Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.

Slides:



Advertisements
Similar presentations
World Class Standards Smart Grids ETSI Strategic Topic Philippe Lucas © ETSI All rights reserved ETSI Smart Grid workshop, June 14th 2010.
Advertisements

Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Sistan & Balouchestan Electric Power Distribution Company
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Smart Meters, Demand Response and Energy Efficiency GRIDSCHOOL 2010 MARCH 8-12, 2010  RICHMOND, VIRGINIA INSTITUTE OF PUBLIC UTILITIES ARGONNE NATIONAL.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
1 Smart control of multiple energy commodities on district scale Frans Koene Sustainable places, Nice, 1-3 Oct 2014.
A Survey of Home Energy Management Systems in Future Smart Grid Communications By Muhammad Ishfaq Khan.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
COnvergence of fixed and Mobile BrOadband access/aggregation networks Work programme topic: ICT Future Networks Type of project: Large scale integrating.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
The role of ICT and telecommunication companies as service providers
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Frankfurt (Germany), 6-9 June 2011 Greet Vanalme – NL – RIF Session 6 – Paper 0786 The introduction of local system services – the case of storage in the.
A NEW MARKET PLAYER: THE AGGREGATOR AND ITS INTERACTION WITH THE CONSUMER interaction Ramón Cerero, Iberdrola Distribución Paris, June 9th 2010 ADDRESS.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Smart Metering and the Smart Grid How does it work and what can it do? Will Chaney 1Energy Awareness Week, 3-8 May 2010.
Friday, 09 October Balancing in Microgrids And the role of a DSO Drs. J.H. Blom MBE.
Prof. Valeria Termini AEEGSI Commissioner CEER Vice-President CEER DSO WG co-Chair The Future Role of European DSOs 1.
POTENTIAL AND STRATEGIES FOR DEMAND SIDE MANAGEMENT Dr. Ajay Mathur Director General, Bureau of Energy Efficiency.
G4V- Grid for vehicles Thomas Theisen RWE Analysis of the impact and possibilities of a mass introduction of electric and plug-in hybrid vehicles on the.
Frankfurt (Germany), 6-9 June 2011 MOCCI – IT – RIF Session 5 – Paper 999 Multi-Objective analysis of Regulatory frameworks for Active Distribution Networks.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
M12 GA - Brussels Status of WP6 and next phases 09/09/2015 – Mario Sisinni (SMS)
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
IFIEC ENERGY FORUM Renewable Energy Support Schemes 19 June 2012 BRUSSELS Dr Mukund Bhagwat Corporate Energy Affairs, Aurubis Member of Electricity & Climate.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
Demand Response
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Powered by the Sun, Sustainable through Quality. Who is Suncolect Suncolect provides Solar electricity solutions to entrepreneurs in small, medium and.
THE NEW GENERATION TRANSMISSION By Ashroo M. Das 6 th sem, EEE & Deepak Kumar 6 th sem, EEE.
© 2013 Astutim Ltd Smart Energy SIG Smart Energy SIG The Role of Community Energy Systems in the UK Resilient Energy Supply A Study by the Smart.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
The Role of Energy Storage in Supporting the Energy Transition 23 June 2016 Energy Infrastructure Forum Copenhagen, Denmark Thierry Le Boucher EASE Vice-President.
Eric Peirano, Ph.D., TECHNOFI, COO
Évora demonstrator site
Smart Grid Paul Bircham Commercial Strategy & Support Director.
Eric Peirano, Ph.D., TECHNOFI, COO
Network Innovation Allowance Project: South East Smart Grid
Breakout Session on Smart Grid Data Analytics
System Control based Renewable Energy Resources in Smart Grid Consumer
RealValue H2020 Overview RealValue project funded under H2020 LCE 8 – 2014: Local / small-scale storage Commenced 1st June 2015 (duration 36 months) EU.
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Management of Renewable Energy
EE5900: Cyber-Physical Systems

EV charging – a grid perspective
Integrated Distribution Planning Process
Unlocking Demand Contribution to Distribution Network Management
2500 R Midtown Sacramento Municipal Utility District
Joseph Negreira Pentalateral Energy Forum & European Commission
ISMB – Smart Energy activities
SCORES project presentation
Arslan Ahmad Bashir Student No
How to tackle air pollution
Presentation transcript:

Brussels Workshop Use case 3 11/09/2015 Mario Sisinni

1.Introduction to UC3 Objectives of UC3 Key technologies and optimization tools 2.UC3 Process Reference grid in Wales LV grid data Standard grid Projected grid Smart grid Simulations 3.Issues Grid users and DSO’s objectives

1.Introduction to UC3 Use cases objectives and boundaries Use case 3 This Use Case does attempt to simulate the complex relationships between grid actors, the existing energy markets in the various countries and the related constraints, trying to define a framework in which actors can successfully coexist and the objectives of the project can be achieved. In particular Use case 3 attempts to overcome the issues related to the antagonistic objectives of final customers (that want to pay less) and DSO (that want to reduce losses and consumption). Due to the greater complexity of such a scenario, this only relies on simulations to assess the effectiveness of such an approach. However, while the simulations will demonstrate the technical feasibility of such a mechanism, the economic viability will be analysed in parallel based on the results of the simulations (reduction in grid losses, increased renewable hosting capacity, increased reliability, etc.) and the market constraints of the proposed scenario. Quantified objectives to meet  Peak load reduction at district level up to 15%  Grid losses reduction up to 5-7%  Renewable grid hosting capacity increased by 12-15%  Reduced switch-off time per year Global objectives to meet Enhanced performance, resilience and reliability of the LV grid

