RD51-WG7 2009-VI 28/04/2009M. Alfonsi (CERN)1 RD51 common test beam: specifications and installation status Matteo Alfonsi (CERN)

Slides:



Advertisements
Similar presentations
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Advertisements

D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
RD51 test SPS/H4: experimental area hazards and operational procedures (preliminary version, to be discussed with Safety Experts) Matteo Alfonsi.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
News on GEM Readout with the SRS, DATE & AMORE
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Status of Gas Barrack(SPS) and Exhaust JAILLET David EN/EA/CT.
The Next Generation of a Gamma Irradiation Facility GIF++
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
RD51-WG X June test beam experience: useful information for October
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Nikhef/Bonn LepCol meeting
IHEP group Shashlyk activity towards TDR
DAMPE Status (T9) Steadily taking data since last Thursday
Test beam setup: status report 10/02/2009
in a high intensity beam
Status Report and highlights from workshop II
Presentation transcript:

RD51-WG VI 28/04/2009M. Alfonsi (CERN)1 RD51 common test beam: specifications and installation status Matteo Alfonsi (CERN)

RD51-WG VI 28/04/2009M. Alfonsi (CERN)2 Outline  RD51 Test beam approach and requirements  Schedule and experimental zone details  Setup sketch and mechanics  Gas system & cables  Goliath Magnet  Calibration sources and radioprotection issues  Report on Initial discussion on safety

RD51-WG VI 28/04/2009M. Alfonsi (CERN)3 From the approved proposal: “The collaboration would like to ask for the following resources and infrastructure at CERN: […] Access to irradiation and test beam facilities (including the possibility to keep “semi-permanent” setup). The collaboration foresees typically 2 annual test beam campaigns each of a few weeks duration.” Dedicated semi-permanent test beam Dedicated cables and gas pipes permanently lying in the zoneDedicated cables and gas pipes permanently lying in the zone Stable dedicated gas mixing racks in the gas zoneStable dedicated gas mixing racks in the gas zone Dedicated space, electronics racks, computers in the control roomDedicated space, electronics racks, computers in the control room Devices such as trigger scintillator and tracking telescope, as well as support mechanics. They will be stored out of the beam line but in the experimental area or very close to itDevices such as trigger scintillator and tracking telescope, as well as support mechanics. They will be stored out of the beam line but in the experimental area or very close to it Semi-permanent setup means that the detectors to be tested change every time, but RD51 members, also from outside CERN, can always find:

RD51-WG VI 28/04/2009M. Alfonsi (CERN) Specific test beam requirements Requirements 2009: Dimension: around 60x60 cm 2 planar devices; weight: few kg devices CF 4 and flammable gas mixtures High resolution (better than 70μm) external tracker Low or high rate beam, typically MIPS (pions preferred) Mechanical Support allowing X-Y position and rotation High Magnetic field, sometimes together with low energy beam Groups involved in summer time slot: CERN GDD Large Area GEM detector (large support) Frascati KLOE-2 GEM prototypes (magnet, flammable gases) Groups involved in autumn time slot: CERN GDD Large Area GEM detector Paul Colas’ Saclay group MicroMegas TPC (magnet, low energy beam) Stephane Aune’s Saclay group MicroMegas (magnet?, flammable gases?) Bonn TPG (high energy beam, magnet?) maybe Philippe Legou’s Saclay group Micromegas (no info, no enough gas lines!!)

RD51-WG VI 28/04/2009 M. Alfonsi (CERN)5 Our time slots: updated to v3.0

RD51-WG VI 28/04/2009M. Alfonsi (CERN)6 SPS/H4 line at Prevessin North Area Height = 1.06 m R = 1.70 m Front opening = 2.40 m Beam direction Goliath magnet RD51 setup

Setup and mechanics

RD51-WG VI 28/04/2009M. Alfonsi (CERN)8 The RD51 SPS/H4 Gas panel Setup A no magnet electr. rack for setup A Removable cable tray for setup A electr. rack for setup B Removable cable tray for setup B Setup B with magnet DAQ PC Issues for Setup B inside Goliath: Electronics rack is in a region with a 5-10mT fringe field Cables lenght can arrive up to more than 8 m

