SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"

Slides:



Advertisements
Similar presentations
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Advertisements

SADC HPC Workshop, 2 Dec 2013, Cape Town
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
S Y S T E M S E N G I N E E R I N G.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Design Concepts and Principles
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
SKA TDP Advisory Committee Report to US SKA Consortium, 17 November 2008, Madison Trish Henning.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 Summary, Conclusions and Actions Marco de Vos
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
IACT 901 Module 10 1 Plan Delivery. IACT 901 Module 10 2 Elements of IS & IT Plans Delivered Comprise Overall IS/IT vision Applications development plan.
University of Jyväskylä – Department of Mathematical Information Technology Computer Science Teacher Education ICNEE 2004 Topic Case Driven Approach for.
Engineering Systems of.
Enterprise Architecture
Effective Methods for Software and Systems Integration
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Chapter 2 The process Process, Methods, and Tools
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
The Challenge of IT-Business Alignment
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Software Engineering Lecture # 17
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Casper Signal Processing Workshop 2009 SKA Signal Processing (Preliminary) Wallace Turner Domain Specialist for Signal Processing.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Rosie Bolton SKADS Workshop April 10th 2008 SKADS Costing work: beyond the benchmark scenario Rosie Bolton Paul Alexander, Andy Faulkner and SKADS Costing.
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
OWL Concept Design Review Report to ESO Council 8 th Dec 2005.
Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
Smart Home Technologies
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
© NALO Solutions Limited NALO Solutions, presents the – Revenue Collector App Using Mobile Phones to gather Revenue SOFTWARE ENGINEERING.
SYSE 802 John D. McGregor Module 0 Session 3 Systems Engineering QuickView.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Camera PDR/CD1 Planning 19 September 2008
CINEMA System Engineering
Lecture 9- Design Concepts and Principles
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
PM view of SAFe SAFe Construction Planning Workshop A J Casson
Rational Unified Process
1 PIANC and the Environment Working WITH Nature
Lecture 9- Design Concepts and Principles
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
SADT Overall Summary Total ICD count is currently 37 system level ICDs across 6 Elements LFAA 3 ICDs DISHES 7 ICDs CSP 12 ICDs TM ? Unable to proceed.
SKADS White Paper - Technologies -
DVA1 as Part of the Dish Verification Program (DVP) Washington, DC P
CoDR Scope Definition, Objectives & Agenda Jodrell Bank
Presentation transcript:

SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"

SPDO The System in Context Level 4 Level 5 Subsystem Level 6 System Level 7 User system Data links Dish AA-lowInfrastructure Receiver WBSPF PAF Station Processor Receptor Roads Buildings Trenching System Dish Array User System (See full hierarchy presented as part of R. Schilizzi’s talk yesterday)

SPDO SKA High Level Conceptual SKA1 System Block Diagram

SPDO SKA Memo 125

SPDO Memo 125 – Summary (1) Definition of Baseline –Low frequency sparse aperture array –Dish array –Signal transport and networks –Correlator and Non visibility processor –Central Data Processing, Science Processing and System Software. –Central timing and synchronisation subsystem, including time and frequency reference distribution, – Infrastructure (buildings, roads, facilities, labs etc.), –Power delivery and distribution, –Support and maintenance equipment and facilities

SPDO Memo 125 – Summary (2) Advanced Instrumentation Program –Dense Aperture Arrays –Phased Array Feeds –Ultra Wide band Single Pixel Feeds Decision points for AIP identified –2016, or –As modular sub-systems of the SKA1 dishes How do we continue with the SKA definition and design and at the same time take all of these aspects into consideration?

SPDO To this! 1. How do we get to this? 2. How do we move from this …..

SPDO Challenges Challenges include: –Maintaining a focus on full SKA –Definition of potential Phase 2 envelopes to ensure Phase 1 extensibility for example:  Scope of the infrastructure to be developed for Phase 1 balancing cost and Phase 2 view/extension –Selection of receptor technologies for Phase 2 in 2016 implies that the full scope, definition and design of Phase 2 will only be finalised after selection –Potentially higher costs because of wrong choices and resulting rework –Degree of integration of the AIP receptors with the Phase 1 instrument –Guard against discontinuity in buildout –Carry risks for longer

SPDO Route to SKA How do we continue with the SKA definition and design and at the same time take all of these aspects into consideration? Recently a conceptual Route to SKA was developed attempting to maintain the structure of the project but at the same time maintain flexibility to accommodate all the identified future enhancements. Always maintain focus on the full SKA.

SPDO Graphical Representation (from PEP)

SPDO

SKA1 From the SKA1 science requirements (Memo 125) –Derive the SKA1 technical requirements –Develop initial SKA2 system technical requirements based on the science requirements contained in the Design Reference Mission (DRM). Derive all other requirements Perform preliminary system design for SKA1 –To be informed by early preliminary designs for the SKA2 options, so as to ensure extendibility to SKA2. –Tradeoffs of performance against cost. Full detailed design for SKA1.

SPDO SKA2 To inform the SKA1 design process –Draft initial technical requirements for the four system options for SKA2 (Baseline Technology alone + the three AIP options in combination with the Baseline Technology), –Carry out early preliminary system designs for each of the options. Continue to track Phase 2 requirements to prepare for a decision on technology selection in 2016.

SPDO AIP The AIP will build up the level of maturity in anticipation of their utilisation in SKA1 and SKA2. General steps: –Analyse the SKA requirements to maximise potential to enhance system performance, achieve more of the initial system requirements and/or reduce cost, as compared with the baseline. –Develop a preliminary design assuming the particular AIP technology will be used at the element or subsystem level of the system. –Carry out a verification program to test the level of achievement of requirements, to develop performance/cost models for the AIP technology, and to ascertain remaining risk.

SPDO Requirements emanate from various sources Obsolescence Standardisation Skill level of maintainers Test equipment Simulators ….

SPDO Flow of requirements Science and others System Element Sub-system Existing Solution 1 Comply to? Existing Solution 2 Requirements Top - down Bottom - up New Solution

SPDO Process in more detail CoDRs System Element 1 System Element 2 Element 3 Element 1 Element 2 Element 3 SRRs Subsystem 1 System Science and other requirements Subsystem 1

SPDO How does it all fit together? Time (More comprehensive view) Memo 125

SPDO Verification Programs Example considerations: –What is the aim of the verification program? –Which requirements will be verified and how? –If not all, will a next development model be built and tested to verify these requirements? –Other considerations?

SPDO Where are we? System CoDR was held in February 2010 –Provided guidance an all these aspects –Documents available at WP2 wiki:   WP2 wiki Memo 125 System documents being reworked for delta CoDR in February 2011 Will be followed by element level CoDRs during 2011 System Requirements Review in 2012.

SPDO Other presentations for reference Annual WP2 meeting (October in Oxford) –Presentations available of SKA Indico Site –Turner  Systems Methodology for the SKA –Dewdney  Refining the DRM & Deriving Technical Requirements –Cloete  System Design Plan  System Engineering Tools and Strategies  WP2 planning and Beyond PrepSKA –McCool, Hall, Bolton  Costing Strategy

SPDO Thank you