By Tanya Bankston.  Current Version of the manual was prepared by Neel-Schaffer in 2002  The Traffic Signal Manual is currently being updated by DOTD.

Slides:



Advertisements
Similar presentations
Office of Traffic, Safety, and Operations Application Guidelines Regulatory Signs Signing Plan Design (At-Grade) June 20, 2012.
Advertisements

Signing Plan Design - At Grade Intersections Course Overview.
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
Presented at the Statewide Traffic Engineers Meeting June 16, 2011
rules of the road Click me
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Formerly Known As Superstreets By Tanya Bankston.
© OPDS 2009 WELCOME TO OCEAN PARK DRIVING SCHOOL My Name is Kim Filby and I will be your Driving School Instructor First things first, do we all know our.
2015 Traffic Signals 101 Topic 3 Field Components.
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
Road Signs and Markings Recognition Quiz Each sign will appear for 0.3 seconds…
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Sample questions from the Rules of the Road units of the Driving Theory syllabus. ESOL for Driving.
Draft Lighting Policy Ted Swansegar Cell:
Florida Department of Transportation, November 2009
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Freeway Signing Plan Design April 29, 2008
At-Grade Intersection
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
2015 Traffic Signals 101 Topic 12 Special Provisions.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
Road Signs and Markings Recognition Quiz Each sign will appear for about two seconds…
8-1 LOW COST SAFETY IMPROVEMENTS The Tools – Traffic Signals – Session #8.
Safety and Design National Technical Services Team 1 Systematic Approach to Intersection Safety May 11, st Annual Missouri Traffic and Safety Conference.
Original TSI was created for Electromechanical Controllers November the New TSI Format was released Format included Modification to allow for better.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
ESTIMATES UPDATE TRAINING BULLETINS FOR 2013 Melissa Hollis, Basis of Estimates Coordinator August 1, 2013 webinar.
2009 MUTCD (Final Rule) Revisions incorporated into the 2009 MUTCD 2009 Manual on Uniform Traffic Control Devices.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Right-of-Way Who Goes First?.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
TRAFFIC: MOVING INTO AND OUT. MOVING INTO TRAFFIC:  Visibility –  Time –  Space –
Unsignalized Intersections Safety at Unsignalized Intersections.
ODOT Traffic Standards Engineer
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Engineering our Highways for Older Drivers in Minnesota
Right-of-Way laws tell all drivers who goes first in different situations. A driver must yield in the following situations:
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
Understanding the Virginia Driver’s Manual
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
Traffic Signs Part Two. What do these 2 signs tell you?
Lesson 2.3 Today’s Objectives: Describe the difference between broken yellow lines and broken white lines. Explain the differences between a shared left-turn.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Road Signs Recognition Quiz Each sign will appear for 3 seconds…
Signals, pavement markings, and proper turns QUIZ
rules of the road Click me
Chapter 3 Regulatory, Warning & Guide Signs Overview
2nd Street Drainage and Paving Improvements
Chapter 3 Regulatory, Warning & Guide Signs Overview
Network Attributes Calculator
* Topic 12 Special Provisions
Chapter 3 Regulatory, Warning & Guide Signs Overview
Irvine Traffic Research & Control Center (ITRAC)
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Chapter 6 Sign Components
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
School of Civil Engineering
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Signs and Markings Pop Quiz
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
lesson 14.4 SPECIAL CITY SITUATIONS
TRAFFIC: MOVING INTO AND OUT.
Presentation transcript:

By Tanya Bankston

 Current Version of the manual was prepared by Neel-Schaffer in 2002  The Traffic Signal Manual is currently being updated by DOTD  The revised manual is currently in draft format only  The Final Version will be available this year

 Introduction to Manual  Keywords

 Traffic Signal Study Requirements  Traffic Signal Justifications  Removal of a Traffic Signal  Installation of a New Traffic Signal  Comparison of Other Alternatives  All-Way Stop  Roundabout  Left Turn Lane  Signal with Turn Lane Added  Signalized and Unsignalized Median U-Turns  Turn (Access) Restrictions

 Types of Signal Operations  Signal Phasing  Signal Timing  TS2 Controller Terminology  Currently updating the TSI Construction Format

 Vehicle Detection  Signal Heads  Traffic Signal Controllers/Cabinets/Communication  Fiber Standards

 Power Supply  If the power supply is more than 500’ from the cabinet and the power pedestal, then a 2 gauge wire is needed.  A power pedestal is required when the power supply is located more than 20’ away from the controller.

 Signal Supports Note: All dual mast arms shall be placed at a 90° angle. If needed, rotate the signal heads to face approaching traffic.

 Signal Wiring  Conduit  Section 45 requested an extra conduit to be ran between the junction box and each foundation  Junction Boxes  Street Lighting on Signal Supports  Signs

 The Required Plan Sheets  Road Construction Plan Inclusion  “Stand Alone” Signal Plans  Draft TSI Construction Format  Engineers Meeting/ Engineers Meeting/2012  Comments due by July 27, 2012

 Draft Traffic Signal Manual  Traffic Engineers Meeting/ Traffic Engineers Meeting/2012  Comments due by July 27, 2012

Tanya Bankston LADOTD – 402B 1201 Capitol Access Road Baton Rouge, LA