9-cell cavity coordination CM Ginsburg 8 Mar. 2010.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
US Cavities Status and Plan Mark Champion 01 October 2009.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
Cavity Gradient R&D Status and Future Plans for TDP-2
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
FNAL recent coupler troubles
for the FNAL/ANL, JLab, and Cornell cavity teams
WG-1 Session Cavity Performance Cryomodule Performance
Production Cavities in progress
Cost reduction activities in cavity fabrication at MHI
9-cell Vender Qualification test for LCLS-II
Mechanical Polishing of 1.3 GHz Niobium Cavities
TTC Meeting, 28 February - 2 March, 2011, Milan
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

9-cell cavity coordination CM Ginsburg 8 Mar. 2010

8 Mar 2010CM Ginsburg SRF Mtg2 Production Cavities in progress TB9ACC013 (dressed) –At HTS. To be warmed up in the middle of this week. TB9AES009 (dressed) –Prepared for HTS; HTS installation 15.Mar. ACCEL8 (dressed) –To be HPR’d and prepared for HTS this week at FNAL/ANL facility TB9AES008 (dressed) –Will be next TB9AES010 (dressed) –Will be next after TB9AES008 TB9ACC016 (in transit) –was sent from JLab to FNAL 4.Mar. At O'Hare as of 5.Mar. (D.B. Schenker USA Tracking # ). It's going straight to MP9 for dressing. Ti ring welding at Sciaky is planned for 18.Mar. TB9AES007 –did not initially pass the leak check because of a bad seal (not related to HOM weld void). It will be re-HPR'd and re-assembled with estimated vertical test Mon.15.Mar. TB9RI018 –is at JLab for the full process/test cycle. Bulk EP is complete. 800C furnace treatment starts today. Light EP and vertical test prep are next, with test date estimated the week of 15.Mar. –(continued…) *=bulk-EP’d at RI

8 Mar 2010CM Ginsburg SRF Mtg3 Production Cavities (cont.) TB9RI024* –had optical inspection and was sent to JLab for 800C furnace treatment. It is in the furnace over the weekend, cooling, and will be removed today and sent back to FNAL for light-EP and VTS prep via overnight shipping to squeeze it into the FNAL/ANL facility queue before the maintenance period. TB9RI026 –completed optical inspection and was sent to JLab. It arrived Fri.Mar.5 for 800C furnace treatment expected around the middle of next week (once TB9RI018 is out). Then, it will be returned to FNAL asap for light-EP and VTS prep, presumably immediately after the FNAL/ANL facility maintenance.. TB9RI023* (with the weld void at the transition ring) –RI will grind out the void so it will be large enough to accept a NbTi plug and will then re-weld. The repair is expected to be complete within 2 weeks. TB9RI019 –Headed to JLab shortly; JLab will inspect irises and equators with their new KEK/Kyoto system upon arrival TB9RI029* –In optical inspection TB9RI020, TB9RI021* are done with incoming inspection Incoming inspection started on TB9RI022* To be inspected: TB9RI025*, TB9RI027, TB9RI028 New cavities –The first AES cavities are currently expected to arrive by the end of March. The first two Niowave-Roark cavities are currently expected to be completed by end March. *=bulk-EP’d at RI

8 Mar 2010CM Ginsburg SRF Mtg4 R&D Cavities in progress AES003 (spot polished at KEK) –Next: optical inspection (possible brown stains), field flatness measurement and possibly tuning –Held in reserve as CM2 backup cavity until it can be replaced by a better cavity ACCEL6 and ACCEL7 –Held in reserve as CM2 backup cavities until they can be replaced by better cavities TB9ACC014 (after dented cell was tuned to lower field) –Vertical test 15.Feb.: 29 MV/m at 2K; some FE observed. grad=1.4E10 –retest with second sound and different thermometry configuration TB9ACC010, ACCEL9, TB9AES005, TB9ACC015 Cornell) –are in various stages of tumbling and VEP. Being used for VEP commissioning and performance improvement. TS7MSU001 & TS7MSU002 (visual inspection and tuning only, then return) –Visual inspection complete, field flatness measurement complete, tuning in progress

8 Mar 2010CM Ginsburg SRF Mtg5 9-cell Cavities - By Facility Incoming inspection New RI cavities, alternating not-EP’d and EP’d Tuning/field flatness measurement 2 MSU 7-cell beta=0.8 cavities, AES003 (after optical inspection), TB9RI022* (when other incoming inspections complete); next will be TB9RI025*, TB9RI027, TB9RI028 (order uncertain) Optical Inspection TB9RI026 last week, TB9RI029* currently, next: AES003, up to 3 additional production cavities available [TB9RI020, TB9RI021*, TB9RI022*] FNAL/ANL (dressed – for HTS prep) ACCEL8, TB9AES008, TB9AES010 (bare – for VTS prep) TB9RI024* light EP+VTS prep (after JLab 800C HT); TB9RI026 light EP+VTS prep (after JLab 800C HT); more light EPs to come down pipeline [TB9RI029*, TB9RI021*, TB9RI022*, TB9RI025*, TB9RI023*]; also several heavy EPs on NR and AES cavities Weighing device to be procured VTS Second sound system to be completed TB9ACC014 (with second sound and modified thermometry), TB9RI024* (after JLab visit and light EP); same list as FNAL/ANL (bare) above HTS TB9ACC013 warm up mid-week, TB9AES009 (installation March 15; 3 weeks duration), ACCEL8 (test duration: 2 weeks proposed), TB9AES008 (test duration: 2 weeks proposed), TB9AES010 (test duration: 2 weeks) MP9 TB9ACC013 (dressed) remove cold coupler in cleanroom and inspect, TB9AES009 (dressed) to be delivered to HTS for installation 15.Mar., HTS prep follows for ACCEL8 (dressed), TB9AES008 (dressed), TB9AES010 (dressed); TB9ACC016 is next for dressing NB: when in doubt, production cavities always have priority