ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.

Slides:



Advertisements
Similar presentations
SRF Beam Test Facility at NML Jerry Leibfritz April 26, 2010.
Advertisements

Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Meeting summary (so far, Monday morning) and comments Tom Peterson, Camille Ginsburg (FNAL), Alex Ratti (LBNL) Crab Cavity Meeting, CERN, 1-6 Aug 2013.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group: C.Sylvester, Y.Huang, R.Nehring, J.Ozelis, T.Peterson, V.Poloubotko, R.Rabehl, I.Rakhno,
Fermilab Vertical Cavity Test Facility (VCTF) VTS2&3 Project Status Ruben Carcagno, Camille Ginsburg, and Cosmore Sylvester On behalf of the VTS Group.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
Shielding studies for SRF cavities at Fermilab Camille Ginsburg and Igor Rakhno Fermilab, Batavia, Illinois 60510, USA 1SATIF-10, CERNJune 2-4, 2010.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Fermilab IB1 Vertical Test Stand Update C.M. Ginsburg (Fermilab) for the VTS group August 31, ft.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
February 13, 2007C.M. Ginsburg (Fermilab-TD)1 Fermilab Vertical Test Facility for ILC cavities Vertical Cavity Test Facility (VCTF) IB1 infrastructure.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
FNAL ILC LLRF Controls and Fast Tuner R&D Status Ruben Carcagno, Brian Chase, Gustavo Cancelo, Yuriy Pischalnikov (on behalf of the FNAL LLRF Working Group)
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Horizontal Test Stand – 2 (HTS-2) Joe Ozelis PIP-II Collaboration Meeting 9-10 November, 2015.
Radiation studies for the MI collimation system and ILC vertical cryostat test area December 13, 2006 Igor Rakhno Accelerator Physics Department.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Vertical Test Stand Update
WP High Beta Cavities Delivery
RF Systems and Controls for the LERF CM Tests
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
ILC R&D Board Meeting: SRF Cavities Status and Plans
Progress and Issues with VTS Upgrade
Chris Adolphsen Sergei Nagaitsev
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Accelerator Module Test Facility
Recent SCRF Activities in IHEP
HIE-LINAC status report
Infrastructure and Test Facilities in the U.S.
IHEP Cryomodule Status
Advanced Research Electron Accelerator Laboratory
ILC Main Linac Superconducting Splittable Quadrupole
Presented by: Ruben Carcagno
Presentation transcript:

ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for the ILCTA_IB1_VTS group: Chuck Brown, Ruben Carcagno, Yuenian Huang, Andrei Lunin, Joe Ozelis, Ralph Pasquinelli, Tom Peterson, Igor Rakhno, Cosmore Sylvester, Roger Rabehl, Clark Reid, Mayling Wong

4.May.2006C.M.Ginsburg ILCTA mtg2 Test bare 1.3 GHz 9-cell SRF cavities Measure Q vs. T Measure Q vs. E acc at 2 K 250 W (CW) max RF power required –for Q>5x10 9, E acc <35 MV/m ILCTA_IB1_VTS Specification

4.May.2006C.M.Ginsburg ILCTA mtg3 Existing Magnet Test Facility  cryogenic cooling capability of 125 W at 2 K Install in a vertical pit in the floor Protect existing offices and work spaces Maintain “Controlled Area” status <5 mrem/hr immediately outside shielding <0.25 mrem/hr in normal working areas Fermilab Industrial Building 1 Existing cryogenic utilities & vacuum lines ILCTA_IB1_VTS Location

4.May.2006C.M.Ginsburg ILCTA mtg4 X-rays est’d from DESY data Shielding design ~complete Tritium production negligible “Controlled area” satisfied ILCTA_IB1_VTS Rad Shielding

4.May.2006C.M.Ginsburg ILCTA mtg5 ILCTA_IB1_VTS Status Civil construction (shaft, pit, in-ground radiation shielding) design done, in vendor bid process Radiation shielding lid design ~done Cryogenic capability study completed, document in preparation Cryostat design is advanced, order soon, then complete top plate design P&ID (process and instrumentation diagram) for cryogenic system complete, order instrumentation soon Instrumentation, rack layout, etc. has begun RF, LLRF, controls system design underway

4.May.2006C.M.Ginsburg ILCTA mtg6 ILCTA_IB1_VTS  end FY06 Civil construction to be done ~ end July Fabricate cryostat (vendor) and top plate (Fermilab), purchase valves, instrumentation, pumps, magnetic shielding, etc. Design radiation shielding lid mechanical engineering aspects (movement, plan to assemble the pieces), procure parts, and begin radiation safety interlock design Cryogenic infrastructure modifications RF, LLRF, controls system design well underway and start procurement

4.May.2006C.M.Ginsburg ILCTA mtg7 ILCTA_IB1_VTS FY07 plans Install cryostat into prepared pit Assemble radiation shielding lid Complete installation of RF, controls, instrumentation, etc. Assemble radiation safety interlock system Complete test stand assembly Operational readiness review Commission cryogenic system Commission test stand Begin cavity tests (!)