Steve Lewis Gas Detector 6 December 2006 1 Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector.

Slides:



Advertisements
Similar presentations
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
Advertisements

EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
ESS Test and Prototyping Activities Daniel Piso Ferńandez December 4, 2014.
PLC DEVELOPMENTS FOR NEW VACUUM DEVICES IN THE LHC AND NA62
Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Week/FAC October, 2005 Steve Lewis X-ray Transport, Optics,
Page 1 © J. Paul Robinson, Purdue University BMS 602/631 - LECTURE 8 Flow Cytometry: Theory Purdue University Office: Fax
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
Page 1 © J.Paul Robinson, Purdue University BMS 631 – LECTURE007.PPT BMS 602/631 - LECTURE 8 Flow Cytometry: Theory J. Paul Robinson Professor.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
The DESY Gas Monitor Detector (GMD) at the SXR beamline at LCLS Stefan Moeller, LCLS Kai Tiedtke, Svea Kreis, Fini Jastrow, Andrei Sorokin (DESY) Michael.
OPTICAL DETECTORS IN FIBER OPTIC RECEIVERS.
Ion Source Test Stand Vacuum Control System Johnny Tang.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Slide # 1 Examples of pressure sensor packaging Temperature characteristics of a piezoresistive pressure sensor. Transfer function at three different temperatures.
Power Stabilization of the 35W Reference System Frank Seifert, Patrick Kwee, Benno Willke, Karsten Danzmann Max-Planck-Institute for Gravitational Physics.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS Vacuum Objects Specifications Review Sebastien Blanchard TE/VSC Interlocks,
Hall C’s HMS PLC Controls by Steven Lassiter. What Constituents a PLC System PLC (processors) Programming. I/O modules. Field Device Signals (sometimes.
Steve Lewis XTOD Controls FDR 14 February 2008 XTOD Instrument Controls Final Design Review Steve Lewis 14 February 2008.
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
Photon detection Visible or near-visible wavelengths
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Ethernet (EPICS VLAN) IOC Gauge ControllerMass Flow ControllerTurbo Pump Controller Analog and Digital Signals Beamline Gate Valves Mass Flow Unit Turbo.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Fast Detectors for Medical and Particle Physics Applications Wilfried Vogel Hamamatsu Photonics France March 8, 2007.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
th KPS meeting 1 Development of Radon Monitoring Detector for the KIMS Experiment Lee, Myoung Jae DMRC, Seoul national university.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Sofia_SIRAD_LAZIO. Sofia_SIRAD The first variant of apparatus Sofia_SIRAD for on board of ISS investigations mechanical structure was design; The first.
Programmable Logic Controller (PLC)
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Photodetectors What is photodetector (PD)? Photodetector properties
The recent history and current state of the linac control system Tom Himel Dec 1,
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
Optical Receivers Theory and Operation
Steve Lewis Controls: Vacuum 5 April, 2005 UCRL-PRES LCLS Week 5 April, 2005 Steve Lewis Vacuum Standards.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
EKT 314/4 WEEK 5 : CHAPTER 3 SIGNAL CONDITIONING ELECTRONIC INSTRUMENTATION.
Silicon Photomultiplier Development at GRAPES-3 K.C.Ravindran T.I.F.R, OOTY WAPP 2010 Worshop On behalf of GRAPES-3 Collaboration.
Topic Report Photodetector and CCD
Philips LumiLEDs LUXEON UV I( ,  ) = cos(  ) The emitting surface looks smaller at an angle.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Activities at SMI/Vienna in testing the performance of SiPMs
SESAME Control System Status
Current Status of IPM-Linac Control System
Conversion of optical signal into an electric one.
352MHz Klystron Control for the 3MeV Linac test stand
Data Acquisition Systems
Σ-D Analog to Digital Converter for CMOS Image Sensors Nonu Singh (RIT, MicroE Co-Op) Background After fabricating an imaging sensor it needs to be characterized.
SC1R Cold Box PDR Controls
EPICS Controls Steve Lewis 13 December 2007
GRETINA Gamma-ray Tracker Status and EPICS Usage
Analog and Digital Instruments
KAGRA PLC System Overview
3 GHz and 30 GHz Conditioning Programs
FEE Diagnostics and Commissioning
LCLS Week 4-8 April, 2005 Steve Lewis
1.5.4 The High-Voltage Power Supply : The high-voltage power supply (HVPS) provides a positive or negative voltage necessary for.
DOE Review 7-9 February, 2006 Steve Lewis
Presentation transcript:

Steve Lewis Gas Detector 6 December Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector Preliminary Design Review

Steve Lewis Gas Detector 6 December Design and Layout Use of LCLS Standards Top-level Diagram Replicate Two Identical Sections Design Process Suitable hardware chosen by consensus Signals counted and assigned to I/O blocks (PLC, VME) I/O blocks assigned to PLCs and IOCs Network requirements derived

Steve Lewis Gas Detector 6 December Uses LCLS Global Standards EPICS (LCLS-provided): Some device drivers Device-level GUI elements All other tools and utilities (Matlab, StripCharts, Data archiving, etc) EPICS (LLNL-provided using guidelines) Names P&ID-level GUI elements Sequences New device drivers (digitizer)

Steve Lewis Gas Detector 6 December Apparatus Temperature Measurement Temperature EPICS Control System (includes PLC) On/Off, Pressure Vacuum Pumps, Gauges, Valves Gain,,Temp,HV DC Bias+ Cooling+Preamp Digitizer Signal Trigger Gas Detector: Block Diagram X,Y,dX,dY,dZ Motion Control Position Motor+ Encoder Power Supply On/Off, Current, Voltage Magnet 5 On/Off, Pressure Gas Pressure Controller Avalanche Photodiode Shape Shaping Amplifier Digitizer Signal Trigger Photodiode Shape Shaping Amplifier Digitizer Signal Trigger Photomultiplier Tube Filter Motion Control Selection Motor+ Encoder Voltage, Current HV Power Supply Note: 2 units required Trigger source not shown Digitizers may be common 2

Steve Lewis Gas Detector 6 December Uses LCLS Global Standards Gas Detector and Gas Attenuator vacuum and gas-flow controls are treated as a single entity PLC provides basic interlocking EPICS sequences choreograph transitions between major states (vacuum-all-through; detectors-only; detectors-and-attenuator; etc) Gas Detector processed measurements will be fed to experiments (XES/LUSI) and elsewhere via timing system (per pulse) as well as via PVs (slow) PLC reports to MPS for critical items

Steve Lewis Gas Detector 6 December Gas Detector Photodetectors Photodiode Advanced Photonix SD444 Active area: 100mm 2 350nm: 0.11A/W Max dark current: 52 nA Photomultiplier Tube Hamamatsu R1464 Active area: 177mm 2 350nm: 4.9x10 3 A/W Max dark current: 20 nA Avalanche Photodiode Advanced Photonix SD444 Bare detector specs: Active area: 78.5mm 2 350nm: 45A/W Max dark current: 35 nA

Steve Lewis Gas Detector 6 December Photodetector Signal Levels PMTAPDPD Noise Floor Saturation Hard X-ray signal range Soft X-ray signal range Bare APD Noise Floor APD Module Noise Floor APD Module Saturation