1.Introduction to UC3 Key technologies and optimization tools Domestic smart meters & Energy Boxes Used to monitor use of domestic technologies (programmable appliances, storage, RES, EV) and provide the MAS with forecasted information for the optimization. MAS (Multi Agent System) Used to carry out a local optimization of the flexibility provided by smart technologies (both domestic and district ones) and meet project’s objectives (grid balancing and enhanced performance). Link Boxes Used to connect two substations at LV level to (i) enable flexibility between adjacent LV grids and (ii) allow transformers to be switched off in periods of low demand, thus reducing overall grid losses.

Reference grid in Wales DNO: Western Power Distribution (WPD), South Wales Area: Trevethin, Pontypool 2.UC3 process

LV grid data WPD provided us with average data of different type of users of the reference standard grid Data will be diversified to provide each node of the reference standard grid with a load profile A model of the reference standard grid will be simulated to calculate the current performances of the reference LV grid 2.UC3 process

Standard grid Our standard grid only includes domestic or small commercial users The standard grid has a radial configuration. There is no direct connection between substations at LV level. 2.UC3 process

Projected grid Projected profiles are created using smart grid’s scenarios based on UK National grid studies. The projected grid includes Link boxes and district and domestic smart technologies (RES, storage, EV, programmable appliances). Domestic users are provided with smart Energy boxes that monitor use of domestic appliances. 2.UC3 process

Smart grid Flexibility provided by domestic and district smart technologies is managed locally based on DSO’s objectives (e.g. peak reduction). The optimization of the use of smart technologies is provided by the MAS and is based on forecasted information (e.g. price of electricity, weather conditions, programmed use of smart appliances, etc.). The respect of grid voltage statutory limits at all nodes is instead checked using an electrical simulation of the grid. This is also used to calculate the performance of the smart grid. 2.UC3 process

SimulationsObjectiveSoftware 1) Standard grid Show the current performance of the standard grid Results to be compared with projected and smart grid’s ones to assess the achievement of the objectives of the project. Grid-Lab D 2) Projected grid Show the performances of the projected grid (not yet smart) Results to be compared with optimised smart grid’s ones to assess the achievement of the objectives of the project. Grid-Lab D 3) Smart grid (with local MAS optimization) Demonstrate the benefits of local optimization. Results to be compared with standards and projected grids’ ones to assess the achievement of the objectives of the projects Grid-Lab D + MAS (Full optimization) Simulations Smart grid varying conditions Price of electricity Weather conditions Period of the year Day of the week Smart grid Optimization/Simulation’s potential objectives Maximise grid power quality conditions Maximise peak reduction Maximise efficient use of storage systems (charging and discharging cycles) Maximise final user’s energy savings or reduction in energy expenditure Maximise time in which local portion of the grid can work “stand alone” Combination of the previous The comparison between the results of smart grid simulations and the initial projected & standard grid ones will be used to assess the achievement of the project’s objectives. 2.UC3 process

Simulations 2.UC3 process The MAS is used to optimise use of smart grid’s elements according to external varying conditions and objectives of the optimization. Projected profiles for each node Forecasted information (price of electricity, renewable generation, etc.) Available flexibility Objective of the optimization MAS optimises use of the smart grid’s elements and provides updated profiles Profiles are used into electrical simulation to check that grid statutory limits and physical constraints are always met at all nodes. Every time additional information is provided the process starts again Final profiles for each time step are recorded for assessment Grid physical constraints are part of the optimization

3.Issues The objective of domestic users is to use flexibility provided by their smart appliances to reduce their energy expenditure. The objective of DSOs is to ensure LV grid balancing, respect of voltage and power quality statutory limits and to improve grid performances (reduction of peaks and grid losses) using flexibility. The coincidence of the two objectives not always occur Which could be a technically and economically viable way to overcome the problem of the conflicting objectives of the various actors of the grid?

3.Issues -Incentives Domestic users are rewarded with incentives when they do not use their flexibility to meet their own objectives (bill based on tarriff structure and eventual purchase agreement for RES), but the DSO’s ones. This approach is based on an enhanced demand-side management of small customers or rise of ‘decentralized’ production (such as mini-CHP, PV,...) and storage, with great involvement of the domestic user. CHALLENGES: Definition of incentives, legal constraints to use domestic users data, economic viability of the mechanism, involvement of the domestic user. -Establishment of a local flexibility market. Flexibility provided by domestic users is bid to a local flexibility market. Flexibility is bought by district management according to DSO’s objective by choosing the lowest bid. Domestic users are rewarded for the provision of flexibility at least the amount they are losing by not using their flexibility to meet their own objectives. MAIN CHALLENGES: Definition of bids, economic viability of the mechanism, technical (possible answer : MAS platform) Possible solutions:

Thank You