off Meeting in Geneva: Budget and FinancesSlide Reporting Outline 1.Reports and deliverables 2.Deadlines.
1 Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss NWP Eumetcal course November 2007 Langen – Germany.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Accounting for Change: Local wind forecasts from the high-
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Local Probabilistic Weather Predictions for Switzerland.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG4 activities Pierre Eckert, MeteoSwiss, Geneva.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Sensitivity studies for the Swiss test cases LM User Seminar,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Overview status report COSMO General Meeting, 19.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss A more reliable COSMO-LEPS F. Fundel, A. Walser, M. A.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss TKE as a measure of turbulence COSMO General Meeting,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss COSMO Priority Project ’Tackle deficiencies in quantitative.
WSN Summer Project Skövde Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Component testing of the COSMO model’s turbulent diffusion.
Review and outlook COSMO General Meeting, 8 September 2011.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The new algorithm for gridpoint - station correspondence.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Numerical Weather Prediction at MeteoSwiss 8th of October.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
Federal Department of Home Affairs FDHA Federal Statistical Office FSO Michel Di Pietro, Ruth Meier Swiss Federal Statistical Office (FSO) Developing an.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Experiments at MeteoSwiss : TERRA / aerosols Flake Jean-Marie.
3 STUDENT ASSESSMENT DEPARTMENT
Verification Priority Project ‘Quantitative Precipitation Forecast’ Progress report Task 1.1 and 1.2 Silke Dierer and Francis Schubiger MeteoSwiss.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss VERSUS: Requirements for TEMPs and windprofilers Francis.
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
Aaron Brown Office of Assessment SC Department of Education
Security week June 2017 © ETSI All rights reserved.
OSP Federal Update April 11, 2018.
Visual Guide to Governance & Strategy Motions Process
DG Environment, Unit D.2 Marine Environment and Water Industry
PAIN OUT network in Mexico
March 8th, 2017 Brown AC ELA.
Fees Initiative Chishala Kateka, Working Group Chair IESBA Meeting
Rebecca Hailes For 15 March 2018
Activity on environmental objectives and exemptions
Office of Sponsored Programs
We want to see you in Austin!
We want to see you in Austin!
COSMO PP QPF workshop 8 March 2006 Langen Marco Arpagaus.
Support Activities and WG 6 Overview Status Report
Work of the task force on future censuses Agenda point 3.9
Presentation transcript:

Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss PP QPF Workshop 8 March 2007, Langen

2 PP QPF Workshop | Langen, 8 March 2007 Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch) Welcome … … and Introduction: Aim of this workshop Collect results (deliverables) of task 3.1. Identify missing things for joint assessment (task 3.2) Define next steps. Plan summary report and paper.

3 PP QPF Workshop | Langen, 8 March 2007 Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch) Aim of this workshop Collect results (deliverables) of task 3.1.  done! Identify missing things for joint assessment (task 3.2)  done. Define next steps. Consolidate common findings (lead: Silke). In parallel: visually inspect cases with most significant changes; perform 'recommended analysis'. Prepare some further sensitivity studies (see next page; lead: Axel). Run additional sensitivity studies (maybe 5?). Plan summary report (and proposal for follow-up project?) and paper.

4 PP QPF Workshop | Langen, 8 March 2007 Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch) Aim of this workshop Collect results (deliverables) of task 3.1.  done! Identify missing things for joint assessment (task 3.2)  done; deliver asap, but Fri 30 March the latest. Define next steps. Consolidate common findings (lead: Silke); Fri 13 April. In parallel, and until Fri 27 April: visually inspect cases with most significant changes; perform 'recommended analysis'. Prepare some further sensitivity studies (see next page) until Fri 27 April (lead: Axel). Run additional sensitivity studies (maybe 5?) and submit all relevant results until Fri 29 June. Plan summary report (new due date: COSMO General Meeting) and paper (end of 2007).

5 PP QPF Workshop | Langen, 8 March 2007 Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch) Additional sensitivity studies COSMO V3.22 (or 4.1)! IFS convection scheme (if implemented until 20.4). IFS lateral boundaries. LME analysis favoured another PBL related study? Targeted diffusion??? ? Cross-experiments! qv090 & RK & 3.22 & ? for overprediction in winter some micro & some con & ? for overprediction in summer ?