ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.

Slides:



Advertisements
Similar presentations
Kevin L. Hoover Waters Edge Hydrology, Inc. – Wetland Conservation Approaches.
Advertisements

Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
Riparian Thinning: Logic Paths for Silvicultural Prescriptions
Maryland Department of the Environment Restoration and Regulation Discussion Presented by: Wetlands and Waterways Program Maryland Department of the Environment.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
G ateway P rogram Off-corridor Habitat Enhancement PMH1 IAERC November 25, 2009.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Riparian Zone Habitat Assessment Vegetation and More.
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
At the Jewett Lignite Mine. the re-establishment of the stream system that existed prior to disturbance… the re-establishment of the stream system that.
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Contract Specifications Background on.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Oregon Jobs and Transportation Act Section 18 CETAS Director’s Meeting Action Items.
Watersheds Capture, Store And Safely Release Water.
1 Design and Restoration. 2 Appreciative Design From Fridley, 2006 Stakeholders (including Problem Owner) Stakeholder expectations (SE) Functional Requirements.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Watersheds Capture, Store And Safely Release Water.
An Overview of Recent Changes To the EEP Restoration Plan and Mitigation Plan Templates Steven D. Roberts Vegetation Senior Specialist
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
Most Common Conservation Practices Forestry Illinois.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Watershed Assessment and River Restoration Strategies
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 When a new project begins early coordination,
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Blue Book Roll Out Revised Expectations Expectations: NOAA Fisheries “ODOT has spent significant effort updating the Guide and making modifications.
Elk Creek Wood Replacement Phase Two Oregon Watershed Enhancement Board, 2009 Katie Halvorson.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
JTA Section 18 Steering Team Meeting Environmental Performance Standards.
Chapter 15 Issues in Water Quality. What is Water Quality? Physical –Sufficient flow to sustain fish and aquatics –Enough pools and riffles –Riparian.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Low Impact Development (LID)
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
WETLANDS, PERMITS, AND CONSTRUCTION INSPECTION Project Inspectors Conference Wilsonville, Oregon Presentation by: Oregon Department of Transportation Environmental.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
What is the Neighborhood and Community Sustainability Grant? Encourage residents to work collaboratively and creatively. Maximum $2500 per year. A competitive.
1 Improving Habitats along Delta Levees Issue Paper Proposed for Council Endorsement Presented by Jessica Davenport January 28, 2016.
MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
October 26, 2016 Amanda Gumbert Extension Water Quality Specialist
Department of Forestry 2004 Stream Habitat Restoration Guidelines
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Mason Gulch landscape Management plan Public meeting
Tom Parker and Sarah Flynn Geum Environmental Consulting, Inc.
2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016.
The Gila River Restoration at Apache Grove
Kevin “Doc” Hoover Water’s Edge Hydrology, Inc.
Shelterwood and clearcut
Common Stream Habitat Problems
Speaker Notes: Objectives & Range Practices Under FRPA
Presentation transcript:

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Off- & Side-Channel Restoration (pg 29) Excavation depth < max. thalweg depth in main channel No floodplain fill with excavated material

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Off- & Side-Channel Restoration (cont.) Requires historic analysis and additional data with Notification

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Set-back Berms, Dikes or Levees; Remove Water Control Structures; Wetland Restoration Uncommon ODOT activities but sometimes… Require Services Approval, additional information with Notification See pgs 29-31

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Breaches > active channel width. Downstream end of the project and/or at the lowest elevation of the floodplain to ensure the flows will naturally recede back into the main channel, thus minimizing fish entrapment. Overburden or fill comprised of native materials, which originated from the project area, may be used within the floodplain to create set-back dikes and fill anthropogenic holes provided that does not impede floodplain function. (Page 29-30)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Other Restoration Activities Activities that need Services approval & likely additional information: –Fish passage restoration (fish weirs may be OK) –Floodplain restoration –Stormwater retrofits Activities that generally do not need approval if meet design standards: –Weed control with herbicides –Large wood and boulder placement –Pile removal, removal of treated wood –Removal of artificial structure or fill from the functional floodplain –Riparian restoration

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Site restoration is required for all temporary disturbances in regulated habitats Goal is to create a self-sustaining habitat within five years similar or better than pre-construction conditions. (Page 32-33) Site Restoration

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Site Restoration Goals Create a Habitat Restoration Plan conforms to FAHP (pg 32-33) Confine human and livestock disturbance Stabilize erosion by minimizing bare soil, active rills, etc. Well distributed native woody and herbaceous vegetation Plants have normal, vigorous growth form Plant litter is well distributed Create a continuous corridor of shrubs and trees appropriate to the site are present to provide shade and other habitat functions

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Tree & Down Timber Salvage Riparian zone impacts Required minimization measure in BA When applicable to project and feasible –Feasible: to be used on-site or designated off-site use & storage location –If off-site, Agency pays up to 60 miles of transportation expenses (recipient, the rest) Native conifer trees & down timber >18”dbh –Salvage and re-use on-site if feasible or off-site if property available Coordinate with LA or Hydraulics designer –Root wad, length ?

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 ODOT recommends basing species composition on pre-construction data or reference sites, differentiated among revegetation units as appropriate for slope and aspect, hydrology, and soils, and will include a range of successional stages (early, mid, and late) following guidance in FHWA’s Roadside Revegetation manual (FHWA 2007). Locate the reference site within the same watershed, ecoregion, or recovery zone (depending on species). Reference sites should have similar site characteristics as the corresponding revegetation unit. eg-documents/roadside-revegetation-manual.pdf (Page 32-33)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Develop achievable standards for revegetation success separately in each revegetation unit to be evaluated each monitoring period. During construction, coordinate with construction office to ensure seeding and plantings are installed properly and during the appropriate planting season, as per Standard Specifications. Perform annual monitoring of habitat restoration areas until site restoration goals and success criteria have been met, following ODOT Biology Mitigation Monitoring standards (available at biology_mon.shtml). (Page 32-33)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013