RD51-WG VI 28/04/2009M. Alfonsi (CERN)9 Setup “A” outside the magnet Placed upstream Goliath, composed by a table with precisely- positioned tracking elements and an external support for the case of very large Detectors Under Test (DUTs) Beam line Beam height ~ 128 cm Useful space 3.3 m Beam element Table with DUTs and tracker Only very large DUTs

RD51-WG VI 28/04/2009M. Alfonsi (CERN)10 Table for setup “A” Dimensions: 80x120 cm 2 table, 70 cm height A grid of holes for fixation of high precision (optical bench-like) support for tracker and small DUTs Need help to complete it for June (maybe NTUA?) Suitable for small (20x20 cm 2 ), light (5 kg) tracking elements and DUTs In case of flammable gas, retention buckets can be added on the table (closing the fixation holes) and, in case, as a roof Moved out of beam on the side when not used, without dismounting the tracker

RD51-WG VI 28/04/2009M. Alfonsi (CERN)11 Setup “B” inside the magnet rail wheel Beam Beam height ~ 128 cm ~ 85 cm Similar table (see previous slide) mounted over rails Rails will extend out of the magnet for about 1m, with two legs for support Table will be moved out of the beam when not used. Rails will stay, if possible More than 8m lenght for cable, to arrive from rack to the farthest part of the magnet, properly using cable trays TOP VIEW SIDEVIEW ~ 2.5 m RAIL SYSTEM:

Gas system and cables

RD51-WG VI 28/04/2009M. Alfonsi (CERN)13 Goliath magnet Gas panel includes also retention buckets for flammable gas sensors. sensor Gas Pipes Stainless steel from gas zone to a patch panel in the experimental areaStainless steel from gas zone to a patch panel in the experimental area Welded connections. Leak test this or next week.Welded connections. Leak test this or next week. 5 lines, each with 6mm diam. pipes for inlet and 10mm diam. pipes as exhaust5 lines, each with 6mm diam. pipes for inlet and 10mm diam. pipes as exhaust

RD51-WG VI 28/04/2009M. Alfonsi (CERN)14 Gas mixing racks We can connect to the main distribution (Ar, CO 2, N 2, He, ethane, isobutan, CH 4, we pay the bill at the end!!!) as well as to use premixed bottle when possibleWe can connect to the main distribution (Ar, CO 2, N 2, He, ethane, isobutan, CH 4, we pay the bill at the end!!!) as well as to use premixed bottle when possible Retention bucket for heavy flammable gases 5 gas lines, requiring 5 gas mixing system (they can fit in 2-3 racks)5 gas lines, requiring 5 gas mixing system (they can fit in 2-3 racks) They will be installed over years, using mostly premixed bottle in the first yearThey will be installed over years, using mostly premixed bottle in the first year Gas racks involving flammable gas and mixtures will be placed in retention buckets/huts with gas sensorsGas racks involving flammable gas and mixtures will be placed in retention buckets/huts with gas sensors Stainless steel flexible pipes could be used inside the racks.Stainless steel flexible pipes could be used inside the racks. Main distribution: not-flammable flammable Our pipes Slot for 2 racks

RD51-WG VI 28/04/2009M. Alfonsi (CERN)15 Gas mixing systems Goal: flexible, upgradable during years, possibility to mix main distribution as well as premixed bottles At the moment, not enough flowmeters and controllers for all the lines.. We start building setups for June from main distribution (use left-over 10mm pipes) Only required gases or premixed bottles (use left-over 6mm -OR- flexible ss pipes) Mixing cylinder.. Who can provide some of them? flowmeter Connection to the pipes going towards the experimetal area Gas system per line

RD51-WG VI 28/04/2009M. Alfonsi (CERN)16 From gas panel to detectors Plastic pipes from gas panel to detectors (up to 10m)Plastic pipes from gas panel to detectors (up to 10m) Retention buckets/huts as well as gas sensors will be applied on the setup table, in case of flammable gasesRetention buckets/huts as well as gas sensors will be applied on the setup table, in case of flammable gases Lack of flammable gas problem: discussing with SPS people it seems they can provide us enough sensors (to be confirmed)

RD51-WG VI 28/04/2009M. Alfonsi (CERN)17 Cables list (barrack  area) Material available for installation (this or next week) ―Fiber line x1 (from NTUA) ―Ethernet lines x3 + 2 small switches at both sides ―SHV lines x4 Still missing: ―Other fiber lines for October ―Few BNC or LEMO coaxial cables

Goliath magnet

RD51-WG VI 28/04/2009M. Alfonsi (CERN)19 Specification and field map from NA57 Power: about 2MW Maximum field: 1.4T Gap volume: around 8 m 3 Max. water pressure: 10 bar Looking at the map realized during NA57 experiment, the field seems to drop fast when approaching the border. Field map realized during NA57 experiment, file decoded by Frascati group

RD51-WG VI 28/04/2009M. Alfonsi (CERN)20 Magnet test week Field measurements for safety: –All the experimental has a fringe field larger than 0.5mT  entrance of people with peacemakers or other sensitive devices is STRICTLY FORBIDDEN –A 10mT (limit for public) border around the magnet has been defined. People working in the Setup B should comunicate the names to the medical service and must be informed of the risks connected to the activity –The field is larger than 200mT already at the coils. Long time full immersion in such magnetic field is not allowed Confirmation of NA57 field map (see Danilo’s presentation) Electronics crate compatibility: e-pool rented standard NIM crate didn’t show any problem up to 5mT

RD51-WG VI 28/04/2009M. Alfonsi (CERN)21 Small calibration source ( 55 Fe and 90 Sr) will be used and a safe locked container has been placed in the area:  When the beam is on, the MUST BE LOCKED IN THE SAFE  They cannot be used in the magnetic field before that proper precautions have been taken (any action must be discussed) Interaction of the beam with magnetic field: −Deflected beam can go out of the actual dump in bad combinations of magnetic field and beam energy −Beam energy and magnetic field are controlled separately, without interlocks to these bad combinations  We ask for an additional temporary larger dump during our operation Radioprotection issues

RD51-WG VI 28/04/2009M. Alfonsi (CERN)22 No problem with the general setup, but the specific setup must be discussed every time.  A clear idea of the setup in the year before, when collecting beam time requests, can make this check faster Running procedure must be defined, especially for the use of the magnet (access without magnetic field is preferred, switching on/off or changing current value with the beam off is preferred, etc etc) At least a subset of the users must be trained to the specific risks and the relative procedure (especially for the magnet)  this allow to organize shifts with experts all the time Report on ISIEC meeting on April 21th

RD51-WG VI 28/04/2009M. Alfonsi (CERN)23  RD51 collaboration is installing a semi-permanent test beam at SPS/H4 beam line, where services and infrastructure will stay permanent, and Detectors Under Test will change from time to time  The installation of gas pipes, cables and network infrastructure for 2009 is early completed  Need to rush and obtain some help for mechanics  Safety aspects are under control Conclusions

Backup slides

RD51-WG VI 28/04/2009M. Alfonsi (CERN)25 Electrical hazards for 2009 Most of the power supplies (e.g. CAEN SY1527) placed in the experimental area and remotely controlled NO short-circuit current greater than 5mA at voltages higher than 50V NO special ground requirements Power consumption:less than 30W each detector around 10kV each electronics rack 2 rack in the experimental area 2 rack in the barrack

RD51-WG VI 28/04/2009M. Alfonsi (CERN)26 Flammable gas mixtures for 2009 Small to moderate gas volumes, low gas flow All leak-controlled devices (gas leak reduces also detector performance) Mostly isobutanic gas mixtures (heavy gas), but also methane (light gas) Flammable gases in magnetic field (can alarm sensor work there?) Inside magnet!