An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.

Slides:



Advertisements
Similar presentations
Specification & Quantities Estimating
Advertisements

Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Example (10.2): Redesign the stair shown in Example (10.1) if it is a cantilever type of a clear span of 1.6 m. Solution : Minimum stair thickness required.
AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
An-Najah National University
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
PowerPoint Presentation
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
CONSTRUCTING A FIVE CABIN LATRINE
Chapter 2b Foundations Shallow & Deep Foundations.
Plain & Reinforced Concrete-1 CE-313
Reading Structural Drawings
An-Najah National University Engineering college Building Engineering Department Health Center Prepared by: Sobhi Ibrahim Islam Ammar Mohammad Odeh Supervisor:
بســـــــــــم الله الرحمن الرحيم Graduation Project 2 Presentation New Design of a Multipurpose Building Prepared By : Amjad Zidan Osama Rashad Ashraf.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
An-Najah National University Faculty of Engineering Civil Engineering Department COST STUDY FOR TWO BEDS TO THE SAME PROJECT (construction main transmission.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Construction PROJECT MANAGEMENT Supervisor : E. Barraq Jumaa Prepared by: Ahmad Faqra Amjad Zarour Nidal Haroon.
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
1. Out line  Site description  Architectural Design.  Structural Design  Environmental Design.  Mechanical design  Safety design An-Najah National.
By : Bara Thaher Mohammad Sameer Osama Joma’a Supervisor : Dr Sameh Mona Climate Responsive Design For Administrative Building In different climate zones.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
* PROJECT OVERVIEW. 1. WHAT? 2. WHERE? * Objective and Method of construction 1. WHAT IS THE OBJECTIVE ? 2. WHICH METHOD USE ?
Name of the course :Building construction Course code :HED 228 Credit hours :3hours Prepared by Eng. Nadir Abd alrazig siddig.
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
Estimating and Scheduling CEE 492
Floor Systems and Foundation Support
}السلام عليكم ورحمة الله وبركاته{
Upon completion of this module, you will be able to:
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
Design of an integrated 5-Star Hotel
An-Najah National University
Measuring Palestinian Labors Productivity
An-Najah Sport Center An-Najah National University
An-Najah National University Faculty of Engineering
Construction Project management
Table (3.1)- the averages of the 10 models costs
Design of shallow foundations for optical and nursing faculty
Redesigning of a Primary school
Construction Project Management
Supervied by : Eng. Ibrahim Mohammad Prepared by : Atheer Daraghmeh
Construction Project Management
An-Najah National University
Graduation Project 2 Redesigning a Villa
An-Najah National University
Integrative Design of a Secondary School
Progress Charts.
Construction Project Management
What is the best method for constructing schools in Palestine ?
Construction Project Management
Construction Project management
Awarding Criterion for late tender: the lowest bid- why?
Analysis and Redesign of Al – Tatbeqea Faculty
Foundation Design of Law and Media College
Building Construction I Sofia Sebastian 1
Concrete A structural material made by combining cement, sand, aggregate, and water.
An Najah National University
An-Najah National University
Civil Engineering Department
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
Presentation transcript:

An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared by: Bara Qadomi Shadi Arar Taher Deeb Supervisor : Eng. Barraq Jumaa

Graduating project consists of two parts : ** The first part includes preparing a theoretical research. ** The second part includes the application of the principle in construction project management.

Project Overview " Medical Center in Al_Daheria " Location: exists in Al-Sadka near Al_Daheria town This project consists of 487 m 2 ground floor with 56 m 2 water well and 523 m 2 first floor.

Object: The main objective of the second part of graduation project will help in understanding the project and calculating quantity of the project and know how we can use management to reach the most economy, safety, minimum duration and good quality of the project. Assumption:  The project was divided in several units.  The project will performed by a local construction company.  The electrical and mechanical work will be given to a subcontractor.  Fixed the value of dollars with local coin (1 dollars= 3.6NIS).

Site plan for the project Medical Center In Al-Daheria

Work Breakdown Structure (WBS)

Activity List & Coding

Bar Chart

Volume of concrete = number * length * width * depth = 15 * 2.5 * 2.25 * 0.6 = 50.6 m^3 Footing # Dimension (m) Depth (m) Bottom steel long direction Bottom. steel short direction Top steel long direction Top steel short direction F1152.5* ø14mm20ø14mm12ø8mm14ø8mm Sample of calculation Calculation for foundation: Calculate of concrete:

Measured Work: foundation DescriptionUnit Dimensions TOTAL (15 F1) NO. BARL (m) D(mm ) W(Kg)TOTAL F1 top longKg top shortKg bottom longKg Bottom shortKg Total kg Sample of calculation Calculate of steel:

S-Curve

The Project At 4 December 2011 From the figure the project is over budget (CPI=0.98) and behind schedule (SPI=0.96)

Cost Analysis For column itemunitquantityquantity/m3price/unit($)price/m3 total concrete requierdm total steel requierdton labor and framingL.S/M3 140 TOTAL COST

2.03 Supply and Cast Reinforced Concrete B a). Tie beams.M.C , b). Reinforced walls bellow ground slab level. M.C , Cast 'B 250 For Slab on hard coreM.S , Supply and Cast Reinforced Concrete 'B a). Stair case (stairs landings )M.C , b). Reinforced walls OVER ground levelM.C , Supply and Cast Reinforced Concrete 'B b). Column NecksM.C , c). ColumnsM.C , Cast B250 for 20cm suspended solid slabM.S4550 2, Cast B300 for 35 cm thick suspended slabM.S , Column in bill Quantity

Result After determine the quantity, duration and dependency between activities then use primavera project to get this result: * The total duration of the project is (359) day. * The total price of the project is(793593$). The price include: 1- The Engineering Supervision is (31744$) which it is 4% of total price. 2- The profit is 10% of total price ( $).

General Information The workCost($)Percentage% EXCAVATION, BACK FILLING SKELETON WORKS STONE WORKS CONCRETE BLOCK WORKS INTERNAL FINISHES TILING, FLOORING, CEILING AND MARBLE WORKS CARPENTRY AND JOINERY WORKS STEEL AND ALUMINUM WORKS PAINTING WORKS INSULATION, AND ROOFING ELECTRICAL WORKS PLUMBING, SANITARY AND MECHANICAL WORKS EXTERNAL WORKS TOTAL Result

The Risk Case In 4december 2011 the project is delayed 13 days, the cause of the delayed is stopping of money discharge. Our solution: The external works is begin at 2 April 2012, the cause of the farther start is to facilitate the construction work and material importing. So we can built the external works partially that don’t disrupting construction works. This step will decrease the total duration of the project.

The project at 20 july2011