Quantitative Safety Information and Project Development Session 8 Policy Level Issues Related to Safety Timothy Neuman, PE Chief Highway Engineer CH2M.

Slides:



Advertisements
Similar presentations
HSM Implementation Tools Safety Analyst
Advertisements

Ministry of Transportation RISK MANAGEMENT FOR GEOMETRIC DESIGN AASHTO Sub-Committee Design July 2009 Gary Todd, P. Eng. Manager, Design & Contract Standards.
Flexibilities in VDOT’s Design Policies and Standards 2012.
New I-65 Interchange at Worthsville Road Welcome!.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
Oregon Pedestrian and Bicycle Safety Implementation Plan.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
ENVIRONMENTAL MANAGEMENT PLAN
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Road Safety Audits Ghazwan al-Haji PhD student ”On whats goes wrong in road design and how to put it right safely”
Safety Audit Components Safety assessment for risk Management.
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Codex Guidelines for the Application of HACCP
I n t e g r a t I n g C S S Practitioner Module 5 1 Module 5: CSS and Livability in Project Development.
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
Environmental Impact Assessment (EIA): Overview
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Local Government Section
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Risk Management for Highway Design Jeffrey Shaw, P.E. Safety & Design TST.
Incorporating Safety into Design CE 453 – Highway Design October 2, 2006 Jerry Roche, P.E. Transportation Safety Engineer FHWA – Iowa Division Federal.
HSM Use and Training Karen K. Dixon, Ph.D., P.E. Oregon State University.
Introduction: Overview of Roadway Safety Management Safety Analysis in a Data-limited, Local Agency Environment: July 22, Boise, Idaho 1 Module.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Design Speed and Target Speed Norman W. Garrick Lecture 3.1 Street and Highway Design Norman W. Garrick Lecture 3.1 Street and Highway Design.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Putting Together a Safety Program Kevin J. Haas, P.E.—Traffic Investigations Engineer Oregon Department of Transportation Traffic—Roadway Section (Salem,
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Development of Guide Developed through two Cooperative Research Program (NCHRP and TCRP) projects over the past several years. Resulting research report.
Highway Safety Analysis: Engineering Kenneth Epstein, P.E. Federal Highway Administration Office of Safety Programs Safety Data and Analysis Tools Workshop.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Introduction – Session #1.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Highway Infrastructure and Operations Safety Research Needs (NCHRP 17-48) Prime Contractor: UNC Highway Safety Research Center Subcontractors: VHB Jim.
Geometric Design: General Concept CE331 Transportation Engineering.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Continual Service Improvement Methods & Techniques.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
PURPOSE & NEED Categorical Exclusion Training Class.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Geometric Design Strategic Research Program Transportation Research Board AFB10 Geometric Design Committee Brian L. Ray, PE Committee Chair July 27, 2010.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
Preserving the Lost Art of Geometric Design: Tools, Techniques and Talent TRB Workshop - January 23, 2011 Understanding the Art Mark Doctor, PE Federal.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Interdisciplinary teams Existing or new roadway
MoDOT Highway Safety Manual Implementation
Data-Driven Safety Analysis
NDOT HSM Nevda Transportation Conference
HSE Case: Risk Based Approach.
MPO Board Presentation
Presentation transcript:

Quantitative Safety Information and Project Development Session 8 Policy Level Issues Related to Safety Timothy Neuman, PE Chief Highway Engineer CH2M HILL

Presentation Overview How will the availability of system- wide quantitative safety information influence agency project development processes? What types of policies are envisioned to be most affected? What organizational and educational barriers need to be overcome? July 29 and 30, 20092

Transportation Agency Responsibilities Programming and Prioritization Project Development Operations and Maintenance

Project Development Process Problem Definition Decision and Evaluation Framework Design Studies (Alternatives) Screening and selection of preferred Preliminary and Final Design

July 29 and 30, 2009 Project Development Risks Abound Costs and impacts must be justified to be acceptable to regulatory agencies (assuming adversarial interests or resource conflicts exist) Some stakeholder opposition must be assumed for essentially every project Purpose and need must be defensible Recommended solutions must be effective and defensible (per proven solutions or industry best practices)

Safety Information and Project Development Is safety truly part of the problem or not? If so, what is the specific safety problem? If not, then what is the problem? If the problem is truly a safety one, then what solutions make sense? If it is a congestion or other problem the universe of solutions is different. How important is safety relative to other factors in developing and screening alternatives? Are design exceptions acceptable or not? If so, what types? Where? Under what circumstances? Problem Definition Decision and Evaluation Framework Design Studies (Alternatives) Screening and selection of preferred Preliminary and Final Design

Project Development Issues Defining Purpose and Need (problem statement) Project Type and Safety Information – New Construction – Reconstruction – 3R Alternatives development, analysis and decision-making Agency liability and risk management

Project ‘purpose and need’ drives the environmental decision- making process Replacement of infrastructure in disrepair Congestion or traffic operational problems Safety (crash prevention and/or severity mitigation)

The way things are today Not every project is driven by safety… But most purpose and need statements assert safety as a driver Solutions may or may not specifically deal with safety (other ‘drivers’ generally prevail) Challenges to EISs and EAs are the primary means of stalling or halting otherwise good projects

SPIs (and other tools) offer objective, defensible means of characterizing safety problems AADT Crash # SPF observed # at a location expected # from peer group corrected # at this location Potential for Safety Improvement (PSI)

Project Type Definitions New construction (projects on new alignment) New construction (projects on new alignment) Reconstruction of existing facility Reconstruction of existing facility Resurfacing, restoration or rehabilitation (‘3R’) Resurfacing, restoration or rehabilitation (‘3R’)

The Green Book encourages 3R designation where it is appropriate Specific site investigations and crash history analysis often indicate that the existing design features are performing in a satisfactory manner. The cost of full reconstruction for these facilities, particularly where major realignment is not needed, will often not be justified.’ ‘Specific site investigations and crash history analysis often indicate that the existing design features are performing in a satisfactory manner. The cost of full reconstruction for these facilities, particularly where major realignment is not needed, will often not be justified.’ Green Book Foreword, pg xliii

The way things are today – Nominal safety drives project type decisions Nominal Safety is examined in reference to compliance with standards, warrants, guidelines and sanctioned design procedures Nominal Safety is examined in reference to compliance with standards, warrants, guidelines and sanctioned design procedures Substantive Safety is the expected or actual crash frequency and severity for a highway or roadway Substantive Safety is the expected or actual crash frequency and severity for a highway or roadway *Ezra Hauer, ITE Traffic Safety Toolbox Introduction, 1999 Is this road ‘safe’?

Project Development Process Problem Definition Decision and Evaluation Framework Design Studies (Alternatives) Screening and selection of preferred Preliminary and Final Design

Designers have many choices to make Number and type of lanes; shoulders Number and type of lanes; shoulders Presence, type and width of medians Presence, type and width of medians Accommodation of bicyclists and pedestrians Accommodation of bicyclists and pedestrians Accommodation of transit vehicles Accommodation of transit vehicles Traffic control strategies Traffic control strategies Design level of service Design level of service Intersection types Intersection types Access control Access control

Objective Safety Information Supports Project Evaluations and Decisions

Objective safety information informs and improves decisions Type of facility Effect of varying cross section dimensions Effect of alignment Access control policies and solutions Roadside design policies Intersection design solutions Traffic control strategies etc.

Project Development Process Problem Definition Decision and Evaluation Framework Design Studies (Alternatives) Screening and selection of preferred Preliminary and Final Design

Design Exceptions are part of project development Understand objective operational and safety effects of potential design exceptions Understand objective operational and safety effects of potential design exceptions Employ proven, safety-effective mitigation strategies Employ proven, safety-effective mitigation strategies Fully document the design exception and mitigation approach Fully document the design exception and mitigation approach

Potential project development policy changes 3R design criteria Identifying safety as a key ‘purpose and need’ element Revisions to agency standard design solutions New tasks or reports integrated with other technical work (e.g., design study reports, interchange justification reports, design exceptions requests)

Potential programming policy changes Project scoping (3R vs. reconstruction) to incorporate quantitative safety up front Criteria for considering conversion of two- lane highway to multi-lane facility; or other basic capacity improvements Allocation of funding for safety-driven projects vs. other priorities based on confidence in information and demonstrated paybacks

Policy Level Data Issues Acquisition and Maintenance of Safety Data – Not just crashes – Traffic counts (more, intersections) – Geometric (including roadside) – Traffic control Substantive Safety Based Policies

Cultural and Educational Barriers to Overcome Exploding the ‘Safety always comes first’ myth Balancing safety against other values is not only ok, it is what we should have been doing all along Recognizing ‘safety’ as a continuum and not an absolute Coming to grips with the fact that some things we do are ‘less safe’ than the alternative that we don’t like for other reasons Understanding design decisions as discretionary in nature

Organizational Barriers to Overcome Scientific safety information is too important to be relegated to just your safety program Safety Divisions/Bureaus have roles to play in essentially all projects at all levels Safety asset acquisition and management needs to become a priority (across Divisions/offices) Project development teams must include safety expertise Designers and other problem solvers must enhance their basic understanding of safety science

A View to the Future Decisions based on objective information are better decisions; we ought to do a better job Resources spent in the name of safety will actually produce measurable safety benefits Proven successes will lead to re-allocation of limited resources Design standards and criteria will evolve to more closely reflect the science of safety Performance based design processes may eventually supplant standards based approaches

Questions and Discussion