Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Transfer & Trades Special Transmission Workstream
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
UNC Modifications 061 & 062 – An Overview
Introduction of Code Contingency Guidelines Document
UNC Trader User – Licence obligations
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Transmission Workgroup 6th March 2014
Topic raised at July 2009 Distribution Workstream
QSEC auction timetable
Long Term Non Firm Capacity Update
Introduction of Code Contingency Guidelines Document
Transmission Workstream – Partial Assignment
Entry Capacity Transfer and Trade
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream 05 November 2009
Presentation transcript:

Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008

Background  Concept of releasing strips of non obligated NTS entry capacity first raised November  Discussions with the industry reached consensus to postpone until such time as could be considered in more depth or Industry wished to revisit.  In response to subsequent industry requests National Grid NTS brought 3 options forward to April Transmission workstream:  Option A – Ad-hoc release of non obligated capacity  Option B – As ‘A’ but with associated buy-back  Option C – Scheduled release of non obligated + buy back 2

Background 2  National Grid NTS committed to bring forward a draft enabling modification based on Option A as:  we have seen a clear demand for the product  ability to potentially implement ahead of this winter  and we believe that due to a number of new investments it may be possible to release additional non-obligated capacity this year 3

Proposal – Discretionary Release of Non obligated capacity  National Grid NTS to bring forward an enabling mod that will allow the release of Non Obligated capacity, via an ad hoc auction release, outside of the existing Quarterly & Daily auctions  Less complex UNC modification that will give National Grid NTS greater flexibility in responding to market requirements i.e. can cater for both option A and option B.  Auction rules to be published as part of a set of Terms and Conditions during the invitation process, to be accepted by Users prior to bidding for capacity  Quantity made available to be based on a risk assessment  Potentially minimal system intervention required (expected to be held off-line, but systematised where possible)  Will be taken into account in the calculation of Trade & Transfer exchange rates (once the capacity has been sold it becomes Obligated Firm capacity)  Price paid for the capacity to be equal to or greater than the corresponding MSEC Reserve Price – otherwise there may be significant charging implications. 4

General Issues  There are a number of issues that National Grid NTS will need to consider:  Can this be implemented prior to Winter 08/09  Interaction with Trade & Transfer i.e. if National Grid NTS was to offer non obligated capacity with an associated buy-back  How would ad-hoc processes be initiated  Impact upon the secondary market  Ensuring that the process is non discriminatory 5

Advantages  Will maximise the amount of capacity released to the market  Will increase National Grid NTS’ ability to respond to customer requests, where there is an appropriate risk/reward balance.  Will allow for greater product differentiation i.e. will facilitate both Option A and Option B  Should be limited system issues (will still require xoserve assessment)  There will be minimal ongoing overheads  There is the potential for additional revenue to be passed to Shippers 6

Proposed UNC mod timeline Draft mod presented to work-stream01/05/08 Mod sent to panel15/05/08 Proposal issued for consultation16/05/08 Closeout for reps9/06/08 Final Mod Report issued by JO10/06/08 Mod panel decide upon recommendation19/06/08 Ofgem decision expected21/07/08 Proposed implementation date01/08/08 7

Way Forward  National Grid NTS to raise a draft enabling modification for consideration at the May Panel